• 제목/요약/키워드: building construction work

검색결과 1,469건 처리시간 0.03초

건설공사(建設工事) 실무분석(實務分析)을 통한 조직관리(組織管理) 개선방안(改善方案) (The Improvement Plan of Organization Management Through the Survey of Actual Condition in Construction Work)

  • 최병주;최현;최석우;김옥규
    • 한국건축시공학회지
    • /
    • 제8권2호
    • /
    • pp.121-129
    • /
    • 2008
  • Domestic exoteric construction market by opening of world construction market with recent FTA of rapidly change. On these time, need quality increase of construction to possess government official and international competitiveness of customer satisfaction by offering consumer building of good quality. Therefore, must establish direction to inspects and must advance forward formation government official's present actual conditions for building company's QI. This study is as following if summarize studying result of formation government official to improve quality in construction spot. First, formation's CEO will for QI need side improvement the formation government official enemy by important thing. Second, at checking activity and systematic action that participate of responsible persons cooperation enterprise space-time by complete charge department organization should be achieved. Third, complete charge department for quality control operation large size construction firm substantially formation Organizational well operate, but heavy hydrogen building company was construed by greatly unprepared misgovernment. AHP analysis result complete charge department is serious necessity, and the CEO under direct control organizational structure was construed by thing which can bring excellent effect in operation management side of quality business side and formation. Therefore, heavy hydrogen building company should does to occupy competitive power high position with tissue at active quality complete charge deputy.

소규모 시공현장 적정공사비 확보를 위한 원가기준 마련 연구 (A Study on Cost Standards for Securing Appropriate Construction Costs for Small-Scale Construction Sites)

  • 오재훈;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.347-348
    • /
    • 2023
  • In construction sites, small-scale construction quantities or limited work hours below the daily work volume may occur due to on-site conditions. For small-scale quantities, the input of equipment and labor is designed based on an hourly basis in the invoice, resulting in a difference from the actual cost. In this study, we aim to explore solutions from the perspective of construction cost standards to secure appropriate construction costs for small-scale and time-limited construction sites. Firstly, to preserve the basic construction costs on-site, we established standards where half the cost would be charged for construction quantities below four hours and a full day's cost would be designed for construction quantities between four to eight hours. Additionally, realistic construction cost calculation standards are expected to be provided by realizing a surcharge rate for work hour limitations to secure appropriate construction costs.

  • PDF

Collaborative Relationship Analysis between Members of Apartment Construction Organizations

  • Kim, Jae-Yeob
    • 한국건축시공학회지
    • /
    • 제14권1호
    • /
    • pp.102-109
    • /
    • 2014
  • The purpose of this study is to analyze collaborative relationship between members of a building construction organization. For the analysis of collaborative relationship, this researcher collected data by conducting a questionnaire survey with members of three large building construction organizations for apartment housing. The analyzed contents of collaborative relationship were the 'frequency of communication between organizational members' and their 'reliability'. According to the analysis of communication network, construction managers had low frequency of communication, whereas those responsible for each area, like construction deputy managers, had high frequency of communication. It indicates that middle managers are at the center of communication related to construction work in construction organizations. According to the analysis of reliability network, construction managers showed highest reliability, and employees at the top level in an organizational map also showed high reliability. Since they generally have a lot of experience, are some older of age, and assume responsibility for work, they are considered to receive reliability from other organizational members. This study proved that it was possible to numerically express reliability of organizational members, which is an abstract concept, and analyze it. Therefore, it is expected that the analysis result will highly be likely to be used in the area of construction management.

건물 자동화 시공 시스템 개발 방향에 관한 연구 (The Study on the Suggestion of Development Guideline for Automated Building Construction System)

  • 이웅균;강경인
    • 한국건축시공학회지
    • /
    • 제7권3호
    • /
    • pp.67-73
    • /
    • 2007
  • Increasing wages and decreasing skilled labors are problems awaiting solution. The development of automatic technologies contributes to accelerating the one of construction automation. Thus, this study is to suggest the way to develop the automated building construction system base on one performed in Japan in order to solve urgent problems of construction industry in Korea. Therefore interviews and questionnaires were performed based on experts who work for the automated building construction system field and analyzed through analytic hierarchy process. In doing so, it was the most important factor to develop a branch of automatic, mechanical or machine technologies for the automated building construction system. Especially the study indicated the importance of the technologies to substitute skilled labors such as a robot. This research could contribute to developing the automated building construction which is very unique and suitable for construction industry in Korea.

사례분석에 의한 HPC공법의 공사비 분석 (Construction Cost Analysis of HPC Method by PC Construction Project Cases)

  • 노주성;김재엽
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2017년도 춘계 학술논문 발표대회
    • /
    • pp.101-102
    • /
    • 2017
  • This study was carried out as basic study to apply to construction site the HPC method which is being developed. The construction cost of HPC method was analyzed in comparison with conventional method (half slab method). With regard to research method, it was decided that data on construction work carried out by half slab method was analyzed. According to the results of study, in case of being applied to the construction work using a divided column, the number of columns was decreased. So, it was shown that member production cost, and transport and assemblage cost reduced. In case of being applied to construction work using an undivided column, the analysis showed that there was little difference in construction cost. Therefore, the analysis showed that, if HPC construction method was applied to large structure using a large column, the construction cost was reduced to some extent in comparison with conventional half slab method.

  • PDF

철근 콘크리트 공사의 자동화 대상작업 도출 (Derivation of Work to be Automated in Reinforced Concrete Construction)

  • 전은비;김균태
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.293-294
    • /
    • 2021
  • For the successful introduction of the construction automation system, it is necessary to define the consideration factors and target tasks for the necessity of automating the conventional methods. In this study, the factors for automation were derived through brainstorming and questionnaires, and calculated the relative importance through the pairwise comparison using the AHP analysis method. In addition, the detailed type of concrete work was classified into 32 detailed works, and the automation score for each work was calculated by investigating the factors considering the necessity of automation. As a result of the automation score analysis, it was concluded that the need for automation of concrete placing work was the highest. Based on this study, we will consider the strategy of a concrete construction automation system.

  • PDF

건설공사 중 토공사의 핵심 지표 체계(KPI) 구축을 위한 기초연구 (Basic Research to Establish a Key Performance Indicator(KPI) System of Earthworks during Construction Project)

  • 정용일;이찬우;강경인;조훈희
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 봄 학술논문 발표대회
    • /
    • pp.85-86
    • /
    • 2021
  • KPI, an indicator that measures the performance of factors that contribute to achieving strategies of individuals or organizations, is used a lot to analyze the performance of construction work. Construction work consists of individual construction types with different characteristics such as progress method, scale, and input resources, but currently, KPIs for performance analysis of individual construction types are lacking. Therefore, this study aims to obtain and analyze data for establishing construction performance analysis KPIs during construction work to prepare the basis for the creation of future construction KPIs. Preliminary KPIs for earthwork performance analysis selected through this study are expected to be the basis for deriving preliminary KPIs for other individual construction types.

  • PDF

공동주택 마감공사 중요도 기반 작업지연 요인 분석 (Delay Factors Based on the Importance of Finish Work in Apartment Construction Project)

  • 이승훈;이상효;김주형;김재준
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

공동주택 철근공사의 현장분석을 통한 생산성에 관한 연구 (Productivity Analysis of Rebar Works in Apartment Housing Construction Project)

  • 하기주;최민권;이동렬;하영주;하민수;하재훈
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2010년도 춘계 학술논문 발표대회 1부
    • /
    • pp.165-166
    • /
    • 2010
  • In this study, it was accomplished to analyze the productivity and manpower through the activity of rebar work for the application of rational construction cost in apartment house. And the rebar work is very important in the view of the expense and safety, and durability in the construction of R/C structure. Also the rebar work is very affected with productivity owing to the lack of manpower and materials cost rise.

  • PDF

자립형 철골 접합부를 이용한 철골설치 방식의 경제성 평가에 관한 연구 (A Study on Economic Evaluation Method of Steel Erection Work using by Self-supported Steel Joint)

  • 김창기;김태훈;조훈희;강경인
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 추계 학술논문 발표대회
    • /
    • pp.3-7
    • /
    • 2009
  • Construction projects are being the skyscraper and the large size by limited site condition and developing construction technology. Therefore, Steel structure work is steadily increasing caused by easy to work and structural safety. However, steel-frame work has the large incidence of heavy accident potentially. Recently a research group has recently developed newly designed self-supported steel joint for enhancing safety of steel erection work. Before applying the steel joint in a construction site, economic evaluation should be performed. Thus, we proposed the method for measuring economic efficiency of the new steel joint and verified economic feasibility of the steel joint method through a case study. As a result, Steel erection method using by self-supported steel joint showed economic rather than the one using by H-beams.

  • PDF