Integral Bridge Using H-pile

H-말뚝을 이용한 일체식교대 교량

  • 정경자 (한국도로공사, 도로연구소) ;
  • 김성환 (한국도로공사, 도로연구소) ;
  • 유성근 (동아건설산업(주) 기술연구소)
  • Published : 1999.03.01

Abstract

The existing bridge with deck joint has many problems during construction and maintenance. To overcome these difficulties, an integral bridge, which is defined as the practice of constructing bridges without deck joints, is proposed in this study. A test bridge with 3 spans of PC beam was selected to verify the function of the bridge and is under construction. Characteristics of integral bridge are followings: $\circled1$ Flexible H-piles under the abutment are installed to accommodate thermal movements of the superstructures of bridge. $\circled2$ PC beam of the superstructure and the abutment are integrated. $\circled3$ The existing approach and relief slabs are applied to minimize the stress transfer occurred from the bridge deck to the pavement. $\circled4$ A cyclic control joint is installed between approach and relief slabs to absorb the thermal movement. $\circled5$ It is used a dual direction bearing which is cheaper than single direction bearing and has a good workability as well. It is also installed a shear block on the top of pier coping to protect the lateral movement caused by temperature change and earthquake.

Keywords