Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field

건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발

  • Lee, Seung-Hak (School of Architectural Engineering, Hongik University) ;
  • Son, Jea-Ho (School of Architectural Engineering, Hongik University) ;
  • Lee, Seung-Hyun (School of Architectural Engineering, Hongik University)
  • Received : 2014.06.17
  • Accepted : 2014.08.06
  • Published : 2014.10.20

Abstract

According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

최근 건설공사의 기계화로 인한 많은 장비 투입으로 인하여 주변 주민들이 현장 소음에 인한 피해보상을 요구하는 민원이 증가하고 있다. 하지만 현장소음은 예방차원이 아닌 공사 진행과정에서만 제한적으로 관리되며 민원이 발생하고 나서야 대부분의 대처가 이루어지고 있는 실정이다. 또한, 이러한 민원을 해결하기 위해서는 비용과 시간이 과다하게 소요되는데 이는 건설사에 부정적인 영향을 미치게 된다. 이에 본 연구는 착공 전부터 계획된 공사기간과 장비투입 조건을 활용하여 최적 공사비를 찾는 알고리즘을 제안하고 최적 공정표를 도출할 수 있는 스케줄링 프로세스 모델을 개발하는 데 그 목적이 있다. 또한, 이를 활용하여 현장관리자가 공사계획 수립 시 소음발생 여부에 따라 민원이 발생할 때 예측되는 비용정보 및 소음제한에 따른 공사비와 공사기간의 변화 정도를 비교 분석함으로써 보다 합리적이고 효율적인 공사 관리를 수행할 수 있도록 한다.

Keywords

References

  1. Song JY. Noise a Construction Sites and Vibration Management a Best Casebook. Sejong : Ministry of Environment (KR);2012 Mar. 4 p. Report No.: 11-1480000-001217-01
  2. Jung EJ, Kim JS. A Case Study of Dispute Mediations on Construction Noise and Vibration Damages for Environmental Dispute Mediation - Focused on the 1993-2004 Years. Proceeding of Korean Society for Environmental Engineers ; 2006 Oct No. - ; Gyeongju, Korea. Seoul (Korea) : Korean Society of Environmental Engineers ; 2006. p. 987-92.
  3. Roh S, Lee HS, Park MS, Ryu HG. Focused on High-rise Building Finishing Work : Scheduling Method by Using Genetic Algorithms to Solve time-cost Trade-off Problems. Journal of the Architectural Institute of Korea Structure & Construction. 2006 Jun;22(6):157-64.
  4. Park UY, An SH. A Study on Optimization Model of Time-cost Trade-off Analysis Using Praticle Swarm Optimization. Journal of the Korea Institute of Building Construction. 2006 Jun;8(6):91-8.
  5. Maeng JC. Development of Progress Management Decision Making Model Considering Time-cost Trade off. [Master's Thesis]. [Seoul (Korea)]: Korea University; 2011. 88 p.
  6. Hong SJ, Choi BD, Lee IS, Lee YJ, An SJ. Introduction to Management Science : A Modeling and Case Studies Approach with Spreadsheets. Seoul: Hankyungsa; 2012. 63 p.
  7. Kim JS. Noise and Vibration Control. 4th ed. Seoul: Sejinsa 2013. 31-49 p.
  8. Atilla D, David A, Gul P. Multi Resource Leveling in Line-of-balance Scheduling. Journal of Construction Engineering and Management. 2013 Sep;139(9):1108-16. https://doi.org/10.1061/(ASCE)CO.1943-7862.0000716
  9. Hegazy T, Kassab M. Resource Optimization Using Combined Simulation and Genetic Algorithms. Journal of Construction Engineering and management. 2003 Dec;129(6):698-705. https://doi.org/10.1061/(ASCE)0733-9364(2003)129:6(698)