Application of Activity-Based Costing(ABC) for Modular Construction Quality Management (활동기준원가계산을 이용한 모듈러 건축 프로젝트의 품질관리방안)

  • Lee, Jeong-Hoon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.22 no.5
    • /
    • pp.485-496
    • /
    • 2022
  • Modular construction projects offer advantageous over conventional construction projects in the area of quality control through factory production. However, as clear standards and definitions for quality control activities have yet to be not established, it is difficult to judge the appropriateness of the scale of quality control costs, and it is also difficult to classify quality control activities by process stage. Therefore, in this study, a method for classifying quality management activities based on activity standards was presented, in addition to a method for classifying quality costs according to the PAF standards to check how effective the costs and activities are for quality control in the future. The findings of this study can be used to define the quality management activities for each stage of the modular construction project in the future, and to develop a database of evidence to determine the appropriateness of cost distribution accordingly.

Selection of management factors for material distribution management according to materail management indexes (자재물류관리를 위한 자재 속성별 자재관리 지표)

  • Ha, Young-Seo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.553-557
    • /
    • 2007
  • In general, material cost of a construction project is more than 30$^{\sim}$40% of total construction cost, thus on site material control is very important. The factthat buildings have recently become higher and bigger also increases the importance of on site material control. However, on site material control has not been considered as an important management issue. This study classifies building construction materials considering the material delivery characteristics such as ETO, ATO, MTO and MTS and the unique characteristics of each materials. Using the classification, this study examine the requirements for on site material control of each materials. Finally, this study suggests on site material control systems for each construction material.

  • PDF

Basic Design for Development of IMV for MCV (MCV용 IMV개발을 위한 기초설계)

  • Huh, Junyoung;Jung, Gyu Hong
    • Journal of Drive and Control
    • /
    • v.15 no.3
    • /
    • pp.49-56
    • /
    • 2018
  • Construction machinery is used to improve productivity in civil engineering work and construction work, and it is a lengthy operation, and consumes considerable fuel to cope with large loads. As a result, productivity and fuel consumption of the construction machine become the main deciding factors. In the hydraulic system of the excavator, the main control valve is the most critical position for control. The flow distribution for control performance is achieved by the metering orifice, that causes critical energy loss. To improve this, we propose a combination of a three port proportional pressure reducing valve and a poppet type flow control valve as an IMV to replace the existing spool type MCV. To validate the proposal, we analyze static characteristics by modeling mathematically, and analyze dynamic characteristics. Simulation using the AMESim software on the regeneration circuit of the boom cylinder up-down operation, verifies the energy-saving effect compared to the existing MCV when IMV is used.

An Elective Multi-Project Management for the Small and Medium-sized Construction Companies - Focused on the Planning and Scheduling - (중소건설업체의 다중현장관리를 위한 공사관리업무의 효율화 방안 - 공정관리업무를 중심으로 -)

  • Choi Kwang-Hee;Han Ju-Yeon;Kim Kyung-Rai;Shin Dong-Woo
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.504-510
    • /
    • 2002
  • As the Scale of construction work is enlarged, complicated and diversified, construction information from the large number of construction sites is happened at site and reported to the head office. To simultaneously control the individual or large number of sites in large number of construction information, the necessity of making extract the important point of the information and the board of director's making a suitable decision to support the fields is increased. Also, as driving the construction industry to be informative, efficiently aggregating the information created in fields, efficiently making decision and controlling the construction work is increased the importance of the company's competitiveness factor. To simultaneously control multi-construction sites in the small and medium size construction firms define the fundamental and core information factor which needed in the head office and suggest the appling method.

  • PDF

Analysis of Utilization Status and Limitations of Intelligent CCTV for Safety Management at Construction Sites (건설현장 안전관리를 위한 지능형 CCTV의 활용 현황 및 한계 분석)

  • Kim, Jae-Min;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.203-204
    • /
    • 2023
  • The construction industry is a hazardous environment in which many field workers work. Therefore, there is a limit to the safety manager's grasp of all situations. In order to solve these problems, the application of automatic control technology in connection with AI and CCTV is being introduced, and the development of intelligent CCTV to reduce the safety accident rate is actively progressing. This study seeks to present future directions by identifying the current status of intelligent CCTV developed to reduce the safety accident rate at construction sites and analyzing its limitations. Through this, the range of accident prevention types of the safety control system at the construction site will be confirmed and the need for future intelligent CCTV function development will be suggested.

  • PDF

The Program of progress control and quality control for the high-rise compound building (초고층 주상복합건물의 수장공사 공정관리 및 품질관리 방안)

  • Jung, Eul-Kyu;Lim, Chil-Soon
    • Journal of the Korea Institute of Building Construction
    • /
    • v.3 no.4
    • /
    • pp.111-117
    • /
    • 2003
  • Recently SAMWOO EMC received order and built interior walls which was used the day process in several high-rise compound buildings. On the way to build, this process was brought about several matter according to the progress and qualify control. So, this study is the improving way of the dry process from experiences on those constructions

Suggestion for Integrated Process Quality Control for Facility Management of Smart City at Construction Stage (Smart City 시공단계 시설물 통합품질관리 프로세스 제안)

  • Park, In-Woo;Kim, In-Han;Choi, Jung-Sik
    • Journal of the Korea Institute of Building Construction
    • /
    • v.16 no.6
    • /
    • pp.535-544
    • /
    • 2016
  • Korean government is promoting "K-Smart City" to overseas market which is an integrated solution of construction industry with ICT(Information and Communciations Technologies) industry. Due to nature of Smart City, construction quality and the development quality of the facilities need to be established to improve the overall quality. However, guidelines and regulations to initiate quality control for Smart City are behind the actual demand. This deficiency is bringing quality control for construction and ICT to be controlled separately causing lack of synergy and resulting in overall quality degradation. This research is designed to improve the construction quality of Smart City during its establishment stage by integrating ICT system with on-site construction (Integrated control center and on-site equipment). The adoption of this research to a real Smart City case had resulted in 22% reduction of construction inspection failure (Audit), and also allowed Construction Company to pre-align quality control of all purchased items of ICT Infra that resulted in 18% reduction of nonconformity, thus contributing to an overall quality improvement. This research is expected to be used widely among all construction industry of Smart City.

Introduction to CM Experience from Incheon International Airport (IIA) Construction Project (인천국제공항건설 사업관리 경험)

  • Park, Dae-Won
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.20-25
    • /
    • 2004
  • On July $18^{th}$, 2003, Incheon International Airport Corporation(lIAC) signed the Construction Management Service Contract with KIDS consortium (composed of Kun-Won Eng., ITM Corp, Do-Hwa Eng, Space Croup) for the $2^{nd}$ phase construction protect consists of landfill, $\#3$ runway, remote Concourse, IAT, BHS, cargo terminal, etc scheduled to be finished by the end of 2008. KIDS dispatched qualified engineers to the Construction Management Division of IIAC for providing technical assistance to IIAC members to pursue project goals in tulle. within budget with appropriate quality level to build one of leading hul] airports for the Northeast Asia legion in the $21^{st}$ century. The work scope covers upgrading various project procedures and related computer programs, cost and schedule control, design supervision for building design including support systerns such as HVAC, fire protection, elevators and escalators, boarding bridges, electrical and communication systems, and technical support for IAT/BHS, QA/QC, field test and inspection, start-up and commissioning, etc. The purpose of this paper is to introduce the major activities of the Construction Management Services performing at the IIA project for your reference.

  • PDF

Development of Construction Project Control System for Large Sized Construction by Process and Data Modeling (대형건설공사의 프로세스 및 데이터 모델링을 통한 건설프로젝트관리체계 구축에 관한 연구)

  • Choi Yoon-Ki;Lee Hyun-Soo;Hwang Young-Sam;Kim Young-Suk;Kim Woo-Young;Song Young-Woong
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.2 s.18
    • /
    • pp.153-161
    • /
    • 2004
  • The systematic material and labor management planning should be established on accomplished EVM data. The matrix method of integrated cost and schedule was used with common category concept according to the construction project control system. The construction project control system was suggested through analyzing process and data modeling based on integrated cost, schedule and material. Information of construction project can be developed the relationship between the field data and the integrated cost, schedule database. Process and data modelling is provide a standard data format which are related to the material, labor management based on integrated cost, schedule database.