• Title/Summary/Keyword: breakdown structure

Search Result 685, Processing Time 0.028 seconds

An Analysis on Cost Factor Reduction of Life Cycle for High Speed Train(KTX-1) Based on the Maintenance Information (유지보수정보를 활용한 고속철도차량(KTX-1) 수명주기비용 요소절감 분석)

  • Kim, Jae-Moon;Kim, Yang-Su;Chang, Chin-Young;Lee, Jong-Sung
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.2169-2170
    • /
    • 2011
  • This paper presents about the analysis on cost factor reduction using the life cycle cost model for motor block in the KTX-1. Until now, most life cycle cost of the system as a whole that has been studied. but in case of railway industry part, LCC studies are needed on the subsystem like a propulsion control system because subsystems are developed continuously localization. Therefore, In this paper presents cost breakdown structure for life cycle cost (LCC) estimation for localization development of propulsion control system (Motor Block) in high speed railway vehicle (KTX-1). Also to analysis LCC on motor block, it was analyzed physical breakdown structure (PBS) and preventive cost on propulsion control system in view of maintenance cost. Based on this, we describe life cycle cost on motor block of KTX-1.

  • PDF

A study on MBSE(Model-Based Systems Engineering) application method for concept design of submarine (잠수함 개념설계에 모델기반 시스템 엔지니어링을 적용하기 위한 방법에 대한 연구)

  • Bae, Jeong-Hoon;Kim, Byung-Mok;Kim, Mi-Hee;Shin, Sung-Chul;Kim, Soo-Young;An, Chin-Woo
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.9 no.2
    • /
    • pp.7-14
    • /
    • 2013
  • Because submarine is high-technology and very complex system, it takes a lot of time, cost and manpower for design. For efficient concept design, application of systematic method is required such as system engineering. In this study, we studied application method of MBSE for submarine concept design with SWBS (Ship Work Breakdown Structure). Components of submarine system from SWBS were classified and organized as system architecture with 'Vitech CORE'. Through the MBSE application for concept design, systematic, efficient and traceable concept design of submarine was considered.

Design of 100-V Super-Junction Trench Power MOSFET with Low On-Resistance

  • Lho, Young-Hwan;Yang, Yil-Suk
    • ETRI Journal
    • /
    • v.34 no.1
    • /
    • pp.134-137
    • /
    • 2012
  • Power metal-oxide semiconductor field-effect transistor (MOSFET) devices are widely used in power electronics applications, such as brushless direct current motors and power modules. For a conventional power MOSFET device such as trench double-diffused MOSFET (TDMOS), there is a tradeoff relationship between specific on-state resistance and breakdown voltage. To overcome the tradeoff relationship, a super-junction (SJ) trench MOSFET (TMOSFET) structure is studied and designed in this letter. The processing conditions are proposed, and studies on the unit cell are performed for optimal design. The structure modeling and the characteristic analyses for doping density, potential distribution, electric field, width, and depth of trench in an SJ TMOSFET are performed and simulated by using of the SILVACO TCAD 2D device simulator, Atlas. As a result, the specific on-state resistance of 1.2 $m{\Omega}-cm^2$ at the class of 100 V and 100 A is successfully optimized in the SJ TMOSFET, which has the better performance than TDMOS in design parameters.

Large Eddy Simulation of Swirling Turbulent Flows in a Annular Combustor (환형연소기의 스월난류유동장에 대한 Large Eddy Simulation)

  • Kim, Jong-Chan;Sung, Hong-Gye;Cha, Bong-Jun;Yang, Gye-Byeung
    • Proceedings of the Korean Society of Propulsion Engineers Conference
    • /
    • 2008.05a
    • /
    • pp.67-70
    • /
    • 2008
  • Production and dissipation of turbulent structure in a swirl stabilized combustor was investigated using three-dimensional Large Eddy Simulation analysis. The combustor of concern is the LM6000, lean premixed dry low-NOx annular combustor, developed by GEAE. Inlet condition was based on experimental data. Strong vortex breakdown in main stream, vortex ring proceeding downstream, and the turbulent structure periodically oscillating have been observed. Reasonable agreement was obtained by comparison of the results with experiments and previous LES studies.

  • PDF

A Study on Project Management Scheduling Module Development using the Rule and CBR (규칙(Rule) 과 CBR 기법을 활용한 프로젝트 일정관리 모듈 구현에 관한 연구)

  • Sin, Ho-Gyun;Kim, Yeong-Jun;Jeon, Seung-Ho
    • 한국디지털정책학회:학술대회논문집
    • /
    • 2004.05a
    • /
    • pp.343-354
    • /
    • 2004
  • A Project planning is one of the most important processes that determines success and failure of the project. Scope management for project planning is also essential job in system integration project. However project planning is very difficult because lots of factor and their relationships should be considered. Therefore project planning of SI project has been done by project manager s own knowledge and experiences. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study also present method (ODW model) to cope with the limitations of the existing study that has uniformly customizing the methodology by only project complexity. We propose PPSM(Project planning support module) that apply Rule for determination of route map and document level, and CBR for WBS identification.

  • PDF

Optimum Design of the Interdigitated CB Structure

  • qiang, Yang-Hong;bi, Chen-Xing
    • JSTS:Journal of Semiconductor Technology and Science
    • /
    • v.2 no.3
    • /
    • pp.233-236
    • /
    • 2002
  • Some measures are provided for the optimum design of specific on-resistance $R_{on}$ and breakdown-voltage $V_B$ of interdigitated CB (Composite Buffer) MOSFET, including introducing opposite type impurity into the P region near the $N_+$contact, separating P region from N region with an oxide film, and a groove in the N region near the $P_+$ contact. The new relationship between the $R_{on}$ and $V_B$, which proved by numerical device simulation, are more exact and minute than the qualitative results before.

A Study on the Development of Life Cycle Cost Analysis Methodology in HVAC system for Decision Maker (의사 결정자를 위한 HVAC 시스템의 LCC 분석 방법론 개발에 관한 연구)

  • Jung, Soon-Sung
    • Journal of the Korean Solar Energy Society
    • /
    • v.24 no.4
    • /
    • pp.55-63
    • /
    • 2004
  • The purpose of this study is to development of life cycle cost analysis methodology of HVAC system for decision maker. The results of this study are as follows; maintenance/management, equipment construction, planning/design, and demolition/sell phases (1) To develop the cost breakdown structure for LCC in HVAC system, this study apply the method of additional pertinent level, title, CBS number, block number and variable index. (2) LCC analysis order of HVAC system compose four phase. (3) Life cycle costing influence diagram can bring us to make the most efficient decision through a visual graphical diagram that is shown relationship among variables and that decision maker traces easily from life cycle cost analysis situation.

The Effect of Dislocation Pipe Diffusion on Electro-Migration-Induced Breakdown in an FCC Structure (면심입방구조에서 Electro-Migration-Induced Breakdown에 대한 전위파이프 확산의 영향)

  • 이득용
    • Journal of the Korean Ceramic Society
    • /
    • v.28 no.11
    • /
    • pp.878-884
    • /
    • 1991
  • The mobility and diffusivity in an edge dislocation in an FCC crystal formed by the removal of one half of a (100) plane were evaluated in an applied field by analyzing a vacancy tight binding model using Stark's matrix technique. A model of an edge dislocation in an FCC crystal was constructed for a [100] Burgers vector where vacancy transport along the edge dislocation in an FCC crystal was constructed for a [100] Burgers vector where vacancy transport along the edge of the extrac half plane of ions was considered. The model considered a tight binding approximation of the vacancy to the compressed region of the core and carried the calculation to the limit of an infinite length of dislocation. The diffusivity and the ratio of mobility to diffusivity were found to increase without bounds in the limit where the correlation factor becomes zero. In contrast, as the correlation factor became unity, the diffusivity became zero and the ratio of mobility to diffusivity became unity associated with the uncorrelated limit of 1/kT. This implied that the phenomenon was not unique to the crystal structure but was unique to edge dislocations with vacancy tight binding.

  • PDF

Analysis of Boundary Conditions for Cost Breakdown Structure in the Construction and Maintenance phase (시공단계와 유지관리단계 비용분류체계의 경계조건 분석)

  • Jeong, Jae-Hyuk;Shin, Han-Woo;Kim, Tae-Hui
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.21-23
    • /
    • 2012
  • The process of building project for planning, designing, construction, maintenance, and waste disposal are related with each other. However, we have a difficulty for estimating building's LCC due not to be flexible each other. Therefore, we analyzed the boundary condition between the process of construction and maintenance, and analyzed the factor of segment. We also suggested the Link System for flexible relation.

  • PDF

An Establishment the Work Breakdown Structure for Owners in the Multi-Complex Project (입체·복합 프로젝트에서 발주자 중심의 WBS 구축방향)

  • Ko, Dae-Jun;Choi, Eun-A;Seo, Young-Chil;Lee, Sang-Beom
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2008.05a
    • /
    • pp.127-131
    • /
    • 2008
  • The successful project management is based on definition of project goals in construction industry. The WBS(Work Breakdown Structure) is one of the major factors which defines works related to project goals. The necessity of the WBS for owners in multi complex projects which would help them to understand the whole project is rising because the multi-complex project in the construction industry has increasing recently. Therefore, this study suggests directions to establish the WBS for owners through investigating a concept of the multi-complex project first and analyzing types of project, domestic and foreign WBS, and case studies.

  • PDF