• Title/Summary/Keyword: adjustment cost

Search Result 319, Processing Time 0.033 seconds

A Study on Recoverability of Opportunity Profits Loss upon Time-Delay in Construction Contract (건설공사의 공기지연과 기회이익의 손실보전에 관한 연구)

  • Chun Jae-Youl;Lee Kyung-Kook
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.359-364
    • /
    • 2003
  • The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.

  • PDF

Development of Low-Cost Data Acquisition Method for Close-range Digital Photogrammetric System (근거리 수치사진측량시스템을 위한 저가격 자료획득방법의 개발)

  • Park, Hong-Gi
    • Journal of Korean Society for Geospatial Information Science
    • /
    • v.7 no.2 s.14
    • /
    • pp.143-153
    • /
    • 1999
  • GIS have become easier to use and very popular. In recent year digital photogrammetric systems ire becoming cost-effective tools to build and update GIS databases. In close-range photogrammetry for the acquisition of geospatial data, the bundle adjustment needs both initial approximate values and control points to solve the exterior orientation parameters. This paper gives a review of applied and potential algorithms for estimating Initial approximate values before the bundle adjustment, develope new algorithms for determine the exterior orientation parameters, and gives a cost-effective methods for close-range digital photogrammetric system Modifications of existing DLT algorithm were made in this study for providing an efficient, economic, and more accurate photogrammetric data reduction technique. These modifications include robust approaches for automatic detection and elimination of all lands of gross errors in the measurement data, and incorporation of GPS to reduce the number of control points necessary for a DLT solution. Also, this paper derives a new method for space resection from a monocular image. A major advantage of proposed method is that the solution can be uniquely and analytically determined without initial approximate values of exterior orientation parameters and without iterative computation.

  • PDF

Development Strategies of The Hanwoo [Korean Native Cattle] Industry (한우산업의 발전전략)

  • Kim Jin Suk
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 1998.10a
    • /
    • pp.68-111
    • /
    • 1998
  • The structure of the Hanwoo (Korean Native Cattle) Industry remains very weak and vulnerable to the WTO/IMF system. Considering that the majority of cattle farmers are small sized, and that marketing systems are outdated and inefficient, rapid expansion of lower priced beef imports by WTO system and rapid increasing of production costs by IMF system would lead to the deprivation of a regular source of farm income and threaten the stability of rural life. Accordingly, the Hanwoo industry should be expanded in accordance with progress in the implementation of (1) programs for the structural adjustment and (2) measures to compensate for the loss. Efforts for lowering major production factor costs needs to continue, In order to increase the supply of calves at low cost, the programs of collective cow-calf farms should be expanded, thereby reducing the cost of calf purchase, which constitutes the largest share of Hanwoo production cost. Also, feedlot operations should be encouraged for small herd farms in order to achieve a substantial saving in beef production costs by integrated operations from calf production to cattle fattening. A substantial saving would also be made by collective purchase and distribution of various inputs through the cooperatives' channels. Extension services should be strengthened for cattle farm management, cattle care and feeding, prevention of cattle disease, etc. In order to minimize cash outlays for commercial mixed feeds, utilization of far by-products as feeds should be enhanced and production of forage crops productive of resources, such as land and rural labor, during the farm o(f-season, needs to be encouraged. Also, technological development for enhancing the nutritional value of farm by-products should be encouraged. Measures for successful segregation of the Hanwoo beef market should be implemented, thereby enhancing incentive for quality beef producers and protecting consumers willing to pay higher price for quality beef. For development of the Hanwoo industry, a considerable time frame would be required in order for (1) small livestock farmers to make a successful adjustment by staying in the enterprise and achieving increased price efficiency (2) livestock farmers to acquire know-how for producing quality Hanwoo beef, (3) the ongoing Government policy of enhancing price-quality competitiveness, and for improving the quality Hanwoo beef marketing to take root. (4) consumers to increase their ability to distinguish meat quality, and others.

  • PDF

Development of a Cost Index for Site Developing Project (단지조성공사용 공사비 지수의 개발)

  • Bae Keon;Lee Tai-Sik;Park Jong-Hyun;Lee Won-Yong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.423-426
    • /
    • 2002
  • The foundation for developing a cost estimation system based on historical data has been being prepared in Korea. Historical data is a priori of developing a cost estimation model. Cost Index, one of the historical data, is used to estimate construction cost and to adjust the amount of contract money in the foreign country, whereas it is not used in domestic except for the road construction project in Korea. Construction cost indices can be used by an estimator in tender analysis, pricing, price adjustment, cost planning, and forecasting. In this regards, this paper identified the problems in developing Cost Index evaluation process by comparing the standard of framing Cost Index used in British to the one used in Korea. Then, the scheme for improving a Cost Index required for Site Developing Construction was proposed. Twenty-two cases of engineering estimate data were used to compare the domestic standard to the foreign one in deriving a Cost Index.

  • PDF

An Improvement Plan of Contract Price Adjustment through the Problem Analysis of the Current Price Escalation Regulation in Construction Projects (현행 건설공사 물가변동 제도의 문제점 분석을 통한 계약금액조정 개선방안)

  • Park, Yang-Ho;Kown, Beom-Jun;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.435-439
    • /
    • 2006
  • The purposes of study is to propose a new method contract price adjustment in construction projects. The research method of this study includes a case analysis and questionnaire survey. The results of this study are as follows: 1) For improvement method of contract amount adjustment, enactment for legislation pertaining to computation methods such as military's organization through total unit cost, and price flexibility computation at the point of design modification were presented. 2) Arithmetic formulas for cases in which volume is deleted or modified below the price flexibility exemption amount or in which there is no change to quantity, at the occurrence of design modification resulting from price flexibility, were proposed.

  • PDF

A Study on the Analysis of Cost Adjustment Scenarios by Bidding Method through Analysis of the Total Project Cost Management Process (총사업비 관리 프로세스 분석을 통한 입·낙찰 방식별 공사비 조정 시나리오 분석 연구)

  • Kim, Kyeongbaek;Lee, Gayeoun;Kim, Sangbum
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.30-38
    • /
    • 2020
  • Inadequate cost management has widely been recognized as one of the most problematic areas in the Korean construction industry as many believes that public cost references are not reasonably reflecting the market conditions. 'Total Project Cost Management Guideline' developed by Ministry of Economy and Finance(MOEF) to govern public budget control has been identified as one of the main reasons for this problem. This study attempts to thoroughly review 'Total Project Cost Management Guideline' itself and quantitatively analyze the impact of it on project cost during procurement process. Different procurement methods are considered including turnkey & alternative, private contract, qualification examination, and lowest price bidding system in this quantitative impact analysis of 'Total Project Cost Management Guideline'. Analysis results shows that this governmental process works mainly as a constant cost-cutting tool throughout the procurement process.

The Effect of Corporate International Diversification on Cost Stickiness (기업의 국제다각화가 하방경직적인 원가행태에 미치는 영향)

  • Rhee, Chang Seop;Woo, So Hee;Rhee, Hyun Jung
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.9
    • /
    • pp.100-107
    • /
    • 2018
  • This study investigated the effect of corporate international diversification on cost stickiness. A cost behavior that indicates a lower rate of cost reduction when the volume of sales decreases than the rate of cost increase when the volume of sales is increased is called cost stickiness. This cost behavior is caused by decisions made by considering the adjusting costs of the manager, and for corporate international diversification, the decision making on the adjustment cost of the manager has been reduced by the offsetting accruals hypothesis. From the empirical results, we observed that the cost stickiness of international diversified companies decreases. It is expected to contribute to the capital market and academia by identifying whether corporate international diversification can have a significant impact on management decision making related to costs.

An Analysis of the Asymmetry of Domestic Gasoline Price Adjustment to the Crude Oil Price Changes: Using Quantile Autoregressive Distributed Lag Model (국제 유가에 대한 국내 휘발유의 가격 조정 분석: 분위수 자기회귀시차분포 모형을 사용하여)

  • Hyung-Gun Kim
    • Environmental and Resource Economics Review
    • /
    • v.31 no.4
    • /
    • pp.755-775
    • /
    • 2022
  • This study empirically analyzes that the asymmetry of domestic gasoline price adjustment to the crude oil price changes can vary depending on the level of gasoline price using quantile autoregressive distributed lag model. The data used are the weekly average Dubai price, domestic gasoline price at refiners and gas stations from the first week of May 2008 to the second week of October 2022. The study estimates three price transmission channels: changes in gas station gasoline prices in response to changes in Dubai oil prices, changes in refiners gasoline prices in response to changes in Dubai oil prices, and changes in gas station prices relative to refiners gasoline prices. As a result, the price adjustment of refiner's gasoline price with respect to Dubai oil price appears asymmetrically across all quantiles of gasoline price, whereas the adjustment of gas station prices for Dubai oil price and refiner's gasoline price tend to be more asymmetric as the quantile of gasoline price increases. Such a result is presumed to be due to changes in the inventory cost of gas stations. When the burden of inventory cost is high, gas stations have an incentive to more actively pass the increased buying price on their selling price.

Problems and Improvement Schemes to Historical Cost Fluctuation Ratio Calculation According to the Escalation (물가변동에 따른 실적공사비 등락률 산출의 문제점 및 개선방안)

  • Jeong, Ki-Chang;Kim, Young-Ai;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.540-545
    • /
    • 2008
  • The purpose of this study is to suggest problems and improving plan of process of calculating escalation rate of the Historical Cost by price fluctuation. In order to implement this research, we analyzed problems by calculating the rate of price fluctuation with Historical Cost and measurement applying method making on-site with historical cost data were included as samples and suggested improving plan to the adjustment of contract cost. The results of research according to this are same as followings:1) Of all construction details, it is more appropriate to calculate price fluctuation by applying measurement method to the contents of historical cost unit. 2) To avoid confusion in calculating method, it was indicated that amendment in part should be achieved in order to calculate by measuring the part of calculating escalation rate of Historical Cost at related law and regulation.

  • PDF

A Study on Policy for Actualizing the Development Cost Estimation Guidelines of e-Learning Contents in Era of Convergence (융합시대의 이러닝 콘텐츠 개발대가 산정기준의 실효성 제고 정책)

  • Noh, Kyoo-Sung;Han, Tae-In
    • Journal of Digital Convergence
    • /
    • v.13 no.9
    • /
    • pp.49-56
    • /
    • 2015
  • Korea government has established clear cost estimation standard based on a survey of e-learning contents development cost and presented 'e-Learning Contents Development Cost Estimation Guidelines' that reflect the characteristics of the e-learning industry. However, if there is no institutional support, this guideline and system fails to achieve the purposes and objectives. And it is likely to be facing a dead document. Therefore, the policy foundation is required. This study suggested the following policy; stepwise activation of cost estimation standard, enact announcement and periodically adjustment of cost estimation standard, installation and operation of cost estimation standard operational committee, conjunction with the e-learning industry survey, cultural diffusion of co-owned copyright, systematic monitoring of the e-learning contents development process, research on activating policy of cost estimation standard, conjunction with the standard contract for enhancing policy effectiveness.