• Title/Summary/Keyword: Work. Process

Search Result 8,950, Processing Time 0.036 seconds

Work Time of Basement Composite Wall Form Assembly by Work Time Analysis (작업분석을 통한 합벽거푸집 구성 요소별 작업소요시간에 관한 연구)

  • Heo, Kyoung-Moo;Kim, Myoung-Hyun;Kim, Tae-Hui;Kim, Jae-Yeob;Kim, Gwang-Hee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.9-13
    • /
    • 2009
  • Recently, construction in downtown is often done closely at the adjacent building. In this case, underground construction need to Basement Composite Wall(BCW) construction. However, generally, during the construction process of BCW form works have many problems that are narrow working space and inefficient time consuming. Despite of these problems, there was no quantitative research for the work time of BCM assembly. Therefore, in this study, work time of CBW form assembly in underground construction is identified by the work analysis. The results of this study reveal that buttress work of basement form take lots of time in the entire work process of Basement Composite Wall form assembly.

  • PDF

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

Standard Work Process to Reduce a Risk of Track Exchange Work for Railroad (철도 운행선 변경작업의 리스크 저감을 위한 표준작업 프로세스 도출)

  • Yoon, Chang Geun;Park, Su Yeul;Kim, Seok
    • Korean Journal of Construction Engineering and Management
    • /
    • v.22 no.6
    • /
    • pp.131-137
    • /
    • 2021
  • Since many resources are put into the work of changing the railway operation within limited time, it is important to have a specific work plan and safety management. For this reason, the work schedule is shared in advance, and parallel work is being carried out simultaneously by rail system, such as tracks, trolly wires, and signals. However, due to the nature of the transfer work, the work is carried out at night when the railway operation is finished, and many resources are put into the limited area of the operating line, so the risk of safety accidents and failure to change the operating line is recognized as high. Nevertheless, there is still not enough research done in korea regarding the operation line change construction. Therefore, this study is conducted a survey on the track exchange work of railroad for working people, and analyzed the results of the survey. Finally, a standard work process was suggested to reduce the risk of track exchange work.

A Study on Development of Safety Shell Molds for Precision Machining of Sand Mold Casting Product (사형제품 기계가공을 위한 안전금형 개발에 관한 연구)

  • Choi, Jae-Hoon;Nam, Seung-Done
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.4
    • /
    • pp.179-184
    • /
    • 2013
  • An accident from machine work is often fatal to the worker. This accident is mostly preventable through perfect process jig. In case of this machine work, however, the disaster frequently occurred because of the design which is not considered the beginning of product design, post-process and mass process of production. As for sand casting method, this has the merits of the production; the product is easily produced by manual labor. On the other hand, this method has the demerits of a bigger dimensional error contrary to other mass process of production. When the sand casting product is in machine work, there are various problems such as unsafe fix and excessive cutting, product desorption and rapid life depreciation of equipment and tools. Considering the characteristics of sand casting method, it is accepted as difficulty to improve the problems. In this study, it suggests shell mold method for mold instead of the machine work after the sand casting of the circle shape container product. And the surface accomplishes the following average of surface roughness Ra$9.94{\mu}m$ of machine work with the casting of flask mold by shell mold method. In accordance with the simplification of processing process and reducing the average thickness variation by mass production of product with detailed appearance, it has a good influence on safety accident prevention caused by production and damaged product. It is confirmed that making higher degree of size precision of all machine work product is possible to increase the safety and productivity, reduce the processing process and improve environment.

An empirical study of the Strategy Development and Deployment effects on the Hospital Management and Hospital Performance (병원전략의 수립과 전개가 병원의 경영과 병원의 성과에 미치는 영향에 관한 연구)

  • Moon, Jae-Young
    • Journal of the Korea Convergence Society
    • /
    • v.6 no.6
    • /
    • pp.57-63
    • /
    • 2015
  • The objective of this research is to find out how strategy development and deployment effect on patients satisfaction, employee satisfaction, and work process in Korean hospitals. Previous researches suggested when establish a strategy had to reflect internal ability which are work process, employee satisfaction and others and external ability which are patients satisfaction and others. As a results, strategy development positive influence on patients satisfaction, employee satisfaction and work process, and strategy deployment positive influence on patients satisfaction, employee satisfaction and work process as well. Patients satisfaction positive influence on hospital performance and work process influence on hospital performance but employee satisfaction is not.

The Work Environment and Wearing Conditions of Industrial Protective Clothing in Shipbuilding Workshops (조선업 작업장의 작업환경 및 산업용 보호복의 착의실태)

  • Bae, Hyun-Sook;Kim, Min-Young
    • Journal of the Korean Society of Clothing and Textiles
    • /
    • v.36 no.5
    • /
    • pp.512-522
    • /
    • 2012
  • This study examined the work environment and wearing conditions of industrial protective clothing in shipbuilding workshops. It also investigated the relationship between the wearing sensation of industrial protective clothing and overall comfort, according to work process. In addition, the work posture according to work process was evaluated based on ergonomic factors. The wearing rate of industrial protective clothing was 73.3%, 66.7%, and 60.1% for workers engaged in welding, grinding, and painting, respectively. The harmful work environment factors, listed from most harmful to least harmful, were found to be high temperature pyrogens, noxious fumes, organic solvents, UV rays, and heavy dust. The aspect of wearing performance of industrial protective clothing that was most related to user dissatisfaction was poor sweat absorbency. In terms of the correlation between the overall comfort and the wearing sensation of industrial protective clothing, the satisfaction was low shown in orders of physiological comfort, sensual comfort, and movement comfort.

Risk Level Analysis of Architectural Work using AHP (AHP를 이용한 건축건설공사 공종별 위험도 분석)

  • Kim, Jeongmin;Lee, Jong-Bin;Chang, Seong Rok
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.96-102
    • /
    • 2017
  • The highest fatal accident ratio was recorded in the construction industry. According to the industrial insurance premium rate & business type example, among the construction industry, the architectural work has the highest fatal and loss time accident ratio. Previous literature has investigated various aspects of accident occurrence and prevention in architectural work. However, those studied were limited in that they only focused on the fatal accident without considering the loss time accident. But non fatal accidents were recorded more than 50 times of fatal accidents. Therefore non fatal accidents must be controlled to lessen industrial accidents. Based on this, the goal of this study was to investigate the nature of the loss time accident and derive the risk index of work type in architectural work. In this study, opinions of safety experts were gathered and the risk index of work type was derived using AHP(Analytic Hierarchy Process). And verification was accomplished by comparing the results of this study with the risk index derived by analysis of accident records. Results showed that the risk index of work type was significantly higher in steel frame work, temporary installation work, earth & foundation work, facilities work, concrete work. And statistical analysis for verification showed that coefficient of Pearson correlation was 0.686 and P-value was 0.001.

Work and Life Balance in teleworking Environment - Application of CLD, TP, and TRIZ - (원격근무환경에서 일과 삶의 균형방안: 인과지도, 사고프로세스와 트리즈의 적용)

  • Kang, Jae-Jung
    • The Journal of Information Systems
    • /
    • v.29 no.3
    • /
    • pp.179-195
    • /
    • 2020
  • Purpose & Design/methodology/approach Amidst the COVID-19 spread, interest in telework has been increasing as a way to respond to environmental changes and improve organizational performance. In this study, causal loop diagram, thinking process, and four principles of TRIZ were used to find various ways to achieve work-life balance for workers and firms in teleworking environment. Findings The result of the causal loop diagram shows that keeping work-life balance is needed to provide free extra time for workers and achieve the firm's performance through efficient coordination between departments in teleworking environment. Using thinking process of TOC, we proposed a evaporating cloud for work-life balance and reviewed assumptions and premises to maintain extra free time for workers and achieve firm's performance paradoxically, and suggested solutions through the breakdown of the assumptions and premises. Resolving the contradiction(RC) by spatial separation is to divide working spaces into home, smart center, and mobile work types, to find both ways to achieve the organizational performance, and to provide extra time for workers. RC by temporal separation is to divide working time into various unit time, and to find ways to achieve organizational performance through doing work at office or home periodically or shiftly according to a predetermined schedule and time setting. RC by situational separation is to give options of flexible methods of performing work according to the conditions of the company or the worker. RC by separation between part and a whole is to find ways to organize and do the work so that the entire work can be completed efficiently even if each work is performed separately in teleworking way. This study is meaningful in that it provides basic thinking framework for achieving work-life balance in teleworking environment and proposes ways to resolve conflict from various perspectives, but it is limited in that it has not been tested empirically.

The Performance Analysis of Otto Cycle Engine by Thermodynamic Second Law (오토 사이클 기관의 열역학 제 2법칙적 성능 해석)

  • 김성수;노승탁
    • Transactions of the Korean Society of Automotive Engineers
    • /
    • v.9 no.6
    • /
    • pp.94-102
    • /
    • 2001
  • The thermodynamic second law analysis, which means available energy or exergy analysis, for the indicated performance of Otto cycle engine has been carried out. Each operating process of the engine is simplified and modeled into the thermodynamic cycle. The calculation of the lost work and exergy through each process has been done with the thermodynamic relations and experimental data. The experimental data were measured from the test of single cylinder Otto cycle engine which operated at 2500 rpm, WOT(Wide Open Throttle) and MBT(Minimum advanced spark timing for Best Torque) condition with different fuels: gasoline, methanol and mixture of butane-methanol called M90. Experimental data such as cylinder pressure, air and fuel flow rate, exhaust gas temperature, inlet gas temperature and etc. were used for the analysis. The proposed model and procedure of the analysis are verified through the comparison of the work done in the study with experimental results. The calculated results show that the greatest lost work is generated during combustion process. And the lost work during expansion, exhaust, compression and induction process follows in order.

  • PDF

Development of Process Planning Model for Asbsestos Dismantling Work Based on Performance Risk (석면해체 공사의 작업 위험성 기반 공정 계획 모델 개발)

  • Lee, Su-Min;Noh, Jae-Yun;Han, Seung-Woo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.71-72
    • /
    • 2023
  • Asbestos is a durable and heat-resistant building material used in various building materials such as slate, ceiling tex, and spray paint. It has been banned since 2009 after found to be a first-class carcinogen that causes various cancers and asbestos lung disease. Since workers are likely to be exposed to asbestos in the process of dismantling and removal of asbestos-made building materials and facilities, laws and work standards are proposed by the Ministry of Employment and Labor to ensure the safety of asbestos dismantling work. In addition, prior studies on exposure levels and analysis methods have been conducted in this regard mainly for residents. However, the relation between the results of the risk assessment of the process conducted during the asbestos investigation and the work is still ambiguous for the safety of workers. Therefore, this study proposes a process model development methodology that considers work risk based on the results of a survey from asbestos dismantling companies.

  • PDF