• Title/Summary/Keyword: construction fee

Search Result 115, Processing Time 0.021 seconds

A Study on Boarding Fee Determinants of University Dormitory (대학 기숙사의 기숙사비 결정 요인에 관한 연구)

  • Lee, Joong-Sik;Yoo, Seon-Jong
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.21 no.3
    • /
    • pp.29-36
    • /
    • 2014
  • Properties of school foundation are divided into fundamental property for education and fundamental property for profit. As school sites and teachers used for educational and study activities of students, fundamental property for education includes practice sites, farms and support research attached facilities in addition to school facilities. According to the Clause 1 of Article 4 of the University Foundation and Management Regulation and the Attached Table 2 of the Same Regulation, dormitory is classified as property for education(non-profit). In other words, there is no need to create profit for dormitory management. It is supposed that there are little regional differences in construction cost of dormitory with general specifications. In this case, boarding fees of university dormitories should make no difference. This study analyzed boarding fees, depending on regional factors(Seoul, Gyeonggi-do, metropolitan cities and provinces), and depending on foundation subjects(national public university and private university), classes(four-year university and college) and principal schools-branch schools. The result of One-Way ANOVA showed that Seoul showed the highest average boarding fee and it was followed by Gyeonggi-do, metropolitan cities and provinces. Also, the average boarding fees of private universities and four-year universities were higher than national public universities and than colleges, respectively. In addition, branch school's boarding fee was higher than principal school's. Additionally, this study extracted a model using the hedonic model to see how various characteristics such as region, foundation subject and class influence the boarding fee. This study would serve as fundamental research on the boarding fee. Thus far, there have been difficulties in obtaining accurate data and analyzing boarding fees, since there is no open data about dormitories and it isn't mandatory to open it, but it is anticipated that this would be used as fundamental research for estimating and analyzing boarding fees of many universities in the future.

Field Application of the Flowing Concrete Method Considering Value Engineering(V.E) Concept (VE기법으로 유동화 공법 도입에 대한 현장 적용성 연구)

  • Shin, Hyun-Sup;Park, Yong-Kyu;Yoon, Jae-Ryung;Jeon, Chung-Keun;Han, Min-Cheol;Han, Cheon-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2006.11a
    • /
    • pp.21-24
    • /
    • 2006
  • This study investigates field application of flowing concrete in order to improve workability, duality and economic evaluation of concrete. Test results showed that slump of fresh concrete satisfied the target value before and after flowing concrete, and setting time indicated 3 hours difference depending on the mixture proportion of ready-mixed-concrete company. As for the hardened concrete, compressive strength of standard curing specimens, both control and flowing concrete, presented designed value at 28 days elapse. However, the specimens curing at atmosphere decreased the value, due to the lower curing temperature, but also performed the designed value at 91 days. For the evaluation of construction fee by value engineering(V.E) concept, a flowing method declined 4.89% of concrete construction fee, which is 4.9% reduction for materials and 25% reduction for labor expenses, compared with previous construction methods.

  • PDF

Improvement of CM Fee Estimation Criteria for Efficient CM Service (건설사업관리업무 효율화를 위한 대가 산출기준 개선방향)

  • Cho, Youngjun;Sung, Youngmo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.2
    • /
    • pp.105-112
    • /
    • 2019
  • As the Construction Technology Promotion Act was revised in 2015, the term of Supervision was removed and Construction Management was included instead. The consideration of Construction Management shall be based on the cost plus fee method specified in the Criteria for the Cost of Construction Technology Services of the Ministry of Land, Infrastructure and Transport. Nevertheless, it is based on the construction cost ratio in accordance with the Economy and Finance Ministry's Detailed Guidelines for Preparing the 2018 Budget Plan and Fund Management Plan (Manual for Business Type and Item). As a result, it has been expected that Construction Management consideration will be calculated according to a single government standard and that the Criteria will be applied reasonably. In addition, although the change in the Labor Standard Act has a significant effect on the working environment of the construction site, the nature of the construction site is not considered in this Act. Based on these problems, the study suggested that the government should apply a single standard after consultation with the relevant agencies when calculating the consideration for Construction management, that the scope of the Criteria for the Cost of Construction Technology Services should be clear, that the amount of input by the Construction Manager should be considered for the capability of engineers and the number of working days, and that construction characteristics should be considered when determining the number of working days and hours.

A Study on the Status and Future Development of Construction Management of Jeonju World Cup Stadium (전주월드컵경기장의 건설사업관리 추진현황과 발전방향에 관한 연구)

  • In Chi-Sung;Jung Soon-Gil;Kim Tae-Sam;Kim Geun-Woo;Do Sang-Yeek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.73-80
    • /
    • 2001
  • Generally, construction management is classified into two categories in the construction industry; CM for fee and CM at risk, most project is executed by the construction supervision including construction management in CM for fee field in Korea. The division of work scope is complicated among construction manager(CMr) and difficult to implement the construction management efficiently by CMr. in this case. Therefore, it is desired to apply the specialized Project Management Information System(PMIS) systematically include construction management procedure. We propose the future development of construction management on construction site based on the analyzed problem with PMIS and guideline and CM concept on construction site, composition of CM procedure through this Jeonju World Cup Stadium CM project.

  • PDF

Work process improvement for effective request of Denta PACS fee (효율적 치과 PACS 수가신청을 위한 업무 프로세스 개선)

  • Jung, Young-Tae
    • Korean Journal of Digital Imaging in Medicine
    • /
    • v.17 no.1
    • /
    • pp.1-7
    • /
    • 2015
  • Recently, dental PACS construction in dental hospital is fairly general. For this reason, inspection request works of dental PACS fee with Health Insurance Review & Assessment Service are more important for the financial stability in hospital and from now on status. But several departments in dental hospital, enforce a incoherent order system so inspection request situation is full of mistakes and omissions. As a result, financial stability in hospital rapidly change for the worse, as the case stands establishment of proper order system and match system is essential to resolve the issue. Consequently, we plan to establish the proposed idealized scheme.

  • PDF

An Analysis of the Conditions for Construction Supervision Fee (책임감리 용역 대가의 실태 분석 연구)

  • Choi, Sun-Hee;Choi, Hye-Mi;Lee, Jae-Young;Kim, Young
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.283-288
    • /
    • 2007
  • As constructions are changing variously from the size and efficiency, the role of supervision services tend to reach beyond mere monitoring or supervision to prevent fraudulence, but tend to extend toward a system that manages all the stages of the construction industry. There are growing demand to improve government operated corporation systems to secure high quality public facilities, and reviews on construction supervision system and supervision services roles, function, responsibility and obligations have been the topics among advanced researchers. However, the circumstance is that researches on the construction supervision service compensation and supervision services assignment criteria that serve as basis of such construction supervision system improvement are insufficient, and for practical development of construction supervision system, researches on construction supervision service compensation and supervision services assignment criteria will need to precede. Hence, this research purports to propose improvement directions of construction supervision system by deducing problems through condition survey on the construction supervision services ordered by public organizations.

  • PDF

Characteristics of the Duty of care of a Good Manager according to the Construction Manager's Task (건설사업관리자의 수행업무에 따른 선관주의의무 특성)

  • Chung, Young-Ho;Lee, Sang-Beom;Park, Hyun-Jung;Cho, Hyeong-Jin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.36-43
    • /
    • 2012
  • When the construction management method was introduced, there were arguments regarding the contractual responsibility of the construction manager. Accordingly, the provisions on damage compensation in the Construction Technology Management Act were revised in 2002, and the obligatory duty of care of a good manager is now required by the Framework Act on the Construction Industry. Even though the construction manager has a responsibility of a consultant in the CM-for-fee contract, however, the Korean construction environment does not clearly specify the consultant's scope of responsibility. In this study, the theory about the duty of care, which is a consultant's responsibility among the expert's responsibilities, was arranged. Based on the responsibilities of experts such as lawyers, the duties of care of a good manager of the construction manager were presented to provide the foundation for establishing the construction manager's responsibilities. To verify the resulting items, interviews with experts were performed to assess their importance levels.

A Basic Study of the Construction Supervision Integration (건설감리 통합화를 위한 기초 연구)

  • Hwang, Eun-Kyoung;Kim, Soo-Am
    • Proceeding of Spring/Autumn Annual Conference of KHA
    • /
    • 2006.11a
    • /
    • pp.223-226
    • /
    • 2006
  • Fields of domestic construction supervision are divided into architecture, electricity, information and communication and fire by the individual laws. Between each supervision are lack of relationship. So it bring about performance degradation, supervision fee increasing and dispute. The purpose of this basic research is to suggest the integration method of each supervision.

  • PDF

Issues and Perception on Management Fee and Rental Payment Overdue of Permanent Rental Housing Residents (영구임대주택 입주자의 관리비 및 임대료 체납 실태와 의식)

  • Kim,, Young-Joo;Kim, Young-Tae
    • Journal of the Korean housing association
    • /
    • v.18 no.5
    • /
    • pp.73-84
    • /
    • 2007
  • Permanent rental housing, the construction of which was strongly financed by the central government, is regarded as a social housing for those who fall within the lowest income bracket. Differing from "public rental housing", offered to tenants for sale after a five year rental period, this type of housing is intended for rental use on a long-tenn basis. At present, about 190,000 permanent rental housing units exist in Korea. According to a statistics, 15.6% of its residents did not pay their management fee and rental payment in 4 or more months in 2005, which places stress on the housing management. Based on the "eviction condition" stipulated in the tenancy agreement for permanent rental housing, a householder owning assets or a vehicle which is not used as his means of living, who is overdue with his management fee and rental payment for a long time, may be evicted from the house. However, there are many conflicts and problems between administrators/housing managers and residents in the process of enforcing this regulation. The purpose of this study is to explore the key issues associated with the present situation and the reasons why so many management fee and rental payment for permanent rental housing are overdue. For the purpose of research, data were collected from 10,990 permanent rental housing residents nationwide via a questionnaire survey in February 2007. One third of the respondents had an experience of more than 2 months overdue since they have moved in current residence. For further analysis, the respondents were divided into three groups, based on their working ability. The major finding showed that the group of respondents who have working ability required a more practical plan, such as employment, to have a sustainable life, while the other group of no labor force indicated a need for more housing allowance from the government. To suggest more specific alternatives for the subject of housing payment overdue, further comparison study should be performed between the residents of permanent rental housing and other low income tenants in private housing sector.

Policies and Tasks for Improving Korean CM Industry (CM 산업 발전을 위한 정책 및 과제 추진 방안)

  • Kang, Seunghee;Jung, Youngsoo;Kim, Namjoon;Shin, Dongwoo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.5
    • /
    • pp.71-81
    • /
    • 2014
  • As domestic construction investment has been gradually reduced, the issue of expanding overseas CM market has increased. Strengthening CM capability from the view point of project life-cycle is required in overseas CM market. However, current regulations institutionally force public CM services to focus on the construction phase. Therefore, Korean CM firms can hardly have the opportunities for accumulating technical competitiveness especially for pre-construction phase. Result of this study shows that the total efforts in terms of man-hours for the construction phase is found to be more than 78 percent in domestic public CM projects. In this context, this study proposes the policies and tasks for improving 'rigid man-hour placement', 'unreasonable CM fee standards', 'CM firm selection method', 'unreasonable business scope decision', and 'evaluation of owner's project management capability' in order to improve domestic CM Industry as well as to expand overseas CM market successfully.