DOI QR코드

DOI QR Code

Development of a Flash-based Schedule Management Tool for Smart Devices

  • Jang, Myunghoun (Department of Architectural Engineering, Jeju National University)
  • Received : 2012.05.03
  • Accepted : 2012.06.13
  • Published : 2012.12.20

Abstract

Schedule management of construction work is critical to completing construction projects within a given period of time. Many efforts have been made and multiple tools have been developed to support the management of construction projects using smart devices such as smartphones and tablet PCs. This study proposed a method for managing construction schedules via a smart device using Flash. The interactive and graphic properties of Flash enable the development of an app that can allow a field manager to manage schedules easily and efficiently. A prototype was implemented using Adobe Flex Builder, and a sample network was applied in a smartphone. It is convenient for a construction manager to manage construction schedules using the tool because Flash controls graphic components easily. In further studies, network diagrams such as CPM (Critical Path Method) should be developed and applied to the app.

Keywords

References

  1. Na SW, Lee YH, Jee SS. Security Issues and Strategies of Smart Phone and Mobile Office. CIO(Chief Information Officer) Report. 2010 Oct;26(1):2-28.
  2. Youn SW, Chin SY, Park MS, Kwak MS, Choi CH. A Development of Project Management Information System using SMART Phone. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon, Korea. Seoul (Korea): Korea Institute of Construction Engineering and Management; c2010. p. 19-20.
  3. Jang MH. Development of a web-based Schedule Tool Using Flash. Journal of the Korea Institute of Building Construction. 2010 Apr;10(2):51-7. https://doi.org/10.5345/JKIC.2010.10.2.051
  4. Ahn CS, Lee MK, Kim YJ, Kim SA, Yoon SW, Chin SY. A study on the Smart phone Application Development and Its direction Considering Construction Site Characteristics. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon, Korea. Seoul (Korea), Korea Institute of Construction Engineering and Management; c2010. p. 113-4.
  5. Yoon SW, Chin SY, Park MS, Kwag MS, Choi CH. A Development of Project Management Information System using SMART Phone. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon, Korea. Seoul (Korea), Korea Institute of Construction Engineering and Management; c2010. p. 19-20.
  6. Lee MK, Ahn CS, Kim YJ, Kim SA, Yoon SW, Chin SY. A Proposal on Efficient Construction Site Work Management Plan Using Smart-Phone. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon (Korea). Seoul (Korea), Korea Institute of Construction Engineering and Management; c2010. p. 317-8.
  7. Kim EJ, Park MS, Lee HS. Suggestion of Safety Management Smartphone Application based on PMIS. Proceedings of Architectural Institute of Korea Annual Conference; 2010 Oct 23; Cheongju (Korea). Seoul (Korea), Architectural Institute of Korea; c2010. p. 343-4.
  8. Choi YG, Hwang KH, Lee MK, Kim SA, Yoon SW, Chin SY. The Plan Using an Auto Information Sensor for an Efficient Construction Information Gathering and Recording. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon, Korea. Seoul (Korea), Korea Institute of Construction Engineering and Management; c2010. p. 168-9.
  9. Lee KP, Lee HS, Park MS, Kim EJ. Construction Material Management Using Smart Mobile Computing. Journal of Korea Institute of Construction Engineering and Management. 2011 June;12(2):59-69. https://doi.org/10.6106/KJCEM.2011.12.4.59
  10. Kim YJ, Ahn CS, Choi YG, Kim SA, Yoon SW, Chin SY. A Study on Method to Progress Management based Augmented Reality(AR) on Smartphone. Proceedings of Korea Institute of Construction Engineering and Management Annual Conference; 2010 Nov 5-6; Incheon, Korea. Seoul (Korea), Korea Institute of Construction Engineering and Management; c2010. p. 156-7.
  11. Chang JR, Hsu HM, Chao SJ. Development of a Road Monitoring and Reporting System Based on Location-Based Services and Augmented Reality Technologies. ASCE Journal of Performance of Constructed Facilities. Not printed (Accepted on August 1, 2011)
  12. Lee WJ, Choi WW. A Case of Smart Phone Application to Construction Industry. Korean Journal of Institute of Construction Engineering and Management. 2010 Oct;11(5):30-4.
  13. Lee WJ, Choi WW. A Study of GS E&C's Project Management System in Using of Smart Phone. Review of Architecture and Building Science. 2011 Jan;55(1):54-7.