• Title/Summary/Keyword: construction costs

Search Result 1,557, Processing Time 0.037 seconds

SEOUL TOLL PLAZA VALUE ENGINEERING STUDY CONSIDERING PERFORMANCE MEASUREMENT AND LIFE-CYCLE COSTS

  • Jong-Kwon Lim;Min-Jae Lee ;George Hunter;Sung-il Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.621-626
    • /
    • 2005
  • Recent increases in construction costs on Korean public works projects, largely due to change orders caused by poorly elaborated design, become a motivation of applying VE process in Korean construction industry. The Seoul Toll Plaza project, recently value analyzed by four VE teams, demonstrates how value management helps save time, money and increase functional performance. The objective of this project is to upgrade and expand existing pay and ticket booths system on "Kyungboo Express Highway", the main artery for the Korean peninsula linking Seoul to Pusan. The value management study generated several innovate alternatives capable of saving up to 50% of project cost from the baseline project plan.

  • PDF

Cost Analysis of Fall Accidents in Domestic Construction Industry (국내 건설산업의 추락재해 비용 분석)

  • Sa, Young Bae;Choi, Sung Uk;Cho, Won Cheol;Lee, Tae Shik
    • Journal of Korean Society of Disaster and Security
    • /
    • v.5 no.1
    • /
    • pp.1-6
    • /
    • 2012
  • This study analyzed the direct costs of fall accidents, which have the highest accident rate, for domestic construction industry workers. Firstly, the average insurance payment per person due to fall accidents in the construction industry is around 19 million won (18,971,000 won). Given that the average number of workers suffering fall accidents over ten years is 5,863, the total cost of losses from fall accidents is about 1.1 trillion won (111,360,000,000 won). Secondly, a cost-based economic feasibility analysis was done to develop nonstructural preventive measures for fall accidents. Since there was no data expressing the costs and effects of preventive measures in terms of monetary value, the economic feasibility analysis was attempted with a focus on how much the newly introduced preventive measures can reduce the accident loss costs due to fall accidents. Thirdly, if the accident loss size is grasped and the preventive measures for the causes of fall accidents are developed and strictly implemented, the insurance fee that can reduce the accident loss costs can be determined. Further study is needed to estimate the benefit of the accident loss cost reduction seen from the cost-based approach method.

A study for charateristics of vehicle Running costs in Korea (우리나라 차량운행비의 특징에 관하여(논문))

  • 김용회
    • Journal of the Korean Professional Engineers Association
    • /
    • v.9 no.3
    • /
    • pp.8-19
    • /
    • 1976
  • A set of study has been made on the table of vehicle running costs, officially used by Korean government, in view to clarifay the relative value of costs composition characteristic and reduction rate due to road surface improvement. The amount of vehicle running costs in Korea and of the components, has been compared, with the corresponding value of the USA, Japan, France, Great Britain and Italy. Findings are briefly summerized : vehicle running costs have been found to be generally much expensive in Korea than the four developed countries except Italy; and significant differences have been also found on the pattern of savings for components of vehicle running costs presumable by pavement construction on road surface, between two countries, Korea and the USA.

  • PDF

Optimization Method of Building Energy Performance and Construction Cost Using Kuhn-Tucker Conditions (쿤-터커 조건을 이용한 건물의 에너지성능과 비용 최적화방법)

  • Won, Jong-Seo;Koo, Jae-Oh
    • KIEAE Journal
    • /
    • v.3 no.2
    • /
    • pp.51-58
    • /
    • 2003
  • The purpose of this study is to present rational methods of multi-criteria optimization of the shape of energy saving buildings. The object is to determine the optimum dimension of the shape of a building, based on the following criteria: minimum building costs (including the cost of materials and construction) and yearly heating costs. Mathematical model described heat losses and gains in a building during the heating season. It takes into consideration heat losses through wall, roof, floor and windows. Particular attention was paid to have a more detailed description of heat gains due to solar radiation. On the assumption that shape of building is rectangle in order to solve the problem, the proportions of wall length and building height are determined by using non-linear programing methods(Kuhn-Tucker Conditions). The results constitute information for designers on the optimum proportions of wall lengths, height, and the ratios of window to wall areas for energy saving buildings.

Economic Analysis of Plant Utilities Under Environment Factor (환경요소를 고려한 발전설비의 경제성 평가)

  • 정석재;김경섭;박진원
    • Journal of the Korea Society for Simulation
    • /
    • v.13 no.2
    • /
    • pp.35-43
    • /
    • 2004
  • The purpose of this study is an economic analysis of power plant utilities by comparing electricity generating cost including environmental costs. Considering the enormous role of electricity in the national economy, it is very important to study the effect of environmental regulation on the electricity sector. Because power utilities need for large investment during construction, operation and maintenance, and also require much construction lead time. Economic analysis is the important process in the electric system expansion planning. This paper compares the costs of electricity generation including environmental costs between a coal-fired power plant and an LNG combined cycle power plants. With the simulation, this study surveys the sensitivity of fuel prices, interest rate and carbon tax. In each case, this sensitivity can help to decide which utility is economically better in environmental regulation circumstance.

  • PDF

A Study on the Calculation of ConstrucitIon Costs and Their Annual Equivalent Recovery at PECT and GCT (컨테이너부두의 건설원가 및 연간투자비 회수액 산정에 관한 연구)

  • 이태우;임종길
    • Proceedings of the Korean Institute of Navigation and Port Research Conference
    • /
    • 1999.10a
    • /
    • pp.11-18
    • /
    • 1999
  • Major factors that are considered to determine lease charges of container terminals are, among others, construction cost of berth, discount rate, financing cost, and size of annual equivalent recovery. This paper aims to calculate construction costs at PECT and GCT and their annual equivalent recovery on the basis of historical data, and to identify whether or not relationship of the above result and current lease charges at the two terminals are justifiable.

Improvement of the Design-Build Bidding in the Domestic Construction Industry (국내 설계시공일괄입찰방식 개선방안)

  • Kim Su-Hyun;Jeon Min-Jeong;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.410-413
    • /
    • 2003
  • In order to build up competitive power in construction market and to cope with international policy, Design-Build bidding is one of the viable bidding system, encouraging collaboration between design office and building construction firm. Design-Build is a promising delivery system to help expediting schedules, saving costs, and improving Quality. However, the problems of Design-Build project in the domestic construction industry are not to be able to take advantages of fast-tracking and value engineering process, because of the problems of inappropriate system and participants' inexperience. The purpose of this study is to suggest alternatives for Design-Build bidding of public sector in the domestic construction industry in the costs, quality and time aspect.

  • PDF

A Study on the Methodology of U-City Services Standardization (신도시 U-City 서비스 표준화 방법론에 관한 연구)

  • Lee, Sang Hun;Yang, Dong Suk
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.8 no.4
    • /
    • pp.53-62
    • /
    • 2012
  • U-City means the high-tech city that applied ubiquitous technology and information communication technology. U-City aims to intensify urban competitiveness and to improve the quality of residents' life through efficient management of the urban. Currently, 77 U-City projects is underway. The each project cost and scale estimate is not clear in the absence of the U-Service Standardization Model. So, many of the project are trouble about making a production the proper number of U-Service or the cost of project. The excessive service construction is reflected on the construction costs, which leads to the rise of sales price and passes onto the executor of a project as a burden of the project costs, and the problem of the delay of the change-over occurs due to supporting the operation costs for the operation of the constructed service and the demand for additional installation of facilities between a local autonomous entity and the executor of a project. In this paper, we suggested the U-Services Construction Standardization Methods and proposed the standardization services guideline of crime prevention services. U-City services in the future are able to maintain the consistency of the system through the utilization of the proposed standard model. As a result, the U-City project's pre-estimated cost and scale can be extracted.

A Basic Study of Dynamic Simulation Model for In-situ Production and Erection of Precast Concrete Members (PC의 현장생산-설치 통합관리를 위한 동적 시뮬레이션 모델 기초연구)

  • Son, Seung-Hyun;Kim, Ki-Ho;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.42-43
    • /
    • 2019
  • In-situ production of PC (precast concrete) members can reduce costs by about 14.5% -21.6% compared to in-plant production due to the reduction of transportation costs, factory profits and overhead costs. However, in-situ production of PC members presents a variety of risks, including member production and yard area securing, and lead time for production within the installation period. To solve this, it is necessary be able to analyze and control and monitor the risk factors that influence in-situ production for PC member. The purpose of this study is to develop a dynamic simulation model for in-situ production and erection integrated management for PC members. For this study, risk factor identification, causal loop diagram, and dynamic simulation model construction were performed sequentially. The results of this study will be used as a basis for developing a risk management model for PC in-situ production.

  • PDF

A Basic Study on the Development of Profit Risk Management Model for Apartment Projects (아파트 개발 프로젝트의 수익 리스크 관리모델에 관한 기초연구)

  • Son, Seunghyun;Lee, Sungho;Han, Bumjin;Na, Young-Ju;Kim, Ji-Myung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.11a
    • /
    • pp.215-216
    • /
    • 2022
  • Profit, the performance of an apartment development project, is directly affected by the sales ratio, unit sale price, financial costs, land costs and construction costs. However, these factors fluctuate in response to changes in the environment, including various stake holders, and the profits fluctuate as a result. In order to ensure that profits are managed within target levels, these factors must be able to be predicted, controlled and monitored and managed up to the start, sale, and end stages of the project. The purpose of this study is to develop a profit risk management model for apartment development projects. The results of this study will contribute to the establishment of academic basis for the dynamic management of project profits that fluctuate with time and environment. And in practice, it will help project developers manage their business revenue to the proper level. In addition, the risks that occur from time to time can be identified quantitatively and visually, and it is expected that it will be easier to derive consensus points for smooth business progress by reducing conflicts of interest among stakeholders.

  • PDF