Seo, Jong-Hae;Lee, Jung-Ho;Lee, Kyu-sik;Jeon, Byong-kap;Kim, Jun-Sam;Lee, Hoi-Keun
Proceedings of the Korean Institute of Building Construction Conference
/
2012.05a
/
pp.197-200
/
2012
Concrete has cracks from shrinkage that necessarily result from in hardening process. Shrinkage-reduced concrete developed for crack reduction was utilized at a sample construction project. As a result, it is confirmed that crack initation ratio was remarkably reduced when compared to the case of normal concrete utilization. Additional sample project is supposed to use delay joints as well as srinkage-reduced concrete. Subsequently, the result will be reported. The greatest factor which affects in drying shrinkage is unit quantity of water. However, there are a lot off difficulties in field supervision because proper measuring means is not presented in present standard. Therfore, problems depending on ready-mixed concrete concrete companies should be improved by preparing the related standard assoon as possible.
The Chicago Convention in 1944 made important contributions to aviation safety improvement, building an aviation safety monitoring system for its signatory countries. As ICAO is now on the verge of changing its supervision system from self-reporting to preventive Continuous Monitoring Approach(CMA) in 2013, we also expect our own safety system to make a progress accordingly. The government is pushing ahead with plans to build an integrated safety management system at government level that satisfies international standards and reflects domestic features. To this end, this report proposes the most effective system-building model, by analyzing the current status of the system that is in use and meets the requirements of international aviation agencies.
Proceedings of the Korean Institute of Building Construction Conference
/
2009.05b
/
pp.9-13
/
2009
As recent construction projects are bigger and higher, the importance of lifting is increasing. In construction sites tower cranes are an essential lifting equipment covering were than 50% of all construction activities. But due to neglect of safety supervision, tower crane-related accidents are frequently taking place. Since most of construction activities is done in heights, the accidents are more likely to be catastrophic. According to an analysis of the causes of tower crane-related accidents, 49% of all accidents claimed for certain periods($1999{\sim}2003$) occurred in the process of telescoping work. Therefore, this research is conducted with the object of analyzing telescoping work of tower cranes and presenting solutions against safety risk. It is expected that the results of this study can be used as useful basic data or material when preparing for effective safety management for tower cranes.
Proceedings of the Korean Institute of Building Construction Conference
/
2022.04a
/
pp.127-128
/
2022
The construction industry has a higher disaster rate than other industries, so safety education and management are highly important. In order to reduce the construction accident rate, it is necessary to study the key safety management factors reflecting the characteristics of the construction industry, where there are differences in processes and manpower input for each process, and a small number of managers. Therefore, in this study, key safety management factors for each Process of construction were derived through cross-analysis between safety accident types and accident occurrence objects through disaster case data. The extracted key safety management factors are expected to provide useful information for safety education and supervision of construction sites.
Kim, Su-Na;Kim, Young-Jin;Lee, Woong-Jong;Roh, Young-Sook
Proceedings of the Korean Institute of Building Construction Conference
/
2023.05a
/
pp.375-376
/
2023
In this study, the legal and institutional status of construction supervising and construction inspector was identified. As a result of examining the definitions of construction supervision terms, focusing on domestic construction-related laws, it was found that there were no consistency between each laws regarding 'terminology' and 'definitions'. In addition, the scope of construction inspector's work continues to expand through the delegation provisions to lower statutes, however, responsibility, authority, and inspection cost are not taken into account properly. In addition in order to introduce digital technology to the smart construction site, which is currently active under way, it is judged that the law and institutional contents need to be improved further.
There are the relevant provisions that apply to building regulations about the Building codes, Fire Protection laws, and more Multi-using interior finish materials businesses etc. The differences between these regulations are as follows: The Building codes is defined the main use of the building according to facilities to used to set the scale by the use of the floor space, On the other hand, Fire Protection laws are the basic purpose and the act of using the architectural space(or sales) by separating object by fire. And Multiple-using Businesses Facilities consist of two regulations engaged in the kind of law and the size of the floor area. One building can not be based on operating facilities and together in Multiple use businesses Law. As such, the Buildings are applied to the Building codes, Fire Protection laws, such as Multi-using Businesses Facilities interior construction industry due to the structural differences in the position of the designer feeling a lot of difficulties and confusion. The Multi-use businesses Facilities engage in the kind of law, the size of the floor area and seating capacity. These can not be based on operating facilities, and consists of two regulations together in one building. This study is purposed to help improving the finish of the interior architecture that is related to the Building code regulations, Fire Protection laws, Multi-using Facilities interior finishing material relevant with the provisions from the law through analyze the case of developed countries, and the current Multiple use Businesses Facilities research range from the law of multiple-using facilities, interior finishing, interior architecture for supervision reasonably and compensation for the interior design. So, Result is as follows: First, interior decorations can be separated the fixed material and the moveable things. second, It should be included multi-using Business though small size business space at the basement floor. third, It should be established statute law that design and construction responsibility. forth, re-testing fire resist performance after some period. and finally, it need to mitigate regulation where be installed sprinkler.
The Journal of the Convergence on Culture Technology
/
v.5
no.3
/
pp.43-54
/
2019
In this study, results of completion inspection are investigated according to the performance of the firefighting construction supervision personnel and according to the necessity of clean air supply in a performance test of the firefighting construction supervision personnel. The results of the completion inspection are measured and the causes of defects in the fire protection facilities after issuance of a completion inspection certificate are analyzed. The findings of this investigation can be used to minimize the risk of apartment fires and improve the performance of firefighting construction supervision personnel. The results of this study are summarized as follows. First, the results of the completion inspection conducted by the firefighting construction supervision personnel varies according to particular occupation. The performance of fire facility supervisors from design companies and fire construction companies were significantly higher than the fire officers. Therefore, it is necessary to employ supervisors who have experience in supervising the construction of apartments, in order to improve the performance of fire construction supervision officers. Second, the analysis of the completion inspection results according to the necessity of a clean air supply for performance tests of firefighting construction supervision personnel showed that the necessity of a clean air supply was significantly higher for fire facility supervisors from design companies and fire construction companies than for the fire officers. In order to improve, the completion inspection should be carried out up until the completion date of the building. In addition, a system needs to be established to ensure that clients are not able to demand that a completion inspection certificate be issued on the construction completion date. Finally, it is found that defects of completion inspection after issuance of a completion inspection certificate affects the result of the completion inspection. The results of the completion inspections conducted by the fire facility supervisors from design companies and fire construction companies were affected significantly less by defects than that of the general contractors. Research shows that faults have occured in firefighting facilities after the issuance of a completion inspection certificate due to the client and the construction company demanding the issuance of the completion inspection certificate.
Journal of The Korea Institute of Healthcare Architecture
/
v.27
no.2
/
pp.7-14
/
2021
Purpose: The purpose of this study is to provide an effective construction project cost estimation tool for preparing a business plan of healthcare facilities which can be practically used for development projects. Methods: In order to provide a tool for calculating construction project costs, this study analyzed the Building and Related Laws, the Building Technology Promotion Laws, the Ministry of Land, Infrastructure and Transport notifications and directives, the Ministry of Trade, Industry and Energy notifications, the detailed guidelines of the Ministry of Strategy and Finance, the Building Service Industry Promotion Acts, various certification standards, actual project budget calculation cases, etc. with advices from related experts. Results: 1) Construction cost is classified into construction costs, architectural design costs, supervision costs, incidental costs, and each sub-element. In particular, since there are many incidental cost items, essential items to be reviewed during planning are derived and costs are calculated according to appropriate consideration criteria. 2) Criteria for Payment calculation mainly applies the construction cost rate method or the actual cost fixed amount method in consideration of the characteristics and scope of work. Implications: There are many calculation factors that need to be applied to the construction project cost. Therefore, it is necessary to organize the calculation process more clearly.
Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.
Journal of the Korea Institute of Building Construction
/
v.5
no.2
s.16
/
pp.115-121
/
2005
The building below standard scales to be built only by constructive report to authorities. Construction law 8 illustrates that supervision should be deployed in all the construction sites at the building which is found to have more than 3 floors and also to have more than loom of total squares in especially outside area of city plan zone. Such a small construction is have a important and the most basic meaning. Many problems were found to occur in all the constructive places which were out of the limit of this law. The construction sites were found to be controlled by public official's visiting without supervisors and designers of architecture. Technique of construction in architecture was found to be not different from that of 1980. The security of employees in construction on sites has a serious problem. Because of choosing ail the materials of the building without a reasonable point. All the building were found to have a law material about inside and outside aspects. The purpose of this study are to examine existing law about a small project and than to analyze the situation of constructive control through questionnaires and interviews with all the supervisors. Based on the data base of engineers who had a great experience in construction sites, The purpose of this study is also to suggest and advise the method of controlling all the items in architecture through on and off line.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.