• 제목/요약/키워드: Work management system

검색결과 3,462건 처리시간 0.032초

건설공사 사고 데이터(CSI) 활용을 통한 건설안전제도(안전관리계획서)의 운영성과 분석 (Analysis of the Operation Performance of the Construction Safety System by Using Construction Accident Data)

  • 김성덕;조아영;이정석
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.383-384
    • /
    • 2023
  • Using the CSI(Construction Safety Management Integrated Information) data, a comparative analysis was conducted by work type and construction cost according to whether the construction sites were subject to making a safety management plan or not. As a result, by type of work, the ratio of deaths in non-plan sites was high in mechanical facilities and earthworks, and the operation performance of the system was much higher in sites that were less than 5 billion won of construction cost.

  • PDF

외국 약사 국가시험 문항관리 분석연구 (The Analysis of Item Management on Foreign Pharmacists Examination)

  • 권경희;임성실;손의동
    • 약학회지
    • /
    • 제59권5호
    • /
    • pp.235-244
    • /
    • 2015
  • The goal of this study is to help for the utilization the national pharmacists test through the analysis of item development management to the foreign pharmacists examination. The United States is going to NABP (National Association of Boards of Pharmacy) initiative under the curriculum in question on the basis of this assessment and develop standards and unified, systematic system to conduct tests pharmacist. Practice oriented (patient scenario, the participation of a pharmacist or perform work, clinical practice) examination is doing in Canada, The UK is asking the for more than 70 percent and the prescription needed for actual calculation in practice prior to testing program, and by the including that allows references use. Our country may introduce the job as a clinical pharmacist, positively. Item management system is integrated into four regions based on the six-year curriculum should be done in harmony proportion of each region. Integration of fusion of each region in accordance with the duties should be come out. It has gradually been able to item management system developed by the United States or Canada. This item notice pharmacist judging the results of the work must be carried out for management upgrading to a form of management with an emphasis on clinical practice in developed countries. Foundation design, development, production and management and test after actively reviewing ways to improve management system for to management systems, a pharmacist to improve the quality of the national examination could be contributing are involved.

매트기초 건설을 위한 양생방법 선정시스템 (Curing Method Designation System in Mat Foundation Construction)

  • 이태규
    • 한국콘텐츠학회논문지
    • /
    • 제12권8호
    • /
    • pp.366-372
    • /
    • 2012
  • 매트기초 건설공사를 포함한 대부분의 건설공사에서 구조물 가설 초기단계에서의 안전사고 방지는 매우 중요한 요소이다. 안전사고의 위험성을 감소시키기 위하여서는 콘크리트 타설 이후 안전한 거푸집 작업과 적절한 양생의 종류를 선택하는 양생방법의 선정이 무엇보다도 중요하다. 이에 따라 본 논문은 비정상상태의 수화열 해법을 통하여 매트기초 건설을 위한 적절한 양생방법 및 양생시기를 선정하는 알고리즘을 개발하였다. 이를 위하여 균열지수에 주안점을 둔 구조해석 시스템을 통한 사용자 중심의 OOP 루틴을 적용하였다. 이에 따라 콘크리트 가설 초기의 거푸집 공사에 따른 위험요소를 미연에 방지할 수 있는 안전한 양생방법 선정이 시스템적으로 가능하게 된다.

작업관리 개념을 응용한 EVMS 운영 시스템 프로토타입 개발 (A Study on the Development of Domestic-Oriented Prototype for EVMS Operation System by Using Work Task)

  • 박홍태;양금철
    • 한국산학기술학회논문지
    • /
    • 제10권6호
    • /
    • pp.1281-1286
    • /
    • 2009
  • 건설공사의 기성관리체계의 효율적인 운영을 위해, 정부는 공정과 내역의 통합관리를 위한 EVMS를 운영하고 있다. 그러나 현재 공사진도의 평가기준인 공정과 내역이 이원화로 운영되고 있어 건설공사 실무자들에게 부가적인 업무를 가중시켜 왔다. 본 연구는 공정과 내역이 통합 운영될 수 있는 일원화 방안으로 작업과업의 개념을 도입하여 공정과 내역을 공유하기 위한 정보채널로 사용하였다. 또한, 이 작업과업을 활용한 공정 내역 통합관리시스템의 모형제시 및 활용성 검증을 통하여 EVMS 운영 시스템 프로토타입을 개발하여 그 효율성을 제시하였다.

스마트워크센터 환경에서 협업을 위한 좌석 추천 시스템 개발 (Development of Seat Recommendation System for the Collaboration in Smart Work Center)

  • 배성문;한관희;최상현;박주현
    • 대한산업공학회지
    • /
    • 제40권1호
    • /
    • pp.128-134
    • /
    • 2014
  • With the development of Information Communication Technology and a way of solving problems such as productivity improvement, advanced working attitude, greenhouse gas reduction, low birth rate, aged problem, etc., the need of smart work is increasing. Getting out of legacy working types that are limited in time and space, the flexible seat system at a smart work center that supports the smart working environment is proposed. However, the seat choice based on employee's emotional judgement may cause the decline of forming cooperative space and mutual communication because of the scattered seat arrangement between employees. This paper proposed a seat recommendation method for the mutual cooperation at a smart work center. The method is based on a work similarity of employees. A prototype system also implemented to show the feasibility.

건설업 위험성평가 적용사업장 종사자 안전보건 인식도 조사 연구 -사업장책임자 및 관리감독자를 중심으로- (A study on the Research & Analysis of the Health and safety Managing's Understanding on the Applied Construction work site Risk Assessment - Focus on Site manager & manager -)

  • 최수환;배준태;이연수;김치경
    • 대한안전경영과학회:학술대회논문집
    • /
    • 대한안전경영과학회 2012년 춘계학술대회
    • /
    • pp.1-11
    • /
    • 2012
  • Risk Assessment, a basis of health and safety management system, is an calamity prevention activity which regularly measure the level of a risk to passively improve potential hazard. A problem, the assessment not being improved to be applied to the construction work site where requires diversity and complexity, causes the assessment to be inefficient to bring quality results. A study on the investigates and compares the surveyed degree of recognitions of workers who works in companies executing the risk assessment By the investigation and comparison, it is expected to bring the better solution for early and efficient application for those companies which are not taking the risk assessment.

  • PDF

분야별 지식경영 적용사례 분석 - 지식경영 벤치마킹 방법의 다양화 시도 - (Analysis of the adoption case for Knowledge Management - A Trial to diversification of KM Benchmarking -)

  • 윤준수
    • 한국전자거래학회:학술대회논문집
    • /
    • 한국전자거래학회 1999년도 학술대회지 vol.1
    • /
    • pp.95-108
    • /
    • 1999
  • The purpose of this study is to find the diversification of the methodology of KM (knowledge management) Benchmarking which has been developed rapidly as a new managing paradigm all over the world for the 21th century. In particular, at the point of that it has been going to be inevitable for domestic companies to adopt and utilize a knowledge management system as the pending assignment for surviving in the 21th century, this study thus can enable them to support an adoption of KM and suggest directions for companies. Therefore, the successful cases of KM adoption all through the world have been analyzed by this study with the classifications of the industrial fields, work-flows from the view point of learning organizations and information technologies. As a result, the KM type bearing the specific of the respective industry has not been unrolled, and the common element in the analysis of work-flows has been found. Based on the result, it is desirable for the companies to adapt KM, extracting necessary work field for KM. Consequently speaking, they need to benchmark and adopt the KM methodology based on the extracted results.

  • PDF

Spatiotemporal Impact Assessments of Highway Construction: Autonomous SWAT Modeling

  • Choi, Kunhee;Bae, Junseo
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.294-298
    • /
    • 2015
  • In the United States, the completion of Construction Work Zone (CWZ) impact assessments for all federally-funded highway infrastructure improvement projects is mandated, yet it is regarded as a daunting task for state transportation agencies, due to a lack of standardized analytical methods for developing sounder Transportation Management Plans (TMPs). To circumvent these issues, this study aims to create a spatiotemporal modeling framework, dubbed "SWAT" (Spatiotemporal Work zone Assessment for TMPs). This study drew a total of 43,795 traffic sensor reading data collected from heavily trafficked highways in U.S. metropolitan areas. A multilevel-cluster-driven analysis characterized traffic patterns, while being verified using a measurement system analysis. An artificial neural networks model was created to predict potential 24/7 traffic demand automatically, and its predictive power was statistically validated. It is proposed that the predicted traffic patterns will be then incorporated into a what-if scenario analysis that evaluates the impact of numerous alternative construction plans. This study will yield a breakthrough in automating CWZ impact assessments with the first view of a systematic estimation method.

  • PDF

지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구 (A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

공동주택 공사의 작업지연요소 분석 (An Analysis on Work Delaying Factors in Apartment Building Construction)

  • 안상현;유정호;김창덕
    • 한국건설관리학회:학술대회논문집
    • /
    • 한국건설관리학회 2006년도 정기학술발표대회 논문집
    • /
    • pp.496-501
    • /
    • 2006
  • 작업 지연은 건설 사업의 확실성을 저하시키는 요소 중에 하나이다. 작업 지연의 원인 분류체계를 확립하고 관리 항목을 도출하는 것은 건설 사업의 경쟁력을 갖게 한다. 하지만 작업 지연 단계의 분류체계나 지연 원인 도출에 관한 연구는 미흡하다. 따라서 본 연구에서는 건설 사업에서 차지하는 비중이 높은 공동주택 건축공사를 대상으로 설문조사를 실시하고 이를 통해 작업 지연 원인을 파악하고 공종별 지연 요소를 도출한다. 그리고 지연 요소의 우선순위를 선정하여 작업 지연 요소를 효과적으로 제거하고 관리할 수 있는 중점 관리 항목을 제시한다.