Proceedings of the Korean Institute Of Construction Engineering and Management (한국건설관리학회:학술대회논문집)
- autumn
- /
- Pages.359-364
- /
- 2003
A Study on Recoverability of Opportunity Profits Loss upon Time-Delay in Construction Contract
건설공사의 공기지연과 기회이익의 손실보전에 관한 연구
Abstract
The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.
공기지연과 관련하여 발생하는 간접비(Markup)에 구성된 잠재적 기회이익부분이 계약금액의 조정에서 제한된 계약제도, 배상요건으로서의 법익침해 해석문제, 또는 회계의 비용으로서 인식되지 않음으로 인해 배상되지 않고 있다. 국내외적으로 회계기준은 발생주의, 법익의 개념상 손해배상의 범위를 주로 제한배상주의에 기하여 채택하고 있어 불법행위에 의한 후속적 특수손해인 기회이익의 직접상실손해는 채무로서 인정되지 않아 배상되어지지 않기 때문이다. 따라서 일방의 계약위반으로 공기가 지연된다면, 그로 인한 계약당사자간의 직