• Title/Summary/Keyword: building work

Search Result 2,687, Processing Time 0.03 seconds

The Study on Integrated ACS and Lift Car System for Early Beginning of Windows Work in Tall Building Construction (초고층 창호공사 조기착공을 위한 ACS-Lift Car 연계 시스템 기초연구)

  • Lee, Dongyoon;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.72-73
    • /
    • 2014
  • Recently the concurrent construction method of framework and windows work has been applied for early beginning of exterior finishing works in tall building construction. However, the conventional method makes difficulties in auto-climbing of gang-form and climbing work of lift car since the removal of ACS(auto climbing system) should be preceded for operation of lift car up to the top floor. This study propose a concept model of integrated ACS and lift car system to resolve these problems and begin windows works early in tall building construction.

  • PDF

Sick Building Syndrome and the Related Factors in Office Workers (일부 대형빌딩 근무자에서 sick building syndrome의 위험요인에 관한 연구)

  • Baik, Jae-Joong;Cho, Soo-Hun;Park, Byung-Joo;Kang, Dae-Hee
    • Journal of Preventive Medicine and Public Health
    • /
    • v.30 no.1 s.56
    • /
    • pp.157-170
    • /
    • 1997
  • A cross-sectional study was conducted to investigate the prevalence and risk factors for symptoms associated with sick building syndrome in four office buildings located in Seoul. Information on personal factors, job-related factors, and medical history were collected using self-administered questionnaires modified from the National Institute for Occupational Safety and Health Indoor Air Quality questionnaire in 321 office workers in these buildings. The prevalence of general and irritant symptom groups was higher than the prevalence of dermatologic and respiratory symptom groups. Daily total work time, work time in the office, and work time with video display terminals (VDT) were identified as the risk factors for symptom groups associated with sick building syndrome by multiple linear logistic regression analysis. In conclusion, these results indicated that the symptom prevalence in this study is similar with the results reported from previous studies conducted in other countries and work time and work with VDT are related to sick building syndrome in Korea.

  • PDF

Necessity of Improvements on Code of Practice at the Demolition Work considering Building Structure Type : Based on Demolition work of Permission and Registration (건축물의 구조유형을 고려한 해체공사 제도 개선 방안 필요성 - 해체공사의 허가 및 신고를 기준으로 -)

  • Shim, Yukyung;Jeong, Jaewook;Lee, Jaehyun;Jeong, Jaemin
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.66-74
    • /
    • 2020
  • To prevent incident of demolition work the Building Management Act was implemented to manage demolition work. According to this law, buildings with the scale upper than 500㎡ of floor area are classified as permission to conduct the demolition work, however it may be hard to perform safety management at demolition work. In addition, the risk level of demolition work is varied with related to the structure type. So, the purpose of this study is to suggest the improvements of criteria on demolition work considering building structure types including small-scale structures such as masonry, wooden, and other structure. The research process was conducted by three steps. (I) Application of Building Management Act; (II) Analysis of demolition work by structure types; and (III) Subdivision of permission targets by building structure types. The result of this study, permission ratio was only 10% for total demolition work and 2.43% for masonry. Because the masonry, wooden, and other structure types are concentrated on a floor area of small-scale, the separate criteria of demolition work is need to prevent the accident and fatal incident. Through the results, the decision maker can be utilized (1) For the special building structure types, the criteria of enhanced safety management are applied by referring to the overseas law ; and (2) The demolition work can be considered by the criteria of separate permission in terms of structure types.

A Study on the Actual Condition Survey of Apartment Rebar Work (공동주택 철근공사의 실태조사에 관한 연구)

  • Lee, Taick-Oun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.8 no.2
    • /
    • pp.71-79
    • /
    • 2008
  • The rebar work is very related to the safety and durability of the building. Recently, the rebar work is produced some serious problems due to the lack of skillful crafts-man and the rising cost of rebar materials. Many papers have dealt with the rebar work of the manufacturing system in plants with a view to improvement those problems. But, the research on the rebar work of the manufacturing system in field is in a insignificant condition. This study presents the following improvement schemes as a result. First, the education strengthening for evaluation on practical affairs, second, the reinforcement of drawing & management in shop drawing and finally the simplification of apartment rebar work in slab. Also, this paper aims at advancing apartment rebar work by the actual condition survey in slab work. The further research will be needed about the whole structure parts such as foundation, wall, girder and rebar truss-deck plate as one of the improvement methods.

HAZARD EVALUATION OF WORK TYPES FOR BUILDING CONSTRUCTION

  • Seong-Seok Go;Hyuk Song;Han-Min Lee;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.786-790
    • /
    • 2005
  • As the scale of building construction is larger and more complex and the adaptation of new technology is increasing, the tendency of the risk serious accident cases is increasing now. Especially, the accident rate is below 10% at the building construction workers in Korea but among the total industrial accidents it exceeded by 35%. To prevent a construction accident, it is essential that not only to have a through grasp of the characteristic of safety problem but also to establish of efficient safety counter plan are required. According to the type and situation of building construction, the acquirement of necessary information is useful to prevent the hazard of work and establish the counter plan. Among the safety information it is a thing of especial importance that to estimate the hazard of work types for building construction to prepare the counter plan of safety. This study will analyze all of the1600 accidents of the building construction works from the data of KOSHA(Korea Occupational Safety &Health Agency) which were collected during 11 years(1992~2002) data relating to serious accidents of the building construction works, and suggest the counter plan according to the each work type in building construction works.

  • PDF

Characteristics of Particle Size Distributions Generated in the Vicinity of Building Blasting Demolition Sites (발파해체현장에서 발생하는 순간분진의 입경분포 특성)

  • Lee, Kyoung-Hee;Kim, Hyo-Jin;Park, Chan-Gyu;Ko, Kwang-Baik
    • Journal of Environmental Science International
    • /
    • v.18 no.1
    • /
    • pp.41-47
    • /
    • 2009
  • In building demolition work, major dust-generating activities are blasting concrete and rock. The aim of this study was to find the characteristic of particle size of dusts which were generated during building demolition work using explosion. The DustMate of the Turnkey-Instruments Ltd. was used for particulate size-selective sampling of the four sites. TSP(Total Suspended Particle), PM10(Particle Matter $10{\mu}m$), PM2.5(Particle Matter $2.5{\mu}m$), and PM1.0(Particle Matter $1.0{\mu}m$) were measured during building demolition work using explosion. The large particulate (higher than the diameter $10{\mu}m$) showed to be higher than 50%. The particulate ranged from $10{\mu}m\;to\;2.5{\mu}m$ showed about 30-40%. PM2.5 was not scarcely detected in the samples collected for building demolition work using explosion. We conclude that the dust generated during building demolition work using explosion has not most respirable particulate.

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

Critical Management Factors of Fluid-Applied Membrane Waterproofing Work for building basements (지하층 도막방수공사의 중점관리요인)

  • Kwon, Hae-Rim;Yu, Jung-Ho
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.6
    • /
    • pp.91-98
    • /
    • 2009
  • One role of waterproofing work is to block external moisture and water. Defects in waterproofing work in building construction brings on huge repair costs for related construction work as well as for the waterproofing layer itself. However, we don't have a quantitative probabilistic management method for waterproofing work to successfully anticipate and prevent defects. From an analysis of the literature and prior research, defects in the waterproofing work in the underground parts of buildings occur frequently. We selected Fluid-Applied Membrane waterproofing work as representing waterproofing work in the underground parts of a building, and researched the general types and causes of defects. In this study, we developed the Relative-FMEA (Failure Mode and Effect Analysis) approach that merges the Matrix method and FMEA. From a survey of experts, we deduced the most important management factors for Fluid-Applied Membrane waterproofing work for the underground parts of buildings.

A Study on the Secure method of Construction Workspace by using Building Information Modeling (BIM을 활용한 작업공간 확보 방안에 관한 연구)

  • Song, Dong-Hyeon;Lee, Sang-Beom;Song, Ho-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.9-10
    • /
    • 2011
  • Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.

  • PDF

Requirement Analysis for Development of SMART Beam Form (SMART 보 거푸집 개발을 위한 요구조건 분석)

  • Kim, Taekoo;Lim, Chaeyeon;Kim, Sunkuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.70-71
    • /
    • 2014
  • The structural work is the main process of building construction which influence on the time, cost, safety and quality. The form work is one of the main process which has from 20 to 30 percentage of structural work. Especially the form work for beams is complex and need more manpower compared with form work for column or slab. When the existing forms such as plywood form, steel framed wooden form and aluminum form, is used for form work of beam, it would result in the cost overrun caused by needs of lots of manpower and resources. Therefore, the aim of this study is analysis of the requirement for development of SMART beam form. The result of this study shall be used for the development of SMART form work system.

  • PDF