• Title/Summary/Keyword: construction control

Search Result 5,209, Processing Time 0.036 seconds

Ecological Stability of the Shihwa Lake Evaluated by Zooplankton Distribution in the Lake Shihwa and Adjacent Coastal Area (시화호와 인근 해역의 동물플랑크톤 분포로 본 시화호의 생태적 안정성)

  • Park, Chul;Huh, Sung-Hoi
    • The Sea:JOURNAL OF THE KOREAN SOCIETY OF OCEANOGRAPHY
    • /
    • v.2 no.2
    • /
    • pp.87-91
    • /
    • 1997
  • Ecological stability of the Lake Shihwa, artificially made by the construction of the Shihwa Dike, was evaluated by the species composition and variation in biomass of zooplankton. Species composition and seasonal variation in biomass in the seaside stations were similar to those observed in nearby bays and coastal zone. However, those in the lake sites showed very different patterns. The brackish water copepod, Sinocaianus tenellus, held the first rank in every season (with more than 66% in spring, 98% in summer and fall, and 80% in winter). The species composition was very simple and the biomass (in terms of total individuals $m^{-3}$) varied markedly with season up to the order of $10^4$ magnitude. These results imply that the lake ecosystem made by the construction of Sihwa dike is in very unstable stage probably due to the input of industrial wastes as well as unpredictable variation in salt content caused by irregular control of the watergate of the dike and resultant irregular flow direction of the water through the gate.

  • PDF

A study of tunnelling equipment development in a model test (터널굴착 시뮬레이션을 위한 터널굴착장비의 개발에 대한 연구)

  • Kim, Sang-Hwan
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.5 no.2
    • /
    • pp.199-207
    • /
    • 2003
  • Tunnel modelling in the field of geotechnical engineering essentially requires models of tunnelling machines and the simulation of tunnelling processes to clarify the detailed behaviour of tunnel construction. Modern advanced mechatronics, including construction processes, machinining and control technologies, are making it possible to fabricate such models. These technologies, however, are essentially developed in a gravity field condition and are needed to examine in a 1g or cenrifuge field condition. This paper presents the simulation method for tunnelling processes and the design method for tunnelling machines with special reference to the problem of earth pressure acting on the lining of a shield tunnel. The paper then introduces and verifies the design method for tunnelling machines in the 1g field by means of checking the reproduceability of experiment data and their comparison with data in the field.

  • PDF

Document Management for Jordan Research and Training Reactor Project by ANSIM (원자력 통합안전경영시스템을 이용한 요르단연구로사업의 문서관리)

  • Park, Kook-Nam;Choi, Min-Ho;Kwon, Yongse
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.39 no.2
    • /
    • pp.113-118
    • /
    • 2016
  • Project management is a tool for smooth operation during a full cycle from the design to normal operation including the schedule, document, and budget management, and document management is an important work for big projects such as the JRTR (Jordan Research and Training Reactor). To manage the various large documents for a research reactor, a project management system was resolved, a project procedure manual was prepared, and a document control system was established. The ANSIM (Advanced Nuclear Safety Information Management) system consists of a document management folder, document container folder, project management folder, organization management folder, and EPC (Engineering, Procurement and Construction) document folder. First, the system composition is a computerized version of the Inter-office Correspondence (IOC), the Document Distribution for Agreement (DDA), Design Documents, and Project Manager Memorandum (PM Memo) works prepared for the research reactor design. Second, it reviews, distributes, and approves design documents in the system and approves those documents to register and supply them to the research reactor user. Third, it integrates the information of the document system-using organization and its members, as well as users' rights regarding the ANSIM document system. Throughout these functions, the ANSIM system has been contributing to the vitalization of united research. Not only did the ANSIM system realize a design document input, data load, and search system and manage KAERI's long-period experience and knowledge information properties using a management strategy, but in doing so, it also contributed to research activation and will actively help in the construction of other nuclear facilities and exports abroad.

A Model for Design of Tailored Working Environment Intervention Programmes for Small Enterprises

  • Hasle, Peter;Kvorning, Laura V.;Rasmussen, Charlotte D.N.;Smith, Louise H.;Flyvholm, Mari-Ann
    • Safety and Health at Work
    • /
    • v.3 no.3
    • /
    • pp.181-191
    • /
    • 2012
  • Objectives: Small enterprises have higher exposure to occupational hazards compared to larger enterprises and further, they have fewer resources to control the risks. In order to improve the working environment, development of efficient measures is therefore a major challenge for regulators and other stakeholders. The aim of this paper is to develop a systematic model for the design of tailored intervention programmes meeting the needs of small enterprises. Methods: An important challenge for the design process is the transfer of knowledge from one context to another. The concept of realist analysis can provide insight into mechanisms by which intervention knowledge can be transferred from one context to another. We use this theoretical approach to develop a design model. Results: The model consist of five steps: 1) Defining occupational health and safety challenges of the target group, 2) selecting methods to improve the working environment, 3) developing theories about mechanisms which motivate the target group, 4) analysing the specific context of the target group for small enterprise programmes including owner-management role, social relations, and the perception of the working environment, and 5) designing the intervention based on the preceding steps. We demonstrate how the design model can be applied in practice by the development of an intervention programme for small enterprises in the construction industry. Conclusion: The model provides a useful tool for a systematic design process. The model makes it transparent for both researchers and practitioners as to how existing knowledge can be used in the design of new intervention programmes.

Rock-support Interaction behavior for Ground Condition Based on Numerical Modelling (암반조건에 따른 암반-지보 반응거동의 수치해석적 연구)

  • 전양수;한공창;신중호
    • Proceedings of the Korean Society for Rock Mechanics Conference
    • /
    • 2000.09a
    • /
    • pp.155-161
    • /
    • 2000
  • It is very important to control the final load that acts on a support system, in tunnel engineering. A reliable analysis is needed to carry out technically reasonable design and safe construction. Also, a series of procedures of construction and the rock-support interaction behavior must be considered. Most existing studies have been performed as the limited analysis based on the simplified assumption. In this study, through the analysis of a circular tunnel using a 2-D finite differential code, the rook-support interaction behaviors in the variation of rock and stress conditions are analyzed and compared with the results from the closed form solutions. Consequently, more realistic rock-support interaction curves are obtained by including the effects of initial stresses and rock condition. These cures are very useful to predict the required support pressure in the initial design stage.

  • PDF

Rock-support Interaction behavior for Ground Condition based on Numerical Modelling (암반조건에 따른 암반-지보 반응거동의 수치해석적 연구)

  • 전양수;한공창;신중호
    • Tunnel and Underground Space
    • /
    • v.10 no.3
    • /
    • pp.403-409
    • /
    • 2000
  • It is very important to control the final load that acts on a support system, in tunnel engineering. A reliable analysis is needed to carry out technically reasonable design and safe construction. Also, a series of procedures of construction and the rock-support interaction behavior must be considered. Most existing studies have been performed as the limited analysis based on the simplified assumption. In this study, through the analysis of a circular tunnel using a 2-D finite differential code, the rock-support interaction behaviors in the variation of rock and stress conditions are analyzed and compared with the results from the closed form solutions. Consequently, more realistic rock-support interaction curves are obtained by including the effects of initial stresses and rock condition. These curves are very useful to predict the required support pressure in the initial design stage.

  • PDF

Re-Repair Method for Deterioration of Partial Depth Repair Section in Portland Cement Concrete Pavement (콘크리트 포장 부분단면보수 재파손 구간의 적정 보수 방안)

  • Lee, Yong Hyeon;Kim, Hyun Seok;Jung, Won Kyong;Oh, Han Jin;Kim, Hyung Bae
    • International Journal of Highway Engineering
    • /
    • v.19 no.5
    • /
    • pp.33-42
    • /
    • 2017
  • PURPOSES : The purpose of this study is to suggest the construction and quality control method for the re-repair of a deteriorated partial depth repair for sections of Portland cement concrete pavement. METHODS : An experimental construction was conducted to extend the repair width for removing an existing repair section. A removal method was used to ensure early performance for a deteriorated partial depth repair section. Bond strength and split tensile strength were measured at the near vertical interface layer between the existing pavement and repair material. The area was analyzed for various conditions such as the extended repair area and the removing method of the existing repair section. RESULTS : As a result of analysis of bond strength and split tensile strength, the bonding performance of a milling removed section was improved over a cutting and hand breaker removed section. The bond strength was analyzed to increase slightly as the extended repair width for removing the existing repair section increased. The split tensile strength did not show a clear relationship to an increased extended repair width of an existing removed repair section. CONCLUSIONS : The milling removal method should be applied in the removal of existing deteriorated partial depth repair sections. The extended repair width for a re-repair section should be wider than the existing partial depth repair with at least a 75-mm length and width for the bond strength and the split tensile strength.

Development and Application of Acute Bioassay Method on Solid Samples using Bioluminescence Producing Bacteria (박테리아 발광 특성을 이용한 고형시료 급성 독성법 연구 및 적용)

  • Ko, Kyung-Seok;Kong, In-Chul;Jung, Hong-Gyung;Ro, Yul
    • Journal of Soil and Groundwater Environment
    • /
    • v.12 no.6
    • /
    • pp.46-52
    • /
    • 2007
  • A toxicity method using bioluminescence producing bacteria, Escherichia coli DH5 RB1436, was developed and applied on solid environmental samples. In the assay, 1 g soil sample was mixed with 4 ml RB1436 strain. Sets amended with p-buffer were employed for control in soil test, showing approximately 108% of sets amended with combusted soils. Measurable differences were observed between relatively more polluted groups (HP) and less polluted groups (LP) of soil samples, showing average toxicity 43 and 26%, respectively, in direct soil toxicity test. $EC_{50}$'s for all soil groups appeared in the range of $1.8{\sim}4.6\;g$, but those of sediments from dam reservoir and refuses were below 0.22 g. This developed bioassay should prove useful as a screening test for toxicity in various types of environmental solid samples.

Performance of Innovative Prestressed Support Earth Retention System in Urban Excavation (도심지 굴착에 적용된 IPS 흙막이 구조물의 현장거동)

  • Kim Nak Kyung;Park Jong Sik;Jang Ho Joon;Han Man Yop;Kim Moon Young;Kim Sung Bo
    • Journal of the Korean Geotechnical Society
    • /
    • v.21 no.2
    • /
    • pp.27-36
    • /
    • 2005
  • The performance of innovative prestressed support (IPS) earth retention system applied in urban excavation was presented and investigated. The IPS wales provide a high flexural stiffness to resist the bending by lateral earth pressure, and the IPS wales transfer lateral earth pressure to Corner struts. The IPS wale provides a larger spacing of support, economical benefit, construction easiness, good performance, and safety control. In order to investigate applicability and stability of the IPS earth retention system, the IPS system was instrumented and was monitored during construction. The IPS system applied in urban excavation functioned successfully. The results of the field instrumentation were presented. The measured performances of the IPS earth retention system were investigated and discussed.

The Study of Field Survey for the Analysis of Occupational Accident Causes in Korean Construction Industry (건설산업재해 원인분석 조사연구)

  • 이영섭
    • Journal of the Korean Society of Safety
    • /
    • v.1 no.1
    • /
    • pp.51-59
    • /
    • 1986
  • This study was conducted to analyse the exact causes of occupational accidents in Korean construction industry and to contribute to the accident prevention programs. The results and conclusions of the field survey are as follows : 1) The accidents caused by hazardous conditions are 96 percent, and those by unsafe acts are 97.3 percent. The accidents caused simultaneously by two categories are nore than 96 percent. 2) The injured workers who were employed less than 3 months are 71.1 percent. Safety training for newly recruited workers should be required. 3) More than 40 percent of all accidents were occurred in the morning and more than 30 percent were in summer. Required caution should be paid for the time and season. 4) Fracture, cut/laceration/puncture and multiple injuries in the lower extremeties, upper entremeties and head as well as many kinds of injuries by the fall from elevation mainly occurred. Safety. shoes, safety gloves, safety helmets, safety glasses, face shields and safity belts should be used 5) As the sources of injuries, each of building/structure and materials is one third of all sources, and machinery is a quarter. 6) The use of hazardous methods/procedures, defects of agencies and inadequate guarding of builing/structure, materials' and machinery mainly caused the accident types, such as s truck by, struck against, fall from elevation, and fall on same level. Such a hazardous conditiion should not be used and be correctet 7) The unsafe acts, such as improper use of hands or body parts, the operation or working at unsafe speed and improper use of equipment mainly caused accidents. Safety training for the control of such a unsafe acts should be strengthened.

  • PDF