• 제목/요약/키워드: construction cost comparison

검색결과 318건 처리시간 0.028초

유료노인주거시설에 대한 투자 의사결정을 위한 수요자 요구 분석 (Customers' Needs Analysis for Investment Decision Making in Residential Facility for Retired Seniors)

  • 진미연;최종수
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.53-61
    • /
    • 2008
  • It is expected that the market of residential facility for retired seniors will be a new investment field for construction firms. This study describes the questionnaire survey analysis results of potential customers' demand for the facility. For comparison purpose, direct construction cost was estimated by estimation experts. In addition, a case analysis was conducted to compare direct cost and indirect project cost with the experts' estimation. According to the questionnaire survey analysis, it is observed that there were significant differences in demand between groups which are classified by the regions, living expenditures, the level of property ownership and the scales of residence. From an investor's perspective, investment decision on residential facility for retired seniors should be made considering bothe the level of returns which can be generated from the investment and the customers' needs.

건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발 (Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field)

  • 이승학;손재호;이승현
    • 한국건축시공학회지
    • /
    • 제14권5호
    • /
    • pp.467-476
    • /
    • 2014
  • 최근 건설공사의 기계화로 인한 많은 장비 투입으로 인하여 주변 주민들이 현장 소음에 인한 피해보상을 요구하는 민원이 증가하고 있다. 하지만 현장소음은 예방차원이 아닌 공사 진행과정에서만 제한적으로 관리되며 민원이 발생하고 나서야 대부분의 대처가 이루어지고 있는 실정이다. 또한, 이러한 민원을 해결하기 위해서는 비용과 시간이 과다하게 소요되는데 이는 건설사에 부정적인 영향을 미치게 된다. 이에 본 연구는 착공 전부터 계획된 공사기간과 장비투입 조건을 활용하여 최적 공사비를 찾는 알고리즘을 제안하고 최적 공정표를 도출할 수 있는 스케줄링 프로세스 모델을 개발하는 데 그 목적이 있다. 또한, 이를 활용하여 현장관리자가 공사계획 수립 시 소음발생 여부에 따라 민원이 발생할 때 예측되는 비용정보 및 소음제한에 따른 공사비와 공사기간의 변화 정도를 비교 분석함으로써 보다 합리적이고 효율적인 공사 관리를 수행할 수 있도록 한다.

공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축 (Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework)

  • 윤원건;배병윤;강태경
    • 한국건설관리학회논문집
    • /
    • 제23권6호
    • /
    • pp.30-42
    • /
    • 2022
  • OSC는 기획, 설계, 시공, 유지보수 등의 건설생산 전 과정에 걸친 공급망과 가치사슬의 한 유형으로 건설현장이 아닌 공장 등 제 3의 장소에서 제작한 후 현장으로 운반하여 설치 및 시공하므로써 최종 목적물을 생산하는 방식이다. 본 연구에서는 PC공법 및 RC공법을 적용한 공동주택 사례를 각각 1개에 대하여 공사비를 비교하였다. PC공법 적용(PC설계비 제외)의 경우 RC공법만 적용하는 경우에 비해 골조 단위물량(m3)당 골조공사비가 약 70% 내외로 증가(RC 공종 합계 기준 50%)함을 도출하였다. PC공법 적용 사례 전체 골조 공사비 중 PC비중이 90.2%로 'PC제작비'가 54.8%, 'PC조립' 28.5%, '운반'이 6.89%를 차지하여, PC제작 및 조립 부문에서 비용 절감 노력이 필요할 것으로 판단하였다. 또한, 비용과 편익을 함께 고려할 수 있는 의사결정 프레임워크 초안을 구축하였다. 편익의 경우 OSC 기술적 장점이 반영된 공사기간, 하자보수, 재해발생, 에너지효율, 소음/분진/폐기물, 온실가스 배출 지표를 제시하였다. OSC기반 PC 공동주택 도입 의사결정을 지원하기 위한 적용 효과 근거를 마련하는데 기여할 수 있을 것으로 판단된다.

표준단면을 이용한 터널 공사비 예측모델 개발 (II) - 공사비 변동 모델 및 검증 - (A Standard Section-Based Approximate Cost Estimating Model on Tunnel (II) - Cost Variance Index Table and Test -)

  • 조정연;김상귀;김경민;김경주
    • 대한토목학회논문집
    • /
    • 제28권5D호
    • /
    • pp.677-684
    • /
    • 2008
  • 본 연구는 터널공사비 영향요인 분석 결과를 이용하여 터널 공사비 예측에 활용될 수 있는 모델을 제시하였다. 이를 위해 공사비 영향요인의 변화에 따른 공사비 변동 지수표를 구축하고, 이를 바탕으로 사업 환경의 변화에 따른 공사비 추정을 위한 절차를 제시하였다. 또한 최근 수행된 실제 프로젝트를 대상으로 제시된 터널 공사비 추정모델의 적정성을 검증하는 작업을 수행하였다. 표준단면 및 공사비 변동비를 바탕으로 한 공사비 예측에 있어 실제 프로젝트를 통한 검증결과 실제 설계 예정가격과 비교하여 -5% ~ +11%의 범위에서 추정되었다. 제시된 모델은 기획단계에서 사업의 기본적인 조건을 바탕으로 사업비를 추정하고, 설계 및 시공단계에서 설계 대안에 대한 경제성 평가, 설계조건, 지반조건, 시공환경의 변화, 공법, 자재, 장비의 변경에 따른 공사비의 영향을 효율적으로 평가하는데 활용될 수 있을 것으로 기대된다.

A Comparison of Construction Cost Estimation Using Multiple Regression Analysis and Neural Network in Elementary School Project

  • Cho, Hong-Gyu;Kim, Kyong-Gon;Kim, Jang-Young;Kim, Gwang-Hee
    • 한국건축시공학회지
    • /
    • 제13권1호
    • /
    • pp.66-74
    • /
    • 2013
  • In the early stages of a construction project, the most important thing is to predict construction costs in a rational way. For this reason, many studies have been performed on the estimation of construction costs for apartment housing and office buildings at early stage using artificial intelligence, statistics, and the like. In this study, cost data held by a provincial Office of Education on elementary schools constructed from 2004 to 2007 were used to compare the multiple regression model with an artificial neural network model. A total of 96 historical data were classified into 76 historical data for constructing models and 20 historical data for comparing the constructed regression model with the artificial neural network model. The results of an analysis of predicted construction costs were that the error rate of the artificial neural network model is lower than that of the multiple regression model.

개보수 대상 건물의 비용 측면에서의 효율성 평가에 관한 연구 - 바닥 마감재를 중심으로 - (A Study on the Evaluation of the Efficiency in the Costs of the Remodeling)

  • 김상용;정병우;강경인
    • 한국건축시공학회지
    • /
    • 제3권4호
    • /
    • pp.129-134
    • /
    • 2003
  • The purpose of this study is to evaluate efficiency by the Life Cycle Cost(LCC) analysis of floor covering materials for remodeling. This study has been performed as a case study. The LCC analysis is a technique which takes account into both initial-future costs and benefits of an investment over some period of time. LCC is important in commercial decision making because it provides improved assessment of the living-term cost effectiveness of construction projects as well as alternative economic methods that focus on initial costs. For LCC analysis and comparison, the present value technique is used. The results of this study are summarized as follows; (1) A LCC analysis model of floor covering materials is suggested through a case study (2) As a result of LCC case study, the type of sheet is analysed more economical than that of tile in floor covering materials.

장기계속계약공사의 공기연장 추가간접비 산정 개선방안 (Improvement of the Calculation Standard for Prolongation cost of Long-term Continuing Contracts Construction Project)

  • 정기창;이재섭
    • 한국건설관리학회논문집
    • /
    • 제18권2호
    • /
    • pp.30-37
    • /
    • 2017
  • 공기연장과 관련한 많은 연구에도 불구하고 국내 공공 공사의 공기연장 추가간접비 산정방법에 대한 구체적인 연구가 없어 쟁점이 심화되고 있다. 또한 명확한 산정기준이 마련되지 않아 산정방식이 여러 가지로 혼용되고 있으며 타당성을 갖는 산정방식에 대한 고찰을 담은 연구가 없는 실정이다. 특히 장기계속계약에서의 휴지기발생시 추가간접비와 관련된 연구는 전무하다. 본 연구는 공사기간 동안 발생하는 비용의 패턴을 고려하여 국내 공공 공사의 특성을 반영한 공기연장 간접비 산출 방식을 제시하기 위해 현행 공기연장 간접비 산정 기준을 고찰하고 실태를 조사한 후 실제 사용되는 산정방식을 모형사례에 적용하여 그 산출결과를 비교 고찰하였다. 그 결과를 통해 기존 산정방식에 대한 문제점을 고찰하였으며, 기존 산정방식의 문제점을 고찰하는 과정에서 장기계속계약공사의 휴지기로 인한 추가간접비 산정에 적합한 산정방식인 '공사중지기간 총 실비산정방법'을 제시하였다.

고속도로 노후 콘크리트 포장 보강의 경제성 분석 사례 연구 (Case Studies of the Life Cycle Cost Analysis for Rehabilitation of Deteriorated Expressway Concrete Pavements)

  • 서영찬;박지원;김찬우
    • 한국도로학회논문집
    • /
    • 제18권3호
    • /
    • pp.33-45
    • /
    • 2016
  • PURPOSES : Concrete pavement has been used in the construction of the Jungbu expressway in 1987. More than 60% of the pavement on the expressway is currently made of concrete, but most has been used far beyond their design life. Pavement life has been extended through routine maintenance or overlay. However, the structural capacity of the pavement has reached its limit, and extensive rehabilitation/reconstruction with long time traffic blocking should be considered. The three following issues on concrete rehabilitation/reconstruction will be discussed: (1) economic comparison of asphalt inlay and asphalt overlay, (2) economic comparison preventive overlay on a section which is currently good and routine overlay on the section which will be poor, and (3) economic analysis of early-strength concrete when it is used in concrete reconstruction. METHODS : First, various life cycle cost analysis tools were compared, and the proper tool for the extensive rehabilitation/reconstruction was selected. Second, a sensitivity analysis of the selected tool was performed to find the influential input variables, which should be carefully selected in the analysis. Third, three case studies, which can be issues in the rehabilitation/reconstruction of the expressway concrete pavement in Korea, were performed. RESULTS : Asphalt overlay without milling the deteriorated concrete showed 18~25% lower life cycle cost than the current asphalt inlay with milling. The good current preventive overlay on the section was economically justified within the scope of this study. The construction cost limit of the early strength concrete was suggested to be economical for 1, 3, and 7 days of construction alternative opening. CONCLUSIONS : CA4PRS was a viable tool for comparing various rehabilitation/reconstruction issue alternatives. Several concrete issues associated with the rehabilitation/reconstruction of the deteriorated concrete pavement were discussed as mentioned above.

SAL상수위 제어시스템의 경제성 분석에 관한 연구 (A Study on the economic analysis of the standing water level control system)

  • 홍종인;홍성욱;김상원;양진국
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2013년도 춘계 학술논문 발표대회
    • /
    • pp.281-283
    • /
    • 2013
  • In this paper, standing water level control system and a comparison of existing methods (anchor, PDD, DM) and economic analysis was conducted. 1) Cost PDD method (6%), DM system (4%), and the SAL standing water level control system (4%), except for the anchor system is similar to the construction of three methods based on the portion of the anchor system was analyzed that. 2) construction and maintenance costs compared with the sum of the partial was, anchor system (100%), PDD method (39%), DM system (37%), the SAL standing water level control system (21%), the SAL standing water level control system was identified as the lowest cost method of.

  • PDF