• Title/Summary/Keyword: construction condition

Search Result 3,666, Processing Time 0.026 seconds

A Field Study on the Preference in the Construction Management - Focused after construction Stage - (현장관리 업무체계의 실태조사 연구 - 준공 후 업무를 중심으로 -)

  • 이두진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2003.05a
    • /
    • pp.85-89
    • /
    • 2003
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

A Field Study on the Preference in the Construction Management (공사관리업무에 대한 선호도 조사 연구)

  • 이두진;최민권;손재진
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2001.11a
    • /
    • pp.124-129
    • /
    • 2001
  • With the social demands for tall building, the level of techniques for construction become high and there are various building materials. Also, the construction system become very complicated with the increase of worker. In spite of above facts, the method of construction management depends on the experimental capacity of a construction manager, and there are many unreasonable elements. These elements prevent well-going in construction process. To solve this problem, it is necessary to make a new system of construction management which is adequate for the condition of company and the contents of construction. In this study, the characteristic of production system and the present condition of construction management were investigated with the help of survey. Thus, the new method of construction management which can clear the previous problems was proposed.

  • PDF

A Measurement Method of Facilities Condition around the Construction Sites using the Ubiquitous Sensor Network (USN 기술을 이용한 건설현장의 주변 시설물 안정 상태 계측 방안)

  • Kim, Kyong-Gon;Jeong, Mingu;Jeong, Gyeong-Hwan;Han, Byeong-Min;Shin, Yoonseok;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.158-159
    • /
    • 2013
  • The purpose of this research is to propose a method that measures facilities condition around the construction sites in real time. In a result, using the Ubiquitous Sensor Network (USN) technology, it was possible to monitor and share the data of facilities condition in real time. The proposed method can contribute to prevent and deal with danger promptly.

  • PDF

An Analysis on the Influence of Work Management Type on Work Condition (작업관리방식이 작업여건에 미치는 영향 분석 - 주단위작업관리방식과 일단위작업관리방식을 중심으로 -)

  • Yoon, Byong-Sik;Yu, Jung-Ho;Kim, Chang-Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.11 no.5
    • /
    • pp.75-83
    • /
    • 2010
  • Construction industries is a labor intensive industries. According to Korea Productivity Center, most OECD members indicate high labor productivity more than Korea labor productivity in construction industries. First of all, for increasing labor productivity work efficiency and work condition should be managed by administrator in work site. Especially, work condition could be controlled by the management behaviors of administrator in work site such as work management type. This indicates that work management type could influence strongly work condition. But although that work management type could influence work condition is the characteristic of construction work is recongized to many people, the quantitative analysis on the relationship between work condition and work management type is not enough. Therefore the purpose of this study is to analyze the Influence of Work Management Type on Work Condition.

A Study on the Algorithm for Framework Materials Calculation of the Reinforced Concrete (철근콘크리트조의 골조물량산출 알고리즘에 관한 연구)

  • Hong Chae-Gon;Kim Tae-Hui;Kim Sun-Kuk;Han Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-362
    • /
    • 2002
  • The construction industry from the research about materials calculate automation became accomplished plentifully. Material price calculate with application in the CAD plan is more quicker and accurate than with existing handy work. It gives a many effect in development of the research and estimation program against material calculate production automation with application of the CAD. But material calculate production uses an estimate program from generally a framework construction and the material calculate production work becomes accomplished. A thesis of the material calculate production methodology about a part of materials boundary condition from material calculate production work of framework construction is the actual condition which is insufficient. From the dissertation which it sees standardize the concrete, a concrete form a each part of materials calculate method from framework construction material calculate production. It standardize a part of materials agree with a condition of material calculate methodology which from a each part of materials boundary condition.

  • PDF

A Study on the Comparison and Analysis of Shotcrete Rebounds due to Acceleratiion (급결특성에 따른 숏크리트 리바운드의 비교분석 연구)

  • 신민호;김원일;전병승;임종성
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 1995.04a
    • /
    • pp.402-406
    • /
    • 1995
  • The purpose of this paper is to decrease shotcrete rebound losses and to produce economic effectiveness at the same time in construction. The mechanical properties and quick acceleration of various shoterete mixes were analyzed, which were intuenced by several accelerators and their amouts used. And the application and construction in the felds were evaluated. The shotcrete rebounds relied on the condition of construction rather than on the quality of materials, but it is found that the decreasing of the cost and time in shotcreting under the same condition was based on the rebounds which were affected by the accelerating capability of the accelerators. The application of the accelerator was limited by the condition of tunnel construction ; such as ground water, anti-corrosive, or anti-chemistry. It is important to choose a proper accelerator. Therefore, it is necessary that better accelerators which satisfly mechanical characteristics and economy are developed. Optimal working conditions should be announced to the workers and workers' skill be improved in the shotcrete construction feld as well.

  • PDF

A Study on Concrete Material Quality Management Based on Various Test of Construction Condition under Hot Weather Circumstance (서중(暑中) 환경에서 현장 콘크리트 시험을 통한 재료 품질관리 방안)

  • Park, Shin
    • Journal of the Korea Institute of Building Construction
    • /
    • v.5 no.3 s.17
    • /
    • pp.91-99
    • /
    • 2005
  • It is required to study systematical on the concrete quality management to extend structure life because rebuilding effect is reducing under present condition of large sized and high stories structure. Concrete, which shows its intensity by hydrating action and a big change in quality according to hot weather and temperature, produces a lot of qualify problem under hot and cold weather Because of each specification and construction plan which does not have basic standard on site, concrete's quality is irregular and makes some defect. As a result, Daegu is turned out to be the longest area after investigating application period and days focused on 8 cities weather information about relationship between hot weather circumstance and construction environment. Therefore, we first surveyed the concrete material in the region and found out the problem of quality nanagement. Then figure out the way of solution. Moreover, we integrated concrete material quality management, which is applied differently to each site, to have equal quality and to reduce defect from construction site. And then, based on various test of construction condition and analysis of quality management item, we suggest effective concrete quality management to make concrete material construction standard guide and plan under hot weather.

Application of Automated Measuring System for the Underground Construction in Urban Area (도심지 근접시공의 자동계측응용)

  • 남순성;정상용
    • Explosives and Blasting
    • /
    • v.15 no.2
    • /
    • pp.53-72
    • /
    • 1997
  • It is impossible to precat the behavior of ground soil and structure accurately during underground construction in urban area or excavation in soft ground area because of difference between the assumed design condition and the actual site condition. Therefore, it must be managed by measuring system and correct the difference by real data. Large scale under ground construction in urban area like a seoul subway project has needed for Intelligent Construction technique, a field of the Engineering Contractor. The automated measuring system is developed for the technique. It is described that the procedure and the method of measuring work with application of the automated measuring system.

  • PDF

Pile Moniotring for Offshore Jacket Structures ; Field Study (해상 자켓 구조물 파일 모니터링 현장 사례)

  • Kim, Dae-Hak;Lee, Kyu-Hwan;Park, Chan-Duck;Moon, Sang-Wook;Kim, Hak-Jung
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2006.03a
    • /
    • pp.1237-1244
    • /
    • 2006
  • This research discussed about method for basis construction of sea jacket construction. Several access ways of method for foundation construction of sea jacket construction are used. Accompany many efforts of design and build process to overcome the form of construction work and application equipment, special quality of construction and restriction and so on of sea environment in the case of pile foundation. Therefore, great many factor of sea condition, construction special quality, base condition, construction time, equipment composition, worker composition etc. shows other work form in spot at sea jacket construction process.

  • PDF

Case Study of Characteristic of Ground Deformation and Strut Axial Force Change in Long Span Deep Excavation(I) (장지간 깊은 굴착에서 지반변형 및 버팀보 축력변화 특성 사례연구(I))

  • Kim, Sung-Wook;Han, Byung-Won
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.03a
    • /
    • pp.308-319
    • /
    • 2009
  • In the case of relatively good ground and construction condition in the deep excavation for the construction of subway, railway, building etc., flexible earth retaining systems are often used in an economical point of view. It is generally known that the mechanism of behavior in the flexible earth retaining system is relatively more complicated than the rigid earth retaining system. Moreover in the case of long span strut supporting system the analysis of strut axial force change becomes more difficult when the differences of ground condition and excavation work progress on both sides of excavation section are added. When deeper excavation than the specification or installation delay of supporting system is done or change of ground condition is faced due to the construction conditions during construction process, lots of axial force can be induced in some struts and that can threaten the safety of construction. This paper introduces two examples of long span deep excavation where struts and rock bolts were used as a supporting system with flexible wall structure. And the sections of two examples are 50 meters apart in one construction site, they have almost similar design and construction conditions. The characteristics of ground deformation and strut axial force change were analysed, the similarity and difference between measurement results of tow examples were compared and investigated. The effort of this article aims to improve and develop the technique of design and construction in the coming projects having similar ground condition and supporting method.

  • PDF