Development of Simulation Model for Optimization of Modular Construction Transportation Plan (모듈러 건설의 운송계획 최적화를 위한 시뮬레이션 모델 개발)

  • Kim, Hyeonmin;Kwon, Woobin;Ahn, Heejae;Cho, HunHee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.200-201
    • /
    • 2022
  • Off-Site Construction is being widely adopted as an alternative to solve endemic problems in construction industry such as low productivity and efficiency. However, it is strongly recommended to examine the transportation process to be optimized because it determines the size of a modular and influences the cost of the construction. Therefore, in this study simulation model for optimization of modular construction transportation plan was developed using AnyLogic. As a result of the study, the influence of trailer transport capacity and transport time increases as the number of modular which should be transported from factory to site increases.

  • PDF

In-situ Production Effect Analysis of Precast Concrete Elements (PC 부재의 현장 생산효과 분석)

  • Lee, Dong-Joo;Oh, Jin-Hyuck;Kim, Sun-Kuk
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.52-53
    • /
    • 2021
  • PC (Precast Concrete) method was preferred for reasons such as shortening of construction period, cost reduction, and quality. However, in the case of factory production, precast concrete has a problem in that transportation conditions in the transportation process, damage during transportation, overhead and profit of the factory are required. If work and PC members are produced on site, transportation and installation costs can be reduced. However, research on field production has not been conducted. Therefore, based on the on-site production plan without PC, the cost and quality of factory production and on-site production are compared and analyzed.

  • PDF

Development of Image-Based Artificial Intelligence Model to Automate Material Management at Construction Site (공사현장 자재관리 자동화를 위한 영상기반 인공지능 모델개발)

  • Shin, Yoon-soo;Kim, Junhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.221-222
    • /
    • 2021
  • Conventionally, in material management at a construction site, the type, size, and quantity of materials are identified by the eyes of the worker. Labor-intensive material management by manpower is slow, requires a lot of manpower, is prone to errors, and has limitations in that computerization of information on the identified types and quantities is additionally required. Therefore, a method that can quickly and accurately determine the type, size, and quantity of materials with a minimum number of workers is required to reduce labor costs at the construction site and improve work efficiency. In this study, we developed an automated convolution neural network(CNN) and computer vision technology-based rebar size and quantity estimation system that can quickly and accurately determine the type, size, and quantity of materials through images.

  • PDF

The Collected data-based Air Pollutant Emission Prediction for construction equipment in Construction Sites (건설장비의 배출가스 데이터 기반 대기오염물질 배출량 예측 시스템)

  • Noh, Jaeyun;Kim, Yujin;Kim, Sumin;Han, Seungwoo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.11a
    • /
    • pp.86-87
    • /
    • 2021
  • As non-road mobile pollutants such as construction equipment are emerging as the main cause of air pollutants emission, construction equipment regulations are gradually strengthening. Research was conducted by correcting the emission coefficient to calculate and predict air pollutant emissions of construction equipment, but it did not reflect site variables such as field and equipment conditions that affect actual emissions. This study derived an Artificial Neural Network emission prediction model based on the actual emission data of excavators and trucks measured at the site and proposed a platform to predict the emission of air pollutants at the site according to the working size and conditions. Through this, it is possible to establish an eco-friendly process plan using a model from the construction plan.

  • PDF

A Study on the Field Application of particulate matter Measurement Instruments in Light Scattering Method (광산란법 미세먼지 계측기의 현장 적용성 평가에 관한 연구 )

  • Liu, Bao-lin;Lee, Chung-Won;Lim, Hyo-Jin;Tae, Sung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.11a
    • /
    • pp.201-202
    • /
    • 2023
  • Now, there are many cases where materials are maintained at construction sites or standard construction prices are not in accordance with the applicable regulations, resulting in a lot of fine dust. Therefore, a particulate matter measurement system is applied not only to manage particulate matter at construction sites but also to reduce particulate matter .This study aims to evaluate the applicability of this particulate matter measurement system to the construction site through long-term measurement experiments using a light scattering method particulate matter measurement instrument at the construction site.

  • PDF

Evaluating Spatiality of Green-House Gas Emission in Building Site ("대" 지목에 의거한 온실가스 분포의 공간성 평가)

  • Kim, Jun-Hyun;Um, Jung-Sup
    • Proceedings of the Korean Association of Geographic Inforamtion Studies Conference
    • /
    • 2010.06a
    • /
    • pp.94-102
    • /
    • 2010
  • These days the land category is the most specific basis of legal for land use or land use form that is determined by the main use of land. Even if same land building site, it is used very various like a detached house, a row house, a multiplex house, a villa, an apartment, a mixed-use Apartments, commercial building, fallow land etc. There is a need of variety analysis in order to apply greenhouse gas emission or statistics assessment for standard of classification. Therefore, This study measured carbon dioxide by for different government agencies of maps by land use time, season, elevation, space, area of floating population. As a result, The emission characteristic was high l.78 times, on average of l.35 times in winter compared with summer, when the temperatures increased 11C, the carbon dioxide is 22ppm high in the afternoon, A commercial building is high 4.04 times compare with detached house.

  • PDF

A Fundamental Test of Temperature Crack Reduction Method Application by Setting Time Control of Large-Scaled Mat Foundation Mass Concrete (초대형 매트기초 매스 콘크리트의 응결시간조정에 의한 온도균열저감 공법적용의 기초적 실험)

  • Han, Cheon-Goo;Lee, Jae-Sam;Noh, Sang-Kyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.9 no.3
    • /
    • pp.95-101
    • /
    • 2009
  • Constructing large-scale mat foundation mass concrete is increasing for the stability of building structure, because a lot of high rise building are being built in order to make full use of limited space. However, It is of increasing concerns that because limited placing equipments, available job-site and systems for mass concete placement in construction field do not allow to place great quantity of concrete at the same time in large scale mat foundation, consistency between placement lift can not be secured. And also, it is likely to crack due to stress caused by the difference of hydration heat generation time. To find out the solution against above problems, this study is to reconfirm the performance of normal concrete designed by mix proportion and super retarding concrete. The Fundamental test shows what happens if low heat proportioning and control method of setting time are applied at the job-site of newly constructed high rise building. The test result show that slump flow of concrete has been somewhat increased as the target retarding time gets longer, while the air content has been slightly decreased but this is no great difference from normal concrete. The setting time shows to be retarded as target retarding time gets longer, the range of retarding time increases. It is necessary to increase the amount of mix of super retarding agent in the proportion ration by setting curing temperature high since outdoor curing is about 6 hours faster than standard curing, which means the temperature of the concrete will be higher than the temperature of the surrounding environment, due to its high hydration heat when applying in a construction site. The compressive strength of super retarding concrete appears to be lower than normal concrete due to the retarding action in the early stage. However, as the time goes by, the compressive strength gets higher, and by the 28th day the strength becomes the same or higher than normal concrete.

Optimization of real-time path finding for material handling of finishing work considering the logistics flow (물류량을 고려한 마감공사 자재운반의 실시간 경로탐색 최적화 연구)

  • Kim, Wansoub;Lee, Dongmin;Kim, Taehoon;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.170-171
    • /
    • 2015
  • Resource procurement and material handling are considered as a significant part of construction project especially in large or tall building construction site. There are multiple variables that must be considered in a construction site during finishing work such as movement of materials, equipments, and workers. Therefore, it is difficult for construction workers to find the material handling path solely by intuition. The aim of this study is to propose a real-time path finding model suitable for complicated logistics flow in the field. The model explores the optimal transport path of finishing material with its basis on optimization algorithm, and it determines the direction of the Smart Sign. The proposed model is expected to be utilized for planning of efficient finishing material handling.

  • PDF

The Study On The Actual Condition Of Rebar Work In Korean Building Construction (국내 건설 현장의 철근공사 실태조사에 관한 연구)

  • 이응균;박우열;강경인
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2002.11a
    • /
    • pp.133-138
    • /
    • 2002
  • Rebar work takes up big proportion in a construction work. The current process of purchasing, cutting and election, and working of rebar induces a lot of loss in rebar. This study is focused on analyzing the problem and the present condition of the process from the calculating of rebar quantifies to the actual constructional stage through surveying those who have experience in the estimation department, or the construction site of a domestic construction company. Many reform measures such as diversification of standard(i.e., 8-meter)bar, calculation of rebar quantities and construction according to the rebar election drawing, expansion of accuracy in layout plan, thoroughness in examination of layout plan in advance, utilization of the worked material, systemization of rebar control(management), and a shift in attitude of the field(site) manager were proposed as the result of the survey.

  • PDF

Preliminary Study on the Necessity of Safe Management for Small Construction Sites (소규모 건축현장의 안전관리 필요성에 대한 기초연구)

  • Lim, Jung-Min;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.141-142
    • /
    • 2011
  • This study is a relatively small scale compared to the massive construction company, construction company's safety management level of the low. A small architectural scene safety management is a necessity for basic research as a whole and of 67.20% died in the disaster, which killed the disaster scene in a small building. Small construction site for a reflections of the prevailing security situation, the existing literature and statistical data to determine what the issue, for the purpose of the proposal and come up with improvement measures.

  • PDF