Proceedings of the Korean Institute of Building Construction Conference
/
2023.11a
/
pp.49-50
/
2023
Asbestos is a building material that has been actively used because of its excellent durability and heat resistance until 2009, when it was found to be a first-class carcinogen and prohibited in Korea. Currently, asbestos dismantling is an essential process in demolition of old buildings. Workers are likely to be exposed to asbestos in the process of dismantling and removing them, which causes various occupational diseases, suggesting related laws and work standards to ensure the safety of asbestos dismantling process. Accordingly, prior studies have been conducted to analyze the level of asbestos exposure and influencing factors occurring during work, but most of them are mainly concerning health issue while research on process risks considering field characteristics and safety aspects of the work processes is still insufficient. Therefore, this study aims to derive the process risks affecting the safety of workers based on the survey results of asbestos dismantling companies, and further proposed a cost calculation model taking those risks into account.
There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.
Journal of the Korean Society of Clothing and Textiles
/
v.36
no.5
/
pp.512-522
/
2012
This study examined the work environment and wearing conditions of industrial protective clothing in shipbuilding workshops. It also investigated the relationship between the wearing sensation of industrial protective clothing and overall comfort, according to work process. In addition, the work posture according to work process was evaluated based on ergonomic factors. The wearing rate of industrial protective clothing was 73.3%, 66.7%, and 60.1% for workers engaged in welding, grinding, and painting, respectively. The harmful work environment factors, listed from most harmful to least harmful, were found to be high temperature pyrogens, noxious fumes, organic solvents, UV rays, and heavy dust. The aspect of wearing performance of industrial protective clothing that was most related to user dissatisfaction was poor sweat absorbency. In terms of the correlation between the overall comfort and the wearing sensation of industrial protective clothing, the satisfaction was low shown in orders of physiological comfort, sensual comfort, and movement comfort.
The highest fatal accident ratio was recorded in the construction industry. According to the industrial insurance premium rate & business type example, among the construction industry, the architectural work has the highest fatal and loss time accident ratio. Previous literature has investigated various aspects of accident occurrence and prevention in architectural work. However, those studied were limited in that they only focused on the fatal accident without considering the loss time accident. But non fatal accidents were recorded more than 50 times of fatal accidents. Therefore non fatal accidents must be controlled to lessen industrial accidents. Based on this, the goal of this study was to investigate the nature of the loss time accident and derive the risk index of work type in architectural work. In this study, opinions of safety experts were gathered and the risk index of work type was derived using AHP(Analytic Hierarchy Process). And verification was accomplished by comparing the results of this study with the risk index derived by analysis of accident records. Results showed that the risk index of work type was significantly higher in steel frame work, temporary installation work, earth & foundation work, facilities work, concrete work. And statistical analysis for verification showed that coefficient of Pearson correlation was 0.686 and P-value was 0.001.
This paper adopts a distributive performance process model of in-work poverty based on labor markets, households, and welfare states and analyzes the 4-11 waves of the Korean Welfare Panel Study during 2008-15. Previous studies on in-work poverty have focused on the definitions and concepts of in-work poverty by analyzing employment and unemployment persistence and repetition dynamics, but rarely paid attention to institutional distributive performance. In this regard, this study preforms a stepwise analysis of labor markets, households, and welfare states as a process of income generation in labor markets, satisfaction of welfare needs and income pooling at households, and deduction of social security contribution and income tax as well as receipt of public transfer income at welfare states. Results of empirical analysis show that in-work poverty had been on increase during 2008-11, followed by a decrease between 2012-15. At labor market stages, full time status had the most prominent impact on in-work poverty process, while status by employment and contract type have generated a huge variation as well. At household stages, household work intensity and number of earners contributed to reduction of in-work poverty, but the relations did not seen to be straightforward. However, welfare state played little role in lifting employees out of in-work poverty. In terms of institutional distributive process, in-work poverty was prevalent in either household-welfare state stage or labor market-household-welfare stage. Non-vulnerable group in terms of in-risk poverty was around 80% of the sample during the period of analysis, the size of which has remained constant.
Purpose & Design/methodology/approach Amidst the COVID-19 spread, interest in telework has been increasing as a way to respond to environmental changes and improve organizational performance. In this study, causal loop diagram, thinking process, and four principles of TRIZ were used to find various ways to achieve work-life balance for workers and firms in teleworking environment. Findings The result of the causal loop diagram shows that keeping work-life balance is needed to provide free extra time for workers and achieve the firm's performance through efficient coordination between departments in teleworking environment. Using thinking process of TOC, we proposed a evaporating cloud for work-life balance and reviewed assumptions and premises to maintain extra free time for workers and achieve firm's performance paradoxically, and suggested solutions through the breakdown of the assumptions and premises. Resolving the contradiction(RC) by spatial separation is to divide working spaces into home, smart center, and mobile work types, to find both ways to achieve the organizational performance, and to provide extra time for workers. RC by temporal separation is to divide working time into various unit time, and to find ways to achieve organizational performance through doing work at office or home periodically or shiftly according to a predetermined schedule and time setting. RC by situational separation is to give options of flexible methods of performing work according to the conditions of the company or the worker. RC by separation between part and a whole is to find ways to organize and do the work so that the entire work can be completed efficiently even if each work is performed separately in teleworking way. This study is meaningful in that it provides basic thinking framework for achieving work-life balance in teleworking environment and proposes ways to resolve conflict from various perspectives, but it is limited in that it has not been tested empirically.
KSCE Journal of Civil and Environmental Engineering Research
/
v.33
no.6
/
pp.2519-2528
/
2013
The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.
BIM-based 4D simulation makes people easily understand complex construction process using 3D graphics model and helps them review and identify the construction schedule in each phase of the construction process. Moreover, 4D simulation can be used as reference data to determine the validity of the process in the design phase and will be utilized as a measure for checking the construction process. Therefore 4D simulation of construction improves efficiency of project management. However, current commercial applications available for 4D simulation do not provide sufficient functions for connection of 3D models and process information. In this paper, we propose an automated generation method through the definition of the process based on a work method template and developed the template based schedule generation system (TSGS).
The Transactions of the Korea Information Processing Society
/
v.5
no.4
/
pp.904-914
/
1998
BPR(Business Process Reengineering), a radical improvement approach of business process, has been paying attention, and work-flow management and automation has been concentrated on progress velocity of business process and productivity of engineers. In software engineering, software process engineering which focus to process begin to be watched, and for the purpose of software productivity and quality progress and reduction of development term, study on SPR(Software Process Reengineering) is being progressed. In this paper, made workflow analysis and design method for construction of work-flow management system of software process to stand firm process reengineering methodology. In other words, we studied modeling process methods for SPR process, and software process structure and workflow analysis method which construct software process workflow model and specification definition method of workflow software.
Lee Hyung-Soo;Yoon You-Sang;Suh Sang-Wook;Jang Chan-Hee
Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.527-530
/
2002
The purpose of this study is to present an improvement of the form work process. The current slab form work has waste factor by unnecessary process and not complete integration with the finishing process. Therefore the study used value stream analysis methodology for effective improvement of slab form work process. The main contents of the study are as follows; 1) Understanding of non-value adding activities in existing slab form work process 2) Process integration by value stream mapping 3) Effect analysis of time-cost reduction. The study recommends that, as a future research, development of tool and technique for the non-value adding activities are eliminated in building construction.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.