• Title/Summary/Keyword: apartment project

Search Result 339, Processing Time 0.026 seconds

Approach of establishing As-Is BIM Model Process in Apartment Remodeling project using 3D Laser Scanning. (공동주택 리모델링 사업에서 3D 레이저스캐닝 기술을 활용한 기존 구조체 As-Is BIM모델 구축 프로세스 제안)

  • Park, Ji-Eun;Yu, Jung-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.183-184
    • /
    • 2015
  • More than 50% of the existing buildings in Korea are over 15 years old. Therefore it is necessary to be held reconstruction or remodeling deteriorated buildings more efficiently. Especially, since remodeling project reserves existing structures, it requires less period of project and construction period compare to reconstruction. It is possible to minimize uncertainty in communication between participants and able to manage information and construct efficiently in remodeling projects. This paper is first step of integrated BIM-based whole lifecyle management of apartment remodeling process. It suggests 3D laser scanner specification factors and site constraint factors for mapping between two groups. Therefore it will contribute to develop mapping algorithm of two groups and find optimal combination for apartment remodeling.

  • PDF

Investigating the Impact of Project Management on Construction Defects in Housing Projects: With a Focus on Project Manager Experience (프로젝트 관리가 공동주택 건설의 하자 발생에 미치는 영향: 프로젝트 매니저 경험의 조절효과를 중심으로)

  • Young-Jun Lee;Seung-Chul Kim;Minjeong Oh;Sungyong Choi
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.209-220
    • /
    • 2023
  • Recently, defects that occurred during the construction of apartment houses have become a social issue. Defects in apartment houses lead to waste of resources and economic loss, causing psychological and physical damage to customers, and a decrease in reliability and financial loss to construction companies. The purpose of this study was to analyze the impact of defect occurrence according to the difference in project management level in the apartment housing construction stage, and to investigate the extent to which the project manager's experience affects the defect occurrence rate. For the empirical analysis of the study, statistical analysis was conducted using data collected from 130 actual projects. The results of the analysis showed that schedule management, cost management, and quality management had a positive effect on reducing the defect occurrence rate in the execution stage of apartment housing construction, while human resource management productivity had a negative effect. This study theoretically demonstrated the importance of project management, and in practice, showed that schedule management, cost management, and quality management should be faithfully performed in the execution stage to reduce the rate of defects after project completion. It was also suggested that hiring an experienced project manager would help reduce project defects.

A study on the effectiveness of Senior living environmental improvement through remodeling of old apartment complex (노후 임대아파트단지 리모델링을 통한 노인거주환경개선효과에 관한 연구)

  • Kwon, Soonjung;Kang, Hyojin;Oh, Ga Young;Kim, Seok Jun
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.4
    • /
    • pp.93-104
    • /
    • 2017
  • Purpose: Korean society has already entered an aged society but there aren't many evidence-based studies on the elderly-friendly design elements in the apartment environment, which is the main residential type in Korea. The main purpose of this study is to verify the necessity and expandability of the outdoor environment design in the public rental apartment complex through the evaluation of the effectiveness and satisfaction of SMG(Seoul Metropolitan Government) Cognitive Health Design Project in GR 1 apartment complex. Methods: The research subjects were GR 1-complex as experimental group and the nearby Wolgye Deer 1-complex as control group, both public rental apartment and located in Seoul. As a research method, the survey was conducted before and after the implementation of SMG project for residents of the apartment. A total of 200 preliminary surveys and 203 post surveys were conducted. Results: As a result of this study, residents' accidents related safety have decreased, and both the frequency of use and satisfaction of most facilities have increased. It is noteworthy that the increase in cognitive items in the post-survey. Also, 74.5% of the residents evaluated that the complex was better to live after the project was implement. Implications: The fact that the preliminary surveys were not conducted for the same person is considered as the limitation of the study, but it is meaningful in that it systematically assesses the effectiveness of the project on the cognitive health of the outdoor residential environment towards age-friendly city.

A Study on the Evaluation Criteria for Feasibility Analysis of Apartment House Development Project (공동주택 개발사업 타당성 평가항목에 관한 연구)

  • Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.1
    • /
    • pp.102-113
    • /
    • 2009
  • When planning and promoting apartment house development project, it is very important to carry on profitability in planning stage through realistic evaluation and analysis about distributability. Especially, the analysis about project feasibility through forecasting the early distribute rate is crucial stage because it could evaluate overall expecting benefit and feasibility of the project. However, researches and studies related with forecasting profitability and distributabilty of construction development project are insufficient. Also there is a big gap of the standard for evaluating early distribute rate between government and individual corporations. So it is necessary to study about the evaluating early distribute rate. In this point, this study aims to present effective evaluating standard(criteria) which is for forecasting profitability and distribute rate through analyzing various factors and weight of apartment house development projects. This study compared and analyzed examples of the real initial rate of private apartment sale based on the government estimated standard. Among estimated index, omitted items and factors to be additionally considered are combined as 33 detail appraisal contents of 4 parts 9 items by allotting them based on the data about priority of all considered factors.

A Study on the CM Application to the Apartment Reconstruction Project - Focused on the CM Work Scope in the Reconstruction Project - (공동주택 재건축사업의 건설사업관리 적용방안에 관한 연구)

  • Kim Kwan-Whae;Yoo Moung Nam;Seo Jae-Woong;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.251-256
    • /
    • 2001
  • After the late 70's, the apartment housing have been constructed numerously, but the apartment housing has been deteriorated and the maintenance cost has been increasingly upward as time goes by. Because of that, the reconstruction of the apartment housing is widespread in the late 90's. But as the owner, the congregation, is not an expert, there are many problems in the reconstruction projects. Thus, the necessity of the CM in the reconstruction project is getting higher, but the appropriate method for the application of the CM is not established yet. In this study, the CM work scope that is applicable in the reconstruction project is developed through the inquiry and interview to the experts. Especially, The work scope developed in this study is established to be adapted easily in the practical use for each project phase.

  • PDF

A Study on the Changes of the Apartment price in Accordance with Project process of Super high-rise mixed use buildings (초고층 주상복합 건물의 개발사업 단계에 따른 주변지역 아파트가격의 변화에 관한 연구)

  • Kim, Sang Hwan;Choy, Won Cheol;Kim, Ju Hyung;Kim, Jae Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.159-164
    • /
    • 2010
  • High-rising buildings are a sort of solution to recent cities. Till now real estate development was concentrated in new development on vacant lots, and it resulted urban sprawl. Generally large cities are confronted with the exodus of industry and population from city. High-rising buildings solve many problems associated with this problem. The purpose of this research is to identify the effect of super high-rise mixed use building project process on apartment price. For this study, the hypothesis is that price of apartments is influenced by project process of super high-rise mixed use building. The study concerned 4 variations of project process that is building permits stage, sale stage, construction starting stage and stage of moving into building. The target projects of buildings are selected by number of floor(over 40 floors) and construction time. And 48 apartment complex are selected around super high-rise mixed use building. This study uses hedonic price function to analysis effect of project process of super high-rise mixed use building. A price of apartments is defined as a dependent variable. Characteristics of residence, complex, district and super high-rise building are defined as independent variables. The results are as follows; first, there is no error in price model of this study. Second, it is found that apartment price was influenced negatively by building permit stage and sale stage of super high-rise mixed use building. But that was influenced positively by construction starting stage and stage of moving into building of that. Third, as the project process of super high-rise mixed use building was proceeded, price of apartments was increased.

Influence Factors of Aerial Environment on Project Schedule Management

  • Hong, Jun-pyo;Lim, Hyoung-chul
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.608-611
    • /
    • 2015
  • The objectives of this research are 1) control of schedule or improvement of management for aerial environment, 2) distribution of responsibility to the parties concerned (factory, material company, construction company, design and engineering, occupancy). The results show the relative priority of the four major items in wall-based apartment buildings and in column-based apartment buildings. An analysis of the parties responsible for improvement based on the IAQ results shows more efforts to improve IAQ are needed in material factories and engineering/design companies.

  • PDF

A Planning Model for Apartment Development Project Reflecting Client Requirements (고객 요구사항을 반영한 아파트 개발 사업 기획 모델)

  • Kim Yoo-Shin;Oh Ye-Keun;Kim Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.88-96
    • /
    • 2004
  • Recently, client requirements concept is an important issue related to many effects of firms. Especially, if we think that apartment is given a great deal of national construction industry, it is requested that we should try to improve apartment quality with various methods of client requirements survey and reflecting those on apartment project. The technique searching and applying client requirements to apartment project is requested for that and ROQ(Return On Quality) process connected to QFD(Quality Function Deployment) is a technique which is used in manufacturing industry and help to make money by rising client satisfaction with searching clients requirements, and applying this to quality improvement program. In this study apartment quality management development is suggested through using ROQ process. For this customer interview research and FGI(Focus Group Interview) was carried out and clients requirement was analyzed with this. Then quality improvement program applicable to developing a new apartment product was established with specialist monitoring. A new apartment quality management development plan is prosed with this process.

A Study on the Risk Evaluation of Apartment Development Project based on VE (VE기반 공동주택 개발사업 리스크 평가에 관한 연구)

  • Lee, Hyun-Chul;Shin, Seog-Bae;Hong, Ju-Hyun;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.4
    • /
    • pp.14-25
    • /
    • 2009
  • Development work of apartment houses is a complex medium-and long-term project requiring grand resources and work force. Since in combination inner and outer project variables relate to project output, uncertainties caused by not only a given site condition but also politic, economy and social sectors are generated during the project. These risks influence output of the project as important factors, and ultimately as management variables in priority giving an effect on earnings and the financial structure of enterprises they should be manageable with the risk reduction plan. In this point of view, this study focused on development work of apartment houses among construction project. Risky factors were deduced, analyzed and evaluated based on Value Engineering from planning to designing to executing to maintaining. Eventually, this study showed the foundation guaranteeing competitive power of public and private construction sectors.

A Study on The Conflict Management for Apartment Reconstruction Project (공동주택 재건축사업의 갈등관리에 관한 연구)

  • Lee, Ro-Na;Lee, Hak-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.467-470
    • /
    • 2008
  • Apartment Reconstruction project causes lots of conflicts among stakeholders who don't have professional knowledge on a complicated work-flow In case these conflicts occur, the project might not be well by the damage passed to parties, and so the project cost might be increased, the project might be delayed and hazy as well if the conflicts are not resolved quickly. However, the damage would be indirectly and directly brought to the main parties in apartment reconstruction project because the conflicts aren't managed. Thus, an effective conflict assessment should be preceded, and a process and a system for managing the conflicts should be developed to prevent and settle the conflicts. The purpose of this study classifies the conflicts which are occurred on each phase of the project based on principal facts, and presents the process to develop conflict management system through conflict assessment to each stakeholder.

  • PDF