• Title/Summary/Keyword: architectural design process

Search Result 949, Processing Time 0.041 seconds

Synergies between Digital Models and Physical Models in Convergence Design - Case Studies using Projects of Architectural Firms and Educational Environments - (건축설계에서 융합설계를 위한 디지털 모델과 물리 모델의 역할과 상호보완성 - 건축설계 회사와 교육환경의 사례를 중심으로 -)

  • Kim, Do-Young
    • Journal of KIBIM
    • /
    • v.9 no.2
    • /
    • pp.29-44
    • /
    • 2019
  • This paper is to explore examples of complementary use of digital and physical models. The reason for this is to suggest a method for commercializing architectural design considering high technology. These cases are the practical and educational environment in which design processes based on digital computation technology are performed. Also, in this environment, analog design media (eg, physical models) still being used in the design process using digital computing. Indeed, in this environment, designers are exploiting digital and physical models to address the types of risks that can be discovered when designs are implemented and these risks. By analyzing these cases, we define the roles of digital and physical models to visualize and resolve risks. This paper focuses on one of method as "prototyping", which is used in the field of machinery and is a difficult method to carry out in the conventional design process. In particular, designers look for benefits that encourage designers in utilizing current digital computation technologies (eg, parametric design, simulation, building information models, and digital fabrication). Among the roles of the physical model, roles that can not be replaced by the digital model are explored. It is clear that this case-based study has difficulty in generalizing the design method. However, it helps the designers of today's practical and educational environment to verify and design the actual details of construction and operation when applying and developing unfamiliar materials and methods in the field of architecture.

A Study on the Application of Design VE Process in Pre-Construction Phase for GMP Determination of CM at Risk Project (시공책임형 CM 사업의 GMP 결정를 위한 시공이전단계 설계VE 프로세스 적용방안 도출)

  • Park, Bo-sung;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.5
    • /
    • pp.56-64
    • /
    • 2022
  • Although pilot projects have been actively carried out from 2017 to present to institutionalize CM at Risk, one of the major tasks for innovation in the construction industry, standards and processes related to Design VE, a key tool for determining GMP in the pre-construction phase, have not yet been established. Therefore, through research and operation status related to CM at Risk and Design VE, and survey on project participants' perception, the problem of the existing design VE process was derived, and the design VE process suitable for the CM at Risk project was proposed. The application plan was proposed in three aspects: Schedule, Cycle, and Process, and the appropriateness and applicability were verified through FGI. The results of this study are expected to be used as basic data on the establishment and legislation of order standards to be made in the future.

Examining Understanding and Knowledge of Time Management Perception for the Architectural Education in the United States

  • Soh, In Chul
    • Architectural research
    • /
    • v.8 no.2
    • /
    • pp.1-10
    • /
    • 2006
  • This research has acquired preliminary information about the existing conditions and understanding of members regarding time management for members in the architectural field. The goal of this research is to construct a basis for the time management education framework in architectural field in the future. This research mainly focuses on following questions based on limited objectives: Do groups of academics and professionals have understanding and knowledge of time management? Can the level of an individual's scheduling techniques be correlated to the patterns of knowledge and understanding of time management principles and practices? Can the time management practice status in individual's working environment be correlated to the patterns of knowledge and understanding of time management principles and practices? Can an individual's self-confidence level be correlated to the patterns of knowledge and understanding of time management principles and practices? Data have been collected through comprehensive questionnaires given to academics and professionals in United States. By means of statistical analysis, the hidden patterns, deficiencies and relationships in attitudes about time management have been revealed. The statistical analysis has produced conclusions that, among several subdivisions, self-discipline and planning have strong relationships and confidence, personal organization, control, and information gathering subdivisions have certain relationships with objectives of time management education in this research.

Validity Evaluation of Scale Model Experiments in Architectural Daylighting Performance (자연채광 성능평가에 있어서 축소모형실험 방법론의 유용성 검증에 관한 연구)

  • Kim, J.T.;Chung, Y.G.;Jeong, I.Y.;Hwang, M.K.
    • Journal of the Korean Solar Energy Society
    • /
    • v.22 no.2
    • /
    • pp.61-69
    • /
    • 2002
  • Daylighting is a powerful vehicle of architectural expression and provides buildings a living quality due to constantly changing properties in intensity and color. As an environmental system, daylighting should be subjected to the same level of rigorous analysis and review that any environmental system receives. For example, increasing cooling loads and causing visual displeasure are easily occurred owing to the excessive sunlight through windows. Therefore, daylighting performance attributes and physical characteristics must be described qualitatively and quantitatively in early design process. In various architectural daylighting performance evaluation methods, the scale model experiment can be applied due to it's simplicity and usefulness. So, this study aims to evaluate the validation of scale model experiments in architectural daylighting performance. For the purpose, two scale model experiments under clear sky are conducted. And, the validation of the experiments are evaluated by computer simulations.

A STUDY ON THE LEVEL OF DEVELOPMENT OF BUILDING INFORMATION MODELING DESIGN PROCESS

  • Khil Chae Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.23-30
    • /
    • 2011
  • The people in the AEC industry have acknowledged and long struggled to solve the critical low productivity issue of the entire construction industry. Integrated Project Delivery has been suggested as a solution to this problem and to take this into practice many countries have come up with BIM guidelines. In order to make this a success, BIM design process and LOD must be dealt in advance. The following research has selected 3 out of 16 guidelines that specifically describes BIM process and LOD, and intends to fully acknowledge its concept by comparing the approach and definition of LOD in the BIM Design Process.

  • PDF

An Design of Analyzing Process by Construction Extension of Time (공기연장 분쟁의 공사기간 분석 프로세스 설계에 관한 연구)

  • Kim, Beop-su;Seong, Gi-gang;Bae, In-ho;Bang, Hong-soon;Choi, Hyeong-jin;Kim, Ok-kyue
    • Korean Journal of Construction Engineering and Management
    • /
    • v.20 no.4
    • /
    • pp.104-113
    • /
    • 2019
  • Construction dispute about Extension of Time are complexly intertwined with various issues. The duration delay analysis defines the impact the issue has on the duration variation. And The international court and the arbitrator use the results of the analysis as a basis for reasonable duration judging. However, most of the domestic Construction sites have not established a business process for Extension of Time litigation. Therefore, Analysis data are collected after the occurrence of the dispute, there is not enough basic data of analysis almost. This study sought to improve the management efficiency by organizing information requirement for delay analysis and suggesting a reasonable business process. As a result of applying the proposed process to actual construction duration extension disputes, about 33% of practitioners, 46% of contractors, and 48% of legal advisors were satisfied with the process application site And Matrix validation was 91% identical. This study suggests that it is possible to increase the efficiency of the construction duration analysis work used as a basis in the construction dispute. Finally, the Computer based system design for this process should continue in the future.

Factory Production Management of Modular Units Using MFD 2019 (MFD 2019를 활용한 모듈러 유닛의 공장생산 관리)

  • Lee, Doo-Yong;Nam, Sung-Hoon;Lee, Jae-Sub;Jung, Dam-I;Kim, Kyoung-rai;Cho, Bong-Ho
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.6
    • /
    • pp.139-146
    • /
    • 2019
  • The modular building system is a type of prefabricated construction method, and is an industrialized building system that transports, assembles, and completes a three-dimensional module manufactured in a factory to the site. The economics of a modular building system where 50 to 80% of the entire process takes place in a modular factory is dominated by productivity of the factory manufacturing process. Since the building of the module is finished by the combination of unit parts produced by each material, it is necessary to manage the process in each module unit. However, currently marketed process control programs do not reflect the features of these modular methods. In this paper, we introduce Modular Factory Design software(MFD 2019) that can make modular unit production plan which reflects production base(modular factory) and production target(application and number of modular units). In order to verify software compatibility and reliability, two production plans with different production methods were formulated and simulated.

A Prototyping Method for Kinect Facade Design: Focusing on the Role of BIM and the Interaction between Digital and Analog Models (프로토타이핑 기법에 의한 키네틱 외피의 설계: 디지털-아날로그 모델의 상호작용과 BIM의 역할을 중심으로)

  • Kim, Do-Young;Kim, Sung-Ah
    • Journal of KIBIM
    • /
    • v.5 no.1
    • /
    • pp.16-24
    • /
    • 2015
  • The kinetic façade system is an interactive building envelope which is adaptive to environmental condition by transforming the behaviour of its components. The design process of kinetic façade system calls for a novel approach. It needs to support designers to adopt technologies from multidisciplinary fields such as physical computing and robotics. In this paper, prototyping method is introduced as a useful technique for implementing kinetic façade systems. In order to incorporate prototyping method into architectural design process, two aspects are investigated in digital design studio: (1) The interactions between digital and analogue environments (2) The role of traditional design tools. Furthermore, the role of BIM is investigated by analyzing two aspects.

A Study on the Architectural Characteristics of Lobby in the 5-Star Beijing Hotel in China - Focusing on the Business hotels from 1978 until 2008 - (중국 북경시 5성급 호텔 로비의 공간구성 특성에 관한 연구 - 1978년부터 2008년까지의 비즈니스호텔을 중심으로 -)

  • Gao, Yong;Kim, Hwan-Sik;Lee, Jeong-Soo
    • Korean Institute of Interior Design Journal
    • /
    • v.19 no.5
    • /
    • pp.156-164
    • /
    • 2010
  • This study examines for the making a deduction of architectural characteristics of high-rise business hotel's lower public space through analyzing the lobby space composition through Beijjng's 21 cases constructed from 1978 until 2008 in China. In the methods of analyzing process, We study the literatures, research reports and architectural drawings including the site survey. We hope to establish the principle in public space composition of Beijing's business hotels through analyzing the plan of these hotels. Finally, We find out the principles after researching as follows. Firstly, duration of business hotel construction was concentrated with the center of Beijing City especially central 5 Gu which will roll. To 1990's after that the high-rise hotel construction increased in order for the demand of the resort and the convention hotel to come to be many. The modem style was increased in hotel design of building's style. Secondly, the result which analyzes an 21 case study shows concourse style of public space composition is representative in lobby space of general 5 star business hotel in Beijing. And there are many upper composition style in sectional plan, modern style in lobby interior design. The third, the medium and small sized hotel have the plane which apply the public space efficiently.

A Study on Improvement of Architectural Design Process on the Interface in Designing of Power Plant (발전플랜트 설계 인터페이스 중심의 건축설계절차 개선에 관한 연구)

  • Lee, Gang-Ok;Kim, Da-Hee
    • Journal of the Korean Society of Industry Convergence
    • /
    • v.23 no.1
    • /
    • pp.9-15
    • /
    • 2020
  • The cooperation with other work types and designing procedure in plant industry and engineering showed clear differences from general construction industries. Current problems are that design's consistency is reduced because of the false system of interface and it ultimately causes frequency changes of design and delayed submission of final book. To solve the problems, the improvements of designing procedure were studied by focusing on the field of architectural designing and the range was limited from power plant construction industry to engineering designing field. If combining GA with the field of architectural designing and receiving data previously, it's possible to conduct expectable designing on small changes in the future, so it's expected to improve greatly cooperation with interface among the work types of power plant engineering received previously from the aspect of consistency. For the application of designing tool, a checklist, interim check will be conducted if progressed by list's division in the designing procedure, not book's completing period. In the interface among the designing work types, direct confirmation and revision must be conducted. In case of 3D modeling, the reflection of input data must be conducted from the basic designing so as to solve interferences intensively.