An Analysis of the Relative Importance of Processes in the Closure Phase of Construction Program (건설프로그램 종결단계 업무프로세스의 상대적 중요도 분석)

  • Lee, Woo-Yeon;Lee, Seung-Hoon;Cha, Yongwoon;Hyun, Chang-Taek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.4
    • /
    • pp.62-71
    • /
    • 2020
  • Various studies on program management have been attempted due to recent changes in the environment of the construction market, and the importance of closure phase in each phase of the construction program is increasing. However, the reality is that the related research is insufficient and the field has been managed in a rule of thumb according to individual capabilities. Therefore, in order to successfully close the construction program and enhance satisfaction of stakeholders in the closure phase of the construction program, the key stakeholders were identified using the Power and Interest Matrix. The relative importance of the closure phase process was analyzed using AHP analysis method. It was also verified through on-site surveys and interviews about the proposed importance of the closure stakeholder and the relative importance of the process. It is expected that this study will increase the satisfaction of stakeholders and contribute to a successful closure if the user puts a lot of resources into the process that has a high priority in the closure phase of the construction program proposed in this study.

Decision Making Model Using Multiple Matrix Analysis for Optimum Transportation Equipment Selection of Modular Construction (다중매트릭스 분석기법을 통한 모듈러 건축의 최적 운송장비 선정 의사결정지원 모델)

  • Lee, HyunJeong;Lee, JooSung;Lim, Jitaek
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.6
    • /
    • pp.84-94
    • /
    • 2020
  • Modular architecture is very important not only in the design phase but also in the construction planning phase because it affects construction methods and module sizes depending on transport equipment. There are economic risks as well as quality, as there may be defects such as internal interiors or elimination of deadlines during transportation, and structural torsion caused by rainfall and shock. However, there is a lack of objective criteria or data to refer to in determining transport equipment that has a material effect on transport. Accordingly, there is no decision model to determine the optimum transportation equipment for each construction site. Therefore, it is necessary to develop a decision support model that can be compared to the review of transport equipment selection factors. The purpose of this study is to propose the transport equipment impact factors and decision support models for systematic review and objective decision making of each construction plan in the construction of small and medium-sized modulators. The decision model proposed in this study can be used as basic data for transport studies, ensuring objectivity and transparency in the equipment selection process.

A Study on the Data Organization of Specification Information for reference of Design Information (설계정보 참조를 위한 시방정보의 자료구조화에 관한 연구)

  • Kim Jae-hyun;Song Younk-Kyou;Kim Uk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.3 s.7
    • /
    • pp.92-100
    • /
    • 2001
  • The architectural drawing, construction project specification, etc. are included in the contract of a documents. However, construction project specification, for being documentation, is not utilized to such an extent. The reason is that specification information is difficult in collecting information in relation to the architectural drawing, material finishing list and other architectural information. Therefore, an integrated model, which can be associated with other architectural information, is needed, and a DB based on this integrated model must be established in order for it to be utilized in design, construction, and management. The DB, which is established through this process, must be updated according to modification in design, and construction. Furthermore the specification must be in document on the web for reference. Consequently in this research, the structure of integrated model has been introduced, and it has made the search and preparation of the integrated model on the Internet, using the specification information DB established for the mutual reference of DB, possible. The improvements of construction project specification standards are expected by this system. Also, it will bring about Improvements upon claim prevention, and design, construction, management qualities. Furthermore, it will make the use of information more convenient in practical business such as order agency, design service and building site.

  • PDF

Analysis of Ambivalence Differences among Groups for Temporary Firefighting Facilities of Workers at Construction Sites (공사현장 근로자의 임시소방시설에 대한 집단 간 Ambivalence 차이분석)

  • Moon, Pil-Jae;Kong, Ha-Sung
    • The Journal of the Convergence on Culture Technology
    • /
    • v.7 no.4
    • /
    • pp.765-778
    • /
    • 2021
  • The purpose of this study is to prevent fire accidents in advance by deriving prior knowledge among groups about temporary fire-fighting facilities of workers at construction sites and devising appropriate improvement measures. The findings are as follows.First, in the case of fire extinguishers, statistical attention was paid to the contractor, supervisor, partner worker and fire extinguisher manager between designations. 87% of fire managers and 70% of facility supervisors said fire extinguisher management managers needed to be designated for each type of construction, which requires designation of fire extinguisher management managers, frequently checking and relocating. Second, in the case of simple fire extinguishing facilities, statistical attention was paid to the application of penalties for unauthorized use of fire extinguishing facilities with construction companies, supervisors, and business partners.Third, in the case of emergency alarm measures, statistical attention was paid to the application of emergency alarm sound to temporary broadcasting facilities with construction works, supervisors, and business partners.Fourth, in the case of induction, statistical attention was paid to the application of connection between construction works, supervisors, and partner workers, such as passage guidance, emergency lighting, etc.It was found that 65% of construction workers and 55% of electrical workers had different applications such as aisle guidance and emergency lighting for each type of business partner. In order to resolve blind spots such as evacuation zone guidance due to the structure of the building, it is necessary to easily distinguish the direction of the entrance door from a long distance by applying it in conjunction with passage guidance lights and emergency lighting.

Skin Friction and End Bearing Resistances of Rock-socketed Piles Observed in Bi-directional Pile Load Tests (양방향 재하시험 결과를 이용한 암반소켓 현장타설말뚝의 주면 마찰력과 선단 지지력)

  • Song, Myung-Jun;Park, Yung-Ho;Kim, Myoung-Mo
    • Journal of the Korean Geotechnical Society
    • /
    • v.29 no.7
    • /
    • pp.17-36
    • /
    • 2013
  • In this paper, the empirical relations of skin friction and end bearing resistance with the results of site investigation in soft rock are proposed through the analysis of bi-directional pile load tests of rock socketed drilled shafts performed at large offshore bridge foundations and high-rise building projects (13 test piles in 4 projects). The site investigation and drilling for bi-directional pile load tests were performed at the centers of test piles, and f-w curves for skin friction and q-w curves for end bearing were plotted based on load-transfer measurements. From the above curves, the empirical relations of skin friction and end bearing resistance with the results of site investigation depending on the mobilized displacement are determined by multiple regression analysis and compared with previous studies. Since the f-w and q-w curves of rock-socketed piles in Korea show hardening behavior according to mobilized displacement, the developed empirical relations by the mobilized displacement are more reasonable than those of previous studies which could not consider the mobilized displacement and suggested the ultimate capacity with unconfined compressive strength only. Particularly, the developed equations correlated with unconfined compressive strength show the best correlations among the equations correlated with other parameters.

TACT Productivity Management for Finish Works of Residential Buildings using Productivity Achievement Ratio (PAR) (공동주택 마감공사 TACT 기법 생산성 관리 - Productivity Achievement Ratio를 활용한 생산성 관리 -)

  • Joo, Seonu;Park, Moonseo;Lee, Hyun-Soo;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.3
    • /
    • pp.36-48
    • /
    • 2015
  • To complete various types of finish works with higher quality in much less time, TACT, which was mostly used for high-rise buildings, has been adapted to meet the needs for systematic schedule management in construction sites. However, the effectiveness of adapting TACT has not been shown as expected due to the different perspectives on productivity from both general contractor and subcontractors based on unforeseen conditions according to the types of site. Furthermore, not enough theoretical backgrounds, empirical data, and systematic approaches to solve the fundamental problems caused by each participants' different views on productivity has produced obstacles for establishing effective solutions. Therefore, this research aims to analyze the possible main reasons for having different point of views regarding productivity among various participants of residential building sites using TACT based on literature review, site survey, and interviews. Also, case study was conducted to propose obtainable productivity (OP) regression equation and productivity achievement ratio (PAR) with reduction factors (RFs) and actual productivity (AP) data from an actual construction site. The proposed outcome may assist general contractors converting output management with PPC to productivity management with actual data using PAR. On the other hand, subcontractors would be able to estimate theory-based maximum productivity of construction sites with TACT by using OP. The PAR will enhance the communication between general and sub-contractors for their decision making process. Finally, the main RFs derived from PAR could be used as essential keys for productivity management to increase the economical and operational effectiveness of the construction project.

Considerations on ground preparation for the Gimhae Bonghwang-dong Ruins (김해 봉황동 유적 대지조성에 대한 소고(小考))

  • YUN Sunkyung
    • Korean Journal of Heritage: History & Science
    • /
    • v.55 no.4
    • /
    • pp.24-36
    • /
    • 2022
  • The Bonghwang-dong ruins in Gimhae, the central area of Geumgwan Gaya, is presumed to be the site of the royal palace, and excavations have been in progress at the Gaya National Cultural Heritage Research Institute. According to a research conducted by lowering the level to the base layer on the north side of the site, mostly shell layers composed of oysters were confirmed, and soil composed of different material was alternately filled in to form a site construction. In other words, it can be seen that there was work at the site of the Bonghwang-dong ruins that required large-scale labor, such as building ramparts and embankments. There is stratigraphic confusion such as showing different age values in the same shell layer through a chronological analysis of organic matter and charcoal in the sedimentary layer, and deriving a result value in the upper layer ahead of the lower layer. In addition, open-sea diatoms are observed not only in the sedimentary layers, but also the pits. Therefore, it is judged that the soil constituting the ruins was brought from the outside. The Bonghwang-dong ruins are located inside the commonly called Bonghwang earthen ramparts, where many excavation organizations conducted research within the estimated range of the earthen fortifications. As a result, it was found that it was similar to the sedimentary layers of the ruins of the Three Kingdoms Period, which were investigated along with the ruins of Bonghwang-dong. Through this, the surrounding ruins, including those of Bonghwang-dong, were located close to paleo-Gimhae Bay, so it is believed that the soil brought from the surroundings was used to reinforce the ground. As a result of the excavation research on the Bonghwang-dong ruins conducted so far, it was found by sedimentary layer analysis and soil experiments that the ruins were created on stable land. Relics excavated in the sediments of the ruins and carbon dating data show that Bonghwang-dong carried out large-scale civil construction work in the 4th century to build the site, which clearly shows the status of Geumgwan Gaya.

Analysis on Energy Demand Resulting From the Change in Window Area & Installation of Interior Exterior Blinds (건축물에너지효율등급 기밀시험이 등급에 미치는 영향분석)

  • Kim, Dae-Won;Chung, Kwang-Seop;Kim, Young-Il;Nam, Ariasae;Ju, Jung-Kyeong
    • Journal of Energy Engineering
    • /
    • v.23 no.1
    • /
    • pp.40-45
    • /
    • 2014
  • The ventilation frequency of 0.5 times in residential facilities is applied mandatorily to the housing facilities containing more than 100 house units to improve the indoor air quality and create comfortable interior conditions and pleasantness for residents. The Building Energy Efficiency Rating system requires the implementation of leakage test based on ventilation frequency with the test results being reflected in the efficiency ratings, thereby stimulating the precise construction of the fittings in the periphery of windows and savings of energy that can be lost due to the infiltration air. The inspection results of the Building Energy Efficiency Rating at the site showed that the ventilation frequency was in the range between 0.63 and 0.71 and that the difference was found to have a significant effect on the amount of energy reduction. It is urgent to conduct the study on highly leakage-proof buildings and construction methods, along with the expansion of mandatory leakage-proof diagnosis of non-residential buildings, considering the mandatory ventilation frequency below 0.6 for passive houses under the European standards and the target set by Korea to introduce the passive house, the rigorous standard for energy efficiency in buildings and mitigating their ecological footprint, by 2017 and achieve the zero house by 2025.

Investigation of Underground buried Cables based on Ground Penetrating Radar Data (지표 투과 레이더 데이터 기반 지하 매설 케이블 조사)

  • Choi, SungKi;Yoon, Hyung-Koo;Kim, YoungSeok;Kim, Sewon;Choi, Hyun-Jun;Min, Dae-Hong
    • Journal of the Korean Geotechnical Society
    • /
    • v.40 no.2
    • /
    • pp.105-113
    • /
    • 2024
  • Underground buried cables can cause disconnections during the construction of roads and other subterranean structures due to uncertain designs. This paper describes experiments conducted to detect and verify the locations of these cables utilizing ground penetrating radar (GPR). The experiments were carried out at an active road construction site, where cable burial was anticipated. The GPR used operated within a frequency range of 400 MHz to 900 MHz to probe underground structures. The exploration methodology consisted of an initial GPR test to survey the entire area, followed by a secondary test informed by the results of the initial experiment, incorporating a diverse and increased number of lines. The findings confirmed the hyperbolic reflection patterns of cables at consistent locations along the same lines. These patterns were then compared to existing designs to corroborate the presence of cables at the identified locations. This research establishes an effective GPR methodology based on the electromagnetic wave reflection pattern, specifically the hyperbola, to detect difficult-to-locate underground buried cables.

Case of assembly process review and improvement for mega-diameter slurry shield TBM through the launching area (발진부지를 이용한 초대구경 이수식 쉴드TBM 조립공정 검토 및 개선 사례)

  • Park, Jinsoo;Jun, Samsu
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.24 no.6
    • /
    • pp.637-658
    • /
    • 2022
  • TBM tunnel is simple with the iterative process of excavating the ground, building a segment ring-build, and backfilling. Drill & Blast, a conventional tunnel construction method, is more complicated than the TBM tunnel and has some restrictions because it repeats the inspection, drilling, charging, blasting, ventilation, muck treatment, and installation of support materials. However, the preparation work for excavation requires time and cost based on a very detailed plan compared to Drill & Blasting, which reinforces the ground and forms a tunnel after the formation of tunnel portal. This is because the TBM equipment for excavating the target ground determines the success or failure of the construction. If the TBM, an expensive order-made equipment, is incorrectly configured at the assembly stage, it becomes difficult to excavate from the initial stage as well as the main excavation stage. When the assembled shield TBM equipment is dismantled again, and a situation of re-assembly occurs, it is difficult throughout the construction period due to economic loss as well as time. Therefore, in this study, the layout and plan of the site and the assembly process for each major part of the TBM equipment were reviewed for the assembly of slurry shield TBM to construct the largest diameter road tunnel in domestic passing through the Han River and minimized interference with other processes and the efficiency of cutter head assembly and transport were analyzed and improved to suit the site conditions.