DOI QR코드

DOI QR Code

BIM-based cost estimation by integration with BIM mdel data and cost information - Case Study on Economy Evaluation of Apartment in Sejong Special Self-Governing city -

BIM 기반 견적 산출을 위한 공종별 BIM 데이터 구축 및 연계 방안 - 세종특별자치시 공동주택 경제성 평가 사례 연구 -

  • Received : 2017.09.08
  • Accepted : 2017.09.13
  • Published : 2017.09.30

Abstract

BIM technology, which is widely used in the construction industry, has been introduced in various fields for the purpose of saving construction cost and reducing construction schedule. However, in the case of BIM-based cost estimate, there are various trials and errors in applying BIM technology which can be applied for calculating quantity and cost estimate. BIM-based cost estimate can improve the quantity accuracy and allow to easy modifications that were not expected in 2D-based construction process. However, for this purpose, it is necessary to take into consideration that interoperability between BIM data and cost information should be planed in advance. Besides, the definition of a BIM data specification is also required for the seamless data exchange and integrity in each phase of the construction process. Therefore, in this study, we propose a BIM - based cost estimation method and technology in each type of work applicable to the current domestic construction industry.

Keywords

References

  1. Bae, S. J., Suh, B. G., Yun, S. H. (2013). A study on the development of the construction project for the preliminary estimate based on a database of the BIM technique, Proceedings of Conference for The Korea Institute of Building Construction, 13(2), pp. 92-93.
  2. Cho, Y. S., Suh, B. G., Yun, S. H. (2015). Development of BIM Based Estimation Prototype System Using Building Elements Combination Database, Journal of the Architectural Institute of Korea Structure & Construction, 31(3), pp. 45-52. https://doi.org/10.5659/JAIK_SC.2015.31.3.45
  3. Choi, C. H., Park, Y. J., Han, S. H., Chin, S. Y. (2006). Recipe-based estimation system for 5D(3D + Cost + Schedule) CAD system, Proceedings of Conference for Korea Institute of Construction Engineering and Management, 2006-11, pp. 154-160.
  4. Franco K.T. Cheung, Jonathan Rihan, Joseph Tah, David Duce, Esra Kurul(2012). Early stage multi-level cost estimation for schematic BIM models, Automation in Construction, 27, pp. 67-77. https://doi.org/10.1016/j.autcon.2012.05.008
  5. Jun, K. H., Yun, S. H. (2012). Preliminary Study on the Construction of Database for BIM-based preliminary estimate, Proceedings of Conference for The Korea Institute of Building Construction, 12(2), pp. 292-293.
  6. Jun, Y. J., Park, D. Y., Kim, J. H., Kim, J. J. (2010). A study on Estimating Process of Conceptual Cost based on BIM at the Early Stage of Construction Project, CESEIK Annual Conference, 23(1), pp. 218-221.
  7. Kim, H. J., Choi, J. S., Kim, H. S., Kim, I. H. (2013). The Development of Data Model for Open BIM-Based Schematic Estimates, Journal of the Architectural Institute of Korea Planning & Design, 29(3), pp. 61-70. https://doi.org/10.5659/JAIK_PD.2013.29.3.61
  8. Kim, S. A., Park, G., Song, B. S., Choi, C. H., Chin, S. Y. (2016). A Study on the Development of a Automated Modeling System to Improve Productivity of BIMbased Quantity Take-Off, Korea Journal of Construction Engineering and Management, 17(1), pp. 56-65. https://doi.org/10.6106/KJCEM.2016.17.1.056
  9. Kim, Y. J., Kim, S. A., Chin, S. Y. (2012). A Study of BIM based estimation Modeling data reliability improvement, Korea Journal of Construction Engineering and Management, 13(3), pp. 43-55. https://doi.org/10.6106/KJCEM.2012.13.3.043
  10. Park, Y. J., Won, S. K., Han, C. H., Lee, J. B. (2011). A Study on 3D BIM Collaborative Approximate Estimating Model of Structural Work for Apartment Projects, Journal of the Architectural Institute of Korea Structure & Construction, 27(6), pp. 123.
  11. Song, S. H., Lee, D. G., Park, J. Y. (2016). Requirement of Detailed Design BIM Model Considering Cost Estimation for Apartment Construction in Public Sector, Proceedings of Conference for The Architectural Institute of Korea, 36(2), pp. 1612-1613.
  12. Yang, H. C., Lim, J. K., Lee, J. W. (2016). Implementation of BIM-based Approximate Estimate System Considering Life-Cycle Cost, Journal of KIBIM, 6(1), pp. 133-134.
  13. Yoon, M. C. (2013). A BIM-Based Architectural Model Takes Advantage of the Estimate Model Process, Journal of the Architectural Institute of Korea Planning & Design, 29(9), pp. 95-102. https://doi.org/10.5659/JAIK_PD.2013.29.9.95
  14. Yoon, M. C. (2013). Architectural Design Considering the Composed Unit Cost of BIM Rough Estimation Research, Journal of the Architectural Institute of Korea Planning & Design, 29(10), pp. 131-140. https://doi.org/10.5659/JAIK_PD.2013.29.10.131

Cited by

  1. 공동주택 프로젝트 비용일정통합 관리를 위한 BIM 기반 BoQ 구축 및 활용 방안 vol.11, pp.2, 2017, https://doi.org/10.13161/kibim.2021.11.2.001