• Title/Summary/Keyword: apartment construction cost

Search Result 299, Processing Time 0.031 seconds

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city - (BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -)

  • Lee, Hae-Chan;Kim, Jin-Man;Choi, Cheol-Ho;Song, Sang-Hoon
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.11-20
    • /
    • 2017
  • BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

Analysis of Construction Safety Management and Execution Tasks for Performance Improvement (건설공사 안전관리 및 시공 업무의 중요도 분석에 관한 연구)

  • Kang, Sang-Hun;Kim, Dae Young
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.11a
    • /
    • pp.130-131
    • /
    • 2018
  • The main purpose of this study is to analyze the importance of the construction work of apartment buildings. The construction work operation was divided into five major tasks, which include: Schedule Control (P'1 - P5) Construction Management (C'1 - C'5), Environmental Management (E'1 - E'3), and Quality Management. Finally, this study derived major construction execution tasks through correlation between construction work and the original index and t-test.

  • PDF

A Study on the Investigation Technique for Deterioration State of Window·Door and Tile of Apartment Houses (공동주택 창호 및 타일의 열화상태 조사기법에 관한 연구)

  • Lee, Jung-Hun;Bae, Kee-Sun;Lee, Seong-Bok;Oh, Sang-Keun;Choi, Soo-Kyung;Seo, Chi-Ho
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.05a
    • /
    • pp.27-30
    • /
    • 2011
  • Analysis data of basics which are used for LCC(Life Cycle Cost) analysis of buildings and maintenance plan, are demanded to secure according as replacement cycle of repairs of apartment houses has come. However, investigation techniques and systems for investigating condition of deterioration of apartment houses, have not been made yet in Korea. For this reason, this study was wanted to make investigation techniques and systems, so the process for maintenance of apartment houses was researched and the required quality and deterioration factors of interior/exterior materials were investigated. As a result Check-List for investigating condition of deterioration, was made. if this is used during a nonscheduled, a routine, a regular and a urgency check, the methodical investigation will be achieved. Furthermore, if this is used for maintenance of apartment houses, it will be helped to select the repair cycle and the long-term repair plan.

  • PDF

A Study on the Flaw Prevention Countermeasure of Crack in Apartment House Underground Parking Area (아파트 지하주차장의 균열방지 대책 - 현장사례조사를 중심으로 -)

  • Jung Soon-Oh;Suh Sang-Wook
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.1 s.9
    • /
    • pp.115-123
    • /
    • 2002
  • Recently all basement floor of apartment site have utilized as parking area to use efficiently space and to ensure lawful parking car figure. And the top of parking area has used as working vehicle's path and materials' carrying area during construction. Thus because crack and leakage status in underground parking area of under construction or completion building generate excessively not only performance of structure is diminished but also flaw repair cost is put in a lot of. And abroad confidence is diminish. So this study is intended to diminish flaw focus on investigation of under construction and completion fields through examine closely cause of crack and leakage status of apartment house underground parking area and prepare countermeasure with respect to design, construction and maintenance.

Cost Estimating in Early Stage Using Parametric Method for Apartment Construction Projects (파라메트릭 방법(Parametric Method)을 이용한 사업초기 단계의 공사비 예측 방법)

  • Seong, Ki-Hoon;Park, Mun-Seo;Lee, Hyun-Su;Ji, Sae-Hyun
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.207-211
    • /
    • 2008
  • The importance of cost management in early stage has been increasing due to market change and competition severence in construction industry. Because the adjustable budget is only 20% after finishing design stage, the critical decision is made in the early stage. However, in the early stage, the design information is not enough to make crucial decision. Therefore, this research suggests the predicting method on the purpose of accurate cost estimation. The parametric estimation is appropriate for the early stage, especially it has the strength of rapidity in cost estimation. This research analyzes 84 actual data of public apartment on the scale of $11{\sim}15$ stories, and then performs the correlation analysis between cost and influence factors. After eliminating the parameters which causes the problem of multicollinearity, this research derived the formula through the multi-regression analysis.

  • PDF

A Study of the law-suit requesting the guarantee against defects in the Apartment Buildings (공동주택 하자보증금 청구소송의 연구)

  • Yoon, Hyung-In;Jo, Byung-Soo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.7 no.2 s.24
    • /
    • pp.67-76
    • /
    • 2007
  • The purpose of this study is to propose the efficient improvement in the lawsuit to request the guarantee against defect. This study points out several problems about related act and subordinate statue and judgement by analyzing the character of contract in apartment house, related laws and regulations, appraisals and judicial decisions. This study deduces the necessity of the establishment of the specification and the breakdown cost for repair and maintenance work to provide the standard for the detached judgement.

A Study on the Effective Inventory Management by Optimizing Lot Size in Building Construction (건설공사의 적정 Lot Size 결정에 의한 효율적인 재고관리 방안에 관한 연구)

  • Kim, Sang-Hoon;Kim, Gwang-Hee;Kang, Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.4 no.2
    • /
    • pp.73-80
    • /
    • 2004
  • The purpose of this study was to look up the proper inventory management system in construction industry. it is important for construction company to improve competitiveness and to reduce construction cost. Lot-sizing techniques were applied to rebar procurement in apartment project. The results of this study were as follows; the method of Groff's marginal cost showed the best performance of other techniques and the method of Norman showed a similar result.

A Cost-Based Interior Information Management for an Apartment Housing Project (원가기반의 공동주택 마감재 정보관리 방안 연구)

  • Lee, Hoon-Ku;Lee, Yoon-Sun;Moon, Hyuk;Kim, Jae-Jun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.5
    • /
    • pp.76-84
    • /
    • 2009
  • Korea's construction industry experienced no difficulty managing the costs of finishing work items in the apartment housing field thanks to the uniform specification and the standardized costs of finishing work items. Finishing work items have continuously become more high class and differentiated, which has caused the costs of finishing work items to rise. This study identified problems with the cost management when planning finishing work items and choosing their alternatives based on the current process applied to the planning stage of finishing work items. It also found problems with the information management of finishing work items including design, cost, and work information that took place in bulk. Based on the identified problems, the design, cost and work information of finishing work items was integrated so that they could management the costs and information when planning finishing work items and selecting their alternatives. Then a cost-based information management process was suggested for finishing work items by improving each of the project cost management elements. Finally, an information model for finishing work items was built by studying the ways to integrate the information hierarchy and library of finishing work items.

A Comparative Analysis of Status on the Selection and Evaluation of Field Manager in Apartment and Office Building Project (공동주택과 오피스 건설현장의 조직원선정 및 평가실태 비교분석)

  • Lee Jung-Yong;Kim Byeong-Lae;Son Chang-Baek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.290-293
    • /
    • 2003
  • The field organization management in construction industry is very important factor improvement and cost reduction. But, until now, evaluation methods on the existing field organization did not make ready and endeavor of organization betterment was insufficient in construction industry. The purpose of this study to provide basic data for reasonable selection and evaluation of the field manager through analyzing operation status of the existing field organization in apartment and office building project by interview and questionnaire on the 22 construction companies. This study presented optimal proposal on the selection and evalution of field manager for productivity improvement and cost reduction by means of efficient construction progress in apartment and dffice building project.

  • PDF

A Study on the Construction Cost Risk through Analyzing the Actual Cost of Public Apartment (공공주택 실적공사비 분석을 통한 공사비 리스크에 관한 연구)

  • Yoon, Woo-Sung;Go, Seong-Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.12 no.6
    • /
    • pp.65-78
    • /
    • 2011
  • Construction business, which is complex and long-term business, requires accurate estimation and verification in construction costs and payment procedure from project planning to the completion of construction phase. And more importantly, it is necessary to investigate and determine the risk factors related to construction costs during the entire process including design planning, construction drawings, and quantity calculating. But, currently, it is not seem to be adequate to cope with the risk and increased construction costs against the operational budget in terms of actual costs when screening and estimating the bidding cost of public apartment. Therefore, this study selected and analyzed 40 sites' report of construction completion account from 2004 to 2010 focused on the adequacy on the modification of contract and design planning and on the complication of the budget in the beginning of the project. This study deducted various risk causes and results by analyzing actual costs according to year, architectural area, region, construction cost and sale/lease classification. We could find out construction risk according to annual variation of government policy and economy, and also deducted risk items by construction characteristic according to region and architectural area. Study result, we first found out the problems of lowest price award system according to the construction costs. The weight of the cost increase risk was analyzed that subcontract and material costs are very high. Roof and tile work were analyzed highly in subcontract cost risk and reinforcing bar and cement were analyzed highly in material cost risk, among direct construction cost. Finally, this study results could be used in comparing the categories of the construction costs made by specific construction process, belonging to the construction costs, with the operational budget made in the beginning of the project that can enable to grasp unpredictable risks over the construction costs and making quantitative analysis for it through analyzing the range of fluctuation and variations led by the fluctuations in the actual construction costs.