References
- Bae, S. J., Suh, B. G., Yun, S. H. (2013). A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique, Proceedings of Conference for The Korea Institute of Building Construction, 13(2), pp. 92-93.
- Cho, Y. S., Suh, B. G., Yun, S. H. (2015). Development of BIM Based Estimation Prototype System Using Building Elements Combination Database, Journal of the Architectural Institute of Korea Structure & Construction, 31(3), pp. 45-52. https://doi.org/10.5659/JAIK_SC.2015.31.3.45
- Choi, C. H., Park, Y. J., Han, S. H., Chin, S. Y. (2006). Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system, Proceedings of Conference for Korea Institute of Construction Engineering and Management, 2006-11, pp. 154-160.
- Franco K.T. Cheung, Jonathan Rihan, Joseph Tah, David Duce, Esra Kurul(2012). Early stage multi-level cost estimation for schematic BIM models, Automation in Construction, 27, pp. 67-77. https://doi.org/10.1016/j.autcon.2012.05.008
- Jun, K. H., Yun, S. H. (2012). Preliminary Study on the Construction of Database for BIM-based preliminary estimate, Proceedings of Conference for The Korea Institute of Building Construction, 12(2), pp. 292-293.
- Jun, Y. J., Park, D. Y., Kim, J. H., Kim, J. J. (2010). A study on Estimating Process of Conceptual Cost based on BIM at the Early Stage of Construction Project, CESEIK Annual Conference, 23(1), pp. 218-221.
- Kim, H. J., Choi, J. S., Kim, H. S., Kim, I. H. (2013). The Development of Data Model for Open BIM-Based Schematic Estimates, Journal of the Architectural Institute of Korea Planning & Design, 29(3), pp. 61-70. https://doi.org/10.5659/JAIK_PD.2013.29.3.61
- Kim, S. A., Park, G., Song, B. S., Choi, C. H., Chin, S. Y. (2016). A Study on the Development of a Automated Modeling System to Improve Productivity of BIMbased Quantity Take-Off, Korea Journal of Construction Engineering and Management, 17(1), pp. 56-65. https://doi.org/10.6106/KJCEM.2016.17.1.056
- Kim, Y. J., Kim, S. A., Chin, S. Y. (2012). A Study of BIM based estimation Modeling data reliability improvement, Korea Journal of Construction Engineering and Management, 13(3), pp. 43-55. https://doi.org/10.6106/KJCEM.2012.13.3.043
- Park, Y. J., Won, S. K., Han, C. H., Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural Institute of Korea Structure & Construction, 27(6), pp. 123.
- Song, S. H., Lee, D. G., Park, J. Y. (2016). Requirement of Detailed Design BIM Model Considering Cost Estimation for Apartment Construction in Public Sector, Proceedings of Conference for The Architectural Institute of Korea, 36(2), pp. 1612-1613.
- Yang, H. C., Lim, J. K., Lee, J. W. (2016). Implementation of BIM-based Approximate Estimate System Considering Life-Cycle Cost, Journal of KIBIM, 6(1), pp. 133-134.
- Yoon, M. C. (2013). A BIM-Based Architectural Model Takes Advantage of the Estimate Model Process, Journal of the Architectural Institute of Korea Planning & Design, 29(9), pp. 95-102. https://doi.org/10.5659/JAIK_PD.2013.29.9.95
- Yoon, M. C. (2013). Architectural Design Considering the Composed Unit Cost of BIM Rough Estimation Research, Journal of the Architectural Institute of Korea Planning & Design, 29(10), pp. 131-140. https://doi.org/10.5659/JAIK_PD.2013.29.10.131
Cited by
- 공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 vol.11, pp.2, 2017, https://doi.org/10.13161/kibim.2021.11.2.001