Abstract
Recently all basement floor of apartment site have utilized as parking area to use efficiently space and to ensure lawful parking car figure. And the top of parking area has used as working vehicle's path and materials' carrying area during construction. Thus because crack and leakage status in underground parking area of under construction or completion building generate excessively not only performance of structure is diminished but also flaw repair cost is put in a lot of. And abroad confidence is diminish. So this study is intended to diminish flaw focus on investigation of under construction and completion fields through examine closely cause of crack and leakage status of apartment house underground parking area and prepare countermeasure with respect to design, construction and maintenance.
공간의 효율적 이용 및 법정 주차대수 확보 등으로 아파트 단지의 지하층은 대부분 지하주차장으로 활용되고 있으며, 주차장상부도 시공 중에 성토 및 포장공사가 완성되지 않은 상태에서 작업차량의 통로 및 자재 야적장으로 사용되고 있어 과하중이 작용되고 있는 실정이다. 그러므로 시공중이거나 완공된 지하구조물에서 지속적으로 균열 및 누수현상이 발생하여 구조물의 성능저하는 물론 많은 금액의 하자보수비 투입, 민원유발 및 대외적인 신뢰도 저하 등 많은 문제점이 발생하고 있다. 따라서 본 연구의 목적은 시공중인 아파트와 준공된 아파트 지하주차장을 대상으로 현장조사를 실시하고, 그동안 실시한 안전진단 사례를 참고하여 아파트 지하주차장의 균열 및 누수현상 원인을 파악하고 그에 따른 설계 및 시공상의 방지대책을 마련하는데 있다.