The 6th International Conference on Construction Engineering and Project Management
/
pp.704-705
/
2015
Recent research has been ongoing for modular buildings in the country, and interest increases. However, in accordance with legal restrictions in the country with regard to Project Delivery system of Modular Building, the activation of modular buildings industry is obstructed. In Korea, in accordance with national contract law, the construction contract is apply to the project delivery system of modular buildings, and in accordance with Framework Act on the Construction Industry, The project delivery system of modular buildings has to be a separate order. The definition of separate order in contract as defined in the law is that the electric work and Communication work and digestion facility work has to be separate each contract in order to be ensured professionalism. In accordance with law, the project delivery system of modular buildings is that the contract for construction is concluded with the Owner and the Construction Contractor and the contract for goods is concluded with the construction Contractor and modular manufacturer. Due to these project delivery system, the domestic factory production rate when making a modular unit is significantly reduced compared to the rate of factory production abroad and the domestic factory production rate is estimated to 10-20%. Due to the factory production rate is also low, despite what can be done at the factory the workload in construction field increases. According to the workload in field increases, the effect of the schedule reduction can be reduced. It resolved to form a consortium with a modular manufacturer and construction companies or the contract is concluded with Owner, modular manufacturer and construction companies in each. In this paper, we propose a specific project delivery system for modular building to solve the problem of the low factory production rate and the problem of schedule reduction. Through this paper, due to the variety of project delivery system on modular buildings is expected to contribute to the activation of modular buildings.
최근 들어 농촌에서는 농업규모의 증가, 기술적 복합성 증가, 대량 생산으로 시설물이 점차 다양화, 대형화, 복잡화 되고 있다. 또한 농업의 국제 경쟁력을 갖추기 위해 새로운 관리기술이 필요시 되고 있는 실정이다. 따라서 본 연구는 농촌시설물을 관리할 수 있는 정보시스템 구축을 위한 분류체계를 설정하고자 한다. 시설물에 대한 분류체계 및 코드부여 작업을 통해 PCM(조달-시공-유지관리)정보시스템 구축을 할 수 있을 것이다. 연구의 내용은 국내 건설정보 분류체계의 시설물(Facilities), 공간(Spaces), 부위(Elements), 공종(Works), 자원(Resources)의 5가지 자료를 분석하였으며, 농촌시설물에 적합한 항목들을 도출하였다. 농촌시설물 중 가장 높은 비율을 차지하는 비닐하우스, 온실, 축사 순으로 위계를 설정하여 연구를 진행하였으며, 그 결과, 비닐하우스는 프레임 공간과 시설물 마감공간으로 구분하여 자재코드를 부여하였다. 온실의 경우는 창호의 형태에 따라 코드를 부여하였으며, 축사는 H-beam축사, Pipe축사로 구분지어 코드를 부여하였다. 본 연구에서 설정된 분류코드는 향후 조달 시공 유지관리 시스템의 기초 데이터로 활용 될 것으로 사료된다. 시스템이 구축되면 제품의 부품화와 모듈화를 통해 전문가의 도움 없이 농민이 직접 설치 시공 할 수 있으며, 유지관리 및 교체부품의 정확한 구분으로 인해 폐기물을 최소할 것으로 판단된다.
본 연구는 현 정신건강증진센터 사례관리가 탈원화와 사회복귀의 측면에서 한계를 보이는 현상을 제도적 맥락에서 이해해보고자 사례관리 실천의 제도적 조직화를 탐구한 연구이다. 이를 위해 제도적 문화기술지(Institutional Ethnography)의 연구방법을 적용하여, 11명의 연구 참여자와의 심층면접과 3개월간의 현장관찰을 통해 얻어진 일 지식과 텍스트 자료를 분석하였다. 분석 결과, 정신건강증진센터 사례관리 실천의 한계는 효율 담론(신공공관리론)과 생의학 담론이 담지된 표준화 정책, 치료율 향상 정책, 성과주의 예산 방식, 성과 평가 체계, 인프라 기능 분할 및 연속적 연계 정책, 복지 자원 연계에 대한 무계획으로부터 텍스트적 실천을 통해 조형되었다. 제도적 조직화의 결과로써 드러난 정신건강증진센터 사례관리는 욕구의 재단과 획일화, 의료적 욕구의 편향, 접촉의 표피화, 사회복귀의 비연속적 미포괄적 지원의 특성을 띠고 있었는데 이는 그간 정책적으로 표방되어 온 사례관리의 유용성과는 간극이 크다. 연구 결과에 따라, 생의학 담론 및 효율 담론의 영향력에 주목하고, 대안 담론을 토대로 한 새로운 정책과 전략의 고안, 성과 관리 체계의 변화, 현장 텍스트들의 재검토와 내용의 재구성, 정신질환자지원에 대한 사회적 관점의 고취, 새로운 사례관리 사업에 대한 논의의 활성화 등을 제언하였다.
BIM library, as a systematic collection of BIM objects where the building information is stored, is a vital factor to construct the BIM based work environment. However, construction business is faced the problems relating BIM library such as the absence of the standard for establishing BIM library, the discontinuity of BIM library's compatibility and the lack of practice applicable BIM library. These problems cause the decreasing work efficiency and the recreating BIM model, by delivering inefficient information required in each stage and application field. The purpose of this study is to suggest the integrated management system for property information of BIM library in order to minimize the reworking and to manage information of each stage and application field when exchanging and sharing information. To achieve this, the BIM information classification, the criteria of property requirements for information exchange in BIM application field and the BIM library management system are developed. This study could contributes to ensuring the reliability and accuracy of results of BIM based analysis and to enhancing the speed of business process with sharing and exchanging building information utilizing a single BIM model.
Journal of Information Technology Applications and Management
/
제25권3호
/
pp.55-66
/
2018
Early smart-work of company K was a technology-led way of applying ICT such as smart phones and mobile devices to business. After company K perceived the limitations of ICT-driven smart work, it propelled the work-smart, doing a work smart toward the way that human beings become central and a creative organizational culture is engendered. Company K propelled work-smart strategy in eight categories: simplification of data requirements, establishment efficient meeting culture, streamlining reporting and approval process, simplified document creation, overtime decrease, spreading flexible work system, settlement of healing leave, creating work-smart place. Company K set up an organizational culture secretariat dedicated to work-smart promotion and selected task priorities in consideration of urgency and effectiveness. Owing to such efforts, the company K's work-smart index rose sharply to 72 points this year from 56 points in the previous year. At the organizational culture survey, employees responded that organizational culture improved in all area. For a better future, company K analyzed its work-smart outcomes and planned progressively to improve its work-smart efforts based on employees opinions. This case study will serve as a guideline, for companies to make efforts to going forward to today work-smart beyond yesterday smart-work.
Public institutions have a responsibility to ensure the safety of their employees and the public. One way to do this is to implement a systematic safety inspection system based on risk assessments and continuous improvements. This study developed a systematic safety inspection system for public institutions that are ordered construction projects. The proposed system in this study consists of a three-step process: (1) developing safety grade evaluation tables, (2) preparing and conducting safety inspections, and (3) evaluating and improving safety management grades. The first step is to develop safety grade evaluation tables by analysis and diagnosis of the construction site's work type, disaster statistics, and related laws. The second step is to conduct safety inspections using the developed evaluation tables. The third step is to determine the safety management grade based on the results of the safety inspection, and to improve risk factors found during the safety evaluation. The proposed system was implemented in highway construction projects carried out by public institutions. The results showed that the proposed system has two major effects: (1) reducing accident-related deaths and injuries, (2) improving safety management levels by continuous evaluation and improvement. The proposed system can be utilized in construction projects ordered by public institutions to improve the level of occupational safety and health.
건설자동화 시스템 개발은 건설업이 당면하고 있는 여러 가지 어려움을 해결하고 급변하고 있는 건설환경을 위한 대응책으로 설득력 있는 해결책 중의 한가지로 제안되고 있다. 2006년부터 지능형 굴삭시스템 개발을 위한 연구가 진행되었다. 지능형 굴삭시스템은 작업환경 센싱, 3D 모델링, 작업계획, 작업경로계획, 무인조정 및 정보관리를 위한 다양한 기능을 갖고 있다. 본 논문에서는 지능형 굴삭시스템을 실제 현장에 적용하기 위하여 필요한 요소기술 중의 하나인 작업계획 및 작업경로계획 기능구현을 위한 공간정보모델과 작업경로 시뮬레이터를 제시하고자 한다. 기존의 자료구조인 쿼드트리나 옥트리 구조가 갖고 있는 단점을 보완하기 위하여 토공작업을 위한 새로운 자료구조를 제시하였다. 작업경로 시뮬레이터는 작업환경에 관한 정보, 토공장비에 관한 정보를 제공하며 작업자의 휴리스틱을 고려하여 효과적인 작업경로를 생성할 수 있다. 시뮬레이터에 의하여 생성된 작업경로와 굴삭기 운전자가 제안하고 있는 작업경로를 서로 비교하였다.
The work environment of locomotive cabs has long been an important issue in the design of railload systems since it is quite critical in terms of system's operational safety. It is getting more attention as the running speed of the trains goes up these days. To this end, this paper describes how to systematically construct a DB for the requirements set in the course of the improvement process for the aforementioned cab work environment. As a solution approach, we have adopted the requirement architecture concept to cover the whole activities required to do such as in requirements generation, DB construction, change management, and traceability management. Specifically, based on the requirement architecture framework a requirement process to collect requirements for improvement is discussed, and the guide lines are suggested for verification and validation of the developed requirements. In addition, a base schema and requirements templates are developed, which will be used in generating requirements and constructing a DB. Finally, it is demonstrated how the requirements DB for locomotive cabs can be constructed using a computer-aided tool in an integrated fashion.
지난 20년간 전자정부시스템을 효과적으로 구축 및 운영하기 위한 과학적이고 체계적인 접근방법에 대한 연구가 지속되어 왔다. 그 중에서 제너럴시스템엔지니어링(GSE)의 기법으로 작업분할구조(WBS)에 대한 관심이 높았다. 작업분할구조(WBS)는 전자정부시스템을 효과적으로 관리 및 엔지니어링을 하기 위한 과학적인 수단이다. 작업분할구조(WBS)는 전자정부시스템을 구축 및 운영하기 위한 프로젝트를 자료항목(DIDs)관점에서 작업을 체계적으로 구조화한 것이다. 본 연구에서는 전자정부시스템을 체계적으로 관리 및 엔지니어링 하기 위한 개념적 작업분할구조(WBS)를 기반으로 구체적인 사례연구를 하였다. 사례연구를 통하여 전자정부시스템을 구축하기 위한 개념적 작업분할구조(WBS)의 전형적인 모델을 제시하였고, 이를 적용하기 위한 유용한 지침을 제공하였다. 본 사례연구의 결과는 전자정부시스템을 구축 및 운용 시 널리 활용될 수 있을 것으로 판단된다.
산업과 IT기술의 융합으로 현대사회는 급속하게 발전하고 있으며, 그 이면에는 기본 인프라를 제공해 주는 건설 공사의 역할이 매우 크다고 할 수 있다. 최근 들어 건설공사의 복잡화 및 대형화, 첨단화에 따라 품질향상을 위한 제도 개선 등 관리의 중요성이 더욱 높아지고 있다. 그러나 건설현장에서 품질관리의 이슈가 발생할 경우 이를 해결하기 위하여 많은 시간이 소요되고 있는 것이 현실로서, 건설 프로젝트를 성공적으로 수행하기 위해서는 다양한 시스템이 유기적으로 연결되어 최적의 의사결정을 관리할 수 있는 시스템이 필요하다. 본 논문에서는 RESTful_API 기반의 GCM 푸쉬 알람 서비스를 이용한 품질관리 모델을 제안한다. 제안 모델은 건설 회사의 품질관리실과 프로젝트 매니저가 의사결정에 이용할 수 있는 모델로서, 건설현장의 프로젝트 관리에 적용할 경우 더욱 효율적이고 안전한 건설공사 관리가 가능할 것으로 기대된다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.