• Title/Summary/Keyword: bridges construction

Search Result 1,072, Processing Time 0.024 seconds

Development of an Approximate Cost Estimating Model for Bridge Construction Project using CBR Method (사례기반추론 기법을 이용한 교량 공사비 추론 모형 구축)

  • Kim, Min-Ji;Moon, Hyoun-Seok;Kang, Leen-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.14 no.3
    • /
    • pp.42-52
    • /
    • 2013
  • The aim of this study is to present a prediction model of construction cost for a bridge that has a high reliability using historical data from the planning phase based on a CBR (Case-Based Reasoning) method in order to overcome limitations of existing construction cost prediction methods, which is linearly estimated. To do this, a reasoning model of bridge construction cost by a spreadsheet template was suggested using complexly both CBR and GA (Genetic Algorithm). Besides, this study performed a case study to verify the suggested cost reasoning model for bridge construction projects. Measuring efficiency for a result of the case study was 8.69% on average. Since accuracy of the suggested prediction cost is relatively high compared to the other analysis methods for a prediction of construction cost, reliability of the suggested model was secured. In the case that information for detailed specifications of each bridge type in an initial design phase is difficult to be collected, the suggested model is able to predict the bridge construction cost within the minimized measuring efficiency with only the representative specifications for bridges as an improved correction method. Therefore, it is expected that the model will be used to estimate a reasonable construction cost for a bridge project.

Evaluation on the Structural Performance and Economics of Ultra-high Performance Concrete Precast Bridges Considering the Construction Environment in North Korea (북한 건설환경을 고려한 초고성능 콘크리트 프리캐스트 교량의 구조성능 및 경제성 평가)

  • Kim, Kyoung-Chul;Koh, Kyung-Taek;Son, Min-Su;Ryu, Gum-Sung;Kang, Jae-Yoon
    • Journal of the Korean Recycled Construction Resources Institute
    • /
    • v.9 no.2
    • /
    • pp.208-215
    • /
    • 2021
  • In this study, a customiz ed bridge system was developed for North Korea application. For the application of North Korea, the customized bridge system design, fabrication, and construction performance evaluation were performed using ultra-high performance concrete a compressive strength 120MPa or more and a direct tensile strength 7MPa or more. The comparison of the North Korean truck luggage load(30, 40, 55) and the Korean standard KL-510 load showed that cross-section increased as the load increased. Furthermore, a bridge with a span length of 30m was fabricated with ultra-high performance concrete for the construction performance evaluation. The evaluation of the load condition analysis was performed by a flexural test. The results showed that a bridge with a span length of 30m secured about 167% of sectional performance under initial cracking load conditions and about 134% of load bearing capacity under ultimate load conditions. As a result of economic analysis, the customized bridge system using ultra-high-performance concrete was less than about 11% of the upper construction cost compared to the steel composite girder bridge. Therefore, these results suggest that the price competitiveness can be secured when applying the ultra-high-performance concrete long-span bridge developed through this study.

Determination of the Initial Tendon Force using Rating Factor Equation in Composite Girders Strengthened with External Tendons (외부 긴장재로 보강된 강합성보의 내하율 산정식을 이용한 초기 긴장력 결정)

  • Choi, Dong Ho;Chung, Sang Hwan;Yoo, Dong Min
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.5 s.78
    • /
    • pp.527-536
    • /
    • 2005
  • A method of reinforcement using external tendons has been found to be one of the effective techniques of reinforcement and its application is increasing. In this paper, the method to calculate the initial tendon force is proposed for the improvement of load-carrying capacity in existing steel-concrete composite bridges. An equation for the increment of tendon force was derived for tendon configurations and live load types, and the effect of reinforcement in a composite beam was numerically studied. The method to calculate the number of tendon and initial tendon force was presented by proposing the new method to calculate the rating factor, which considers the increment of tendon force. The method was shown to be effective for an existing steel-concrete bridge.

Integral Bridge Using H-pile (H-말뚝을 이용한 일체식교대 교량)

  • 정경자;김성환;유성근
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1999.03a
    • /
    • pp.241-248
    • /
    • 1999
  • The existing bridge with deck joint has many problems during construction and maintenance. To overcome these difficulties, an integral bridge, which is defined as the practice of constructing bridges without deck joints, is proposed in this study. A test bridge with 3 spans of PC beam was selected to verify the function of the bridge and is under construction. Characteristics of integral bridge are followings: $\circled1$ Flexible H-piles under the abutment are installed to accommodate thermal movements of the superstructures of bridge. $\circled2$ PC beam of the superstructure and the abutment are integrated. $\circled3$ The existing approach and relief slabs are applied to minimize the stress transfer occurred from the bridge deck to the pavement. $\circled4$ A cyclic control joint is installed between approach and relief slabs to absorb the thermal movement. $\circled5$ It is used a dual direction bearing which is cheaper than single direction bearing and has a good workability as well. It is also installed a shear block on the top of pier coping to protect the lateral movement caused by temperature change and earthquake.

  • PDF

Optimal Design of Bridge Substructure Considering Uncertainty (불확실성을 고려한 교량 하부구조 최적설계)

  • Pack, Jang-Ho;Shin, Young-Seok;Shin, Wook-Bum;Lee, Jae-Woo
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.387-390
    • /
    • 2008
  • The importance of the life cycle cost analysis for construction projects of bridge has been recognized over the last decades. Accordingly, theoretical models, guidelines, and supporting softwares have been developed for the life cycle cost analysis of bridges. However, it is difficult to predict life cycle cost considering uncertainties precisely. This paper presents methodology for optimal design of substructure for a steel box bridge. Total life cycle cost for the service life is calculated as sum of initial cost, damage cost considering uncertainty, maintenance cost, repair and rehabilitation cost. The optimization method is applied to design of a bridge substructure with minimal cost, in which the objective function is set to life cycle cost and constraints are formulated on the basis of Korean Bridge Design Specification. Initial cost is calculated based on standard costs of the Korea Construction Price Index and damage cost on the damage probabilities to consider the uncertainty of load and resistance. An advanced first-order second moment method is used as a practical tool for reliability analysis using damage probability. Maintenance cost and cycle is determined by a stochastic method and user cost includes traffic operation costs and time delay costs.

  • PDF

A Research on Analyzing Current Status and Ways to Improve Access Transportation to Incheon International Airport (인천국제공항 접근교통시설의 현황분석 및 개선방안에 관한 연구)

  • Suh, Yang Hwan;Kim, Kyong Sook;Han, Soon Wook;Yoon, Sung Hyun
    • Journal of the Korean Society for Aviation and Aeronautics
    • /
    • v.20 no.4
    • /
    • pp.106-114
    • /
    • 2012
  • As Incheon International Airport(IIA) is located in an island 50-km away from Seoul, various travel equipments for access are required. So far two connecting bridges are constructed funded by civilian funds. For the further bridge construction, the reduction of forecast traffic amount and the government subsidy for the civilian funds are big issues. Comparing the access traffics of IIA to those other competing airports, traffic conditions inside the airport are superior to other competing airports from the management point of view, as utilization conditions and equipment capacities are periodically monitored and evaluated to set up comprehensive countermeasures following constructing by stages. However, while the accessability to IIA is very important, as IIA is built on an island the conflicts between near-by developers and traffic facility operators make further bridge construction difficult. As improving the accessibility to an airport is not easy to achieve only by the IIA management's efforts, the central government level authorities should organize a committee with agencies concerned and analyze the characteristics of access traffic periodically to suggest reform measures for each organization concerned to implement appropriate undertakings at apt timing. For the future, central government's level empirical research on the airport accessibility for synthetic and systematic plan set-up is expected.

Elastic Interactive Shear Buckling Behavior of Trapezoidally Corrugated Steel Webs (제형파형강판 복부판의 탄성 연성전단좌굴 거동)

  • Yi, Jong Won;Gill, Heung Bae;Lee, Hak Eun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.707-715
    • /
    • 2005
  • Corrugated webs have been used for composite prestressed concrete box girder bridges. Innovative steel plate girders using corrugated webs have been proposed. It has been found that analytical and experimental researches conducted to determine the strength of trapezoidally corrugated webs can fail with respect to three different buckling modes: local, global, and interactive shear buckling. Shear buckling capacity equations based on classical and orthotropic plate buckling theories have been proposed,but these equations show some differences. In this paper, geometric parameters that influence interactive shear buckling behavior with interaction effects are identified via extensive bifurcation buckling analysis using the finite element meth.

Determination of an Optimum Initial Cable Tension Force for Cable-Stayed Bridges using the Least Square Method (최소자승법을 이용한 사장교의 적정 케이블 장력 결정)

  • Park, Yong Myung;Cho, Hyun Jun
    • Journal of Korean Society of Steel Construction
    • /
    • v.17 no.6 s.79
    • /
    • pp.727-736
    • /
    • 2005
  • This study presents a method of determining the optimum cable tension forces for the proper initial equilibrium state of a cable-stayed bridge using the least square method. The proposed method minimizes the errors, i.e., the differences, such as the deflection and the moments of the girder and the tower, between the target values from a continuous beam by considering the cable anchor point as supports of the girder and the responses obtained from the analysis of the entire cable-stayed bridge system. Especially, the proposed method can selectively control the adjustment of the tower moment, the girder moment, and the deflections by introducing the weighing matrix. Through numerical analysis and comparisons with existing studies, the usefulness and validity of the proposed method was verified.

Experimental Study on the Composite Beam Strengthened by External Post Tensioning (외부 후긴장으로 보강한 합성보에 대한 실험적 연구)

  • Kim, Gi Bong;Chung, Young Soo;Choi, Hyok Chu;Kang, Bo Soon
    • Journal of Korean Society of Steel Construction
    • /
    • v.10 no.4 s.37
    • /
    • pp.701-708
    • /
    • 1998
  • The application of additional post-tensioning tendons has recently been widely considered and requires very little interference with the existing structure. Several bridges on the national roadway designed as the second class were strengthened by external post-tensioning for the capacity enhancement purpose, but much of that strengthening work was not verified analytically as well as experimentally. This paper examines experimentally the behavior of simple composite steel-concrete beams designed as the second class(DB-18) When they are strengthened with external post-tensioning tendon. Test results show that external post-tensioning increases the ultimate load and the magnitude of tendon force increases the yield load but not the ultimate load.

  • PDF

The study of method local scour protection to the existing piers bridge (기존 교각주변의 국부세굴 방지공법에 관한 연구)

  • Park, Sang-Kil;Chang, Tae-Rae;Park, Byung-Yul
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2006.05a
    • /
    • pp.598-602
    • /
    • 2006
  • Local scour is associate with particular local types of vortex around bridge piers. This paper is method of protection local scour for the existing Busan City subway 3 Line bridge piers and Gupo large bridge piers. In order to take design of protection of local scour this bridge piers, We calculate the local scour hole of depth , scour width, riprap construction , filter construction by formulas. We had experimental hydraulic model test for this bridge piers in order to take proof for the calculation of local scour. We knew that the vortex intensifies the local flow velocities and acts to erode sediment from the scour hole and transport it downstream. As the result of hydraulic model test, we could suggest three types method of protection local scour this bridges. We knew that FHWA HEC-18(Richardson et al. 2001: Modified CSU) Formula is useful to checking calculation as application of field. One is pier protection using the sheet piles and riprap, the others are pier protection using the riprap with filter and to make renew Wall-caisson. The best method of protection for the existing Busan City subway 3 Line bridge piers and Gupo large bridge piers is pier protection using the sheet piles and riprap.

  • PDF