The purpose of this study is to analyze the diffusion period and productivity of smartwork in an organization. Firms are increasingly interested in smartwork for non contact work and working from home because of the corona 19. The smartwork is a new technology that changes face-to-face work in an organization. It helps the work of individuals and organizations regardless of time and place. The theoretical background describes the complexity, system thinking, diffusion theory, smart work, organizational resistance, and productivity. This study analyzes the diffusion period and productivity of smart work through business simulation techniques. A simulation study progresses four stages. There are problem definition, hypothesis establishment and causal loop diagram, model construction and verification, and policy evaluation. The simulation models contain an individual's resistance variables organizational investment and leadership variables related to the operation of smartwork. The organizational investment variables include organizational culture, legal system, implement systems and technology investment. The individual resistance variables include cognitive, attitude, structure and technological resistance. The leadership includes leadership interest variables and performance linkage variables. The simulation executed the changes of a people number adopting smart work and the organizational productivity monthly. As a result of the simulation, many organization members have accepted the smart work innovation after 20 months. The organizational productivity through smart work showed very high value after 16 months. In scenario analysis, the individuals' awareness and attitude resistance showed very important variables to productivity and a personal change of smart work adoption. Meanwhile, The organizational investment showed that the high driving-force increased not productivity and the low driving-force showed decreased low productivity. Also, leadership variables showed a powerful driver for changing smart work productivity. The implication of the study has suggested extending complexity, diffusion theory and organization resistance theory based on simulation methods.
본 연구에서는 리스크관리 인자별 중요도와 4D 객체 시각화방법론을 통한 리스크관리 정보의 시각화 모델을 제안한다. 리스크관리 프로세스 모델은 WBS(Work Breakdown Structure)와 RBS(Risk Breakdown Structure)를 통해 구성되며, RBS에서 분류된 리스크 인자는 퍼지 분석기법을 통해 중요도(Weight)가 분석된다. 이 중요도는 4D 시각화를 위한 건설공사 객체(Object)의 속성 데이터로 지정된다. 또한 Object의 4D 시각화를 위한 방안으로는 4D 시뮬레이션기법이 활용되며, 등급별로 구분된 리스크 인자의 중요도와 4D 시뮬레이션을 통해 직접적인 건설공사 부위별 리스크관리 수준 확인과 부위별 리스크 인자의 시각화가 가능하도록 하는 방법론을 제시한다.
Construction Management(CM) that is the business innovation and method of construction management is introducing and implying the needs to improve high cost and low productivity structure and cope with very variable changes of construction market in construction industry within the country. But, safety management system is a very insignificant thing under CM. Consquently, We had been needed for the improvement about what the problem was. Therefore, My study raised the problem to the system and management by making a comparative study of the feature of the management method and the content of the accomplishment of safety management by using the consideration of the case about a big field of construction work implying CM within the country and proposed the active method of safety management.
Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
국제학술발표논문집
/
The 3th International Conference on Construction Engineering and Project Management
/
pp.1318-1323
/
2009
In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.
기존의 일학습병행 사업 성과 분석은 주로 거시적 차원에서 제도 자체의 효과성을 진단하는 방향으로 전개되어 왔다. 본 연구에서는 일학습병행의 운영 주체 관점에서 공동훈련센터 전담인력의 조직성과에 초점을 둔 진단조사를 시행하고 그 결과를 분석하여 공동훈련센터 및 전담인력을 둘러싸고 산재하는 조직관리상의 다양한 이슈들을 확인하였다. 연구결과 특히 일학습병행 유형과 전담인력 고용형태에 따라 전담인력이 공동훈련센터를 바라보는 인식 및 태도가 차이남을 확인하였다. 일학습병행 유형 중에서는 전반적으로 IPP형 일학습병행에서 전담인력의 조직성과가 낮게 나타난 반면, 산학일체형 도제학교의 경우 상대적으로 높게 나타났다. 고용형태는 특히 프로젝트 계약직에 대한 제도적 개선의 필요성이 도출되었다.
Medication adherence is a basic and important element in diabetes management, and it has been known the adherence rate should be keep over 80% to get positive result in diabetes management. In order to increase medication adherence, there have been smart phone apps that record medication, exercise, and diet. However, diabetes patients are generally over 50s, and most of them do not use smart phones. Therefore, in this paper, we propose a medication adherence help system that support both smart phone apps and feature phone SMS. Furthermore, we introduce system architecture for the system. Our work will help ICT-based diabetic management system developers to consider some issues for mobile based diabetic management systems..
Many theorists argued that firms should obtain and their unique resources for sustained competitive advantage under the competitive business environment. Knowledge has been recognized as one of key strategic resource, which is scare, valuable and reasonably durable in both KM literature and practice. however, firms usually face difficulties in identifying which knowledge is a core strategic resource, so that they are wasting time and managerial energies by managing all of knowledge in an organization. This article is composed as follows, the definition of knowledge-management as the norm of the work process, the status arrangement of the knowledge-management system and the old information system of architecture and interior design, the knowledge-management system set-up method and model, and the knowledge creativity and the application culture make-up method. In particular, the present study explains the method that is applied to the use of the knowledge-management system and the application it.
This paper proposes a DRMS(Distribution Remote Management System) which can enhance highly the economics of automatic metering system and the power quality supplied to the electric customer improving the efficiency of the meter reading, voltage management and load management work by realizing the remote meter reading, the remote voltage management and the remote load management based on the ADWHM(Advanced Digital Watt Hour Meter). The DRMS is designed so that the voltage management and load management work in remote site can be processed by collecting the voltage pattern and current pattern as well as watt hour data from all ADWHMs one time every month regularly or from special ADWHMS several time irregularly, A new on-line voltage and load management strategy based on the ADWHM is designed by analyzing the existing voltage management and load management process. Also, DRMS is designed so that watt-hour data, voltage pattern data, load pattern data and power factor data can be collected selectively according to the selection of user to assist effectively the methodology. Remote management program and database of the DRMS are implemented based on Visual C++, MFC and database library of MS. Also, DRMS is designed so as to communicate with the ADWHM using RS232C-TCP/IP converter and ADSL. The effectiveness of the remote metering function is proven by collecting and analyzing the data after ADWHMs installed in any site. The developed strategy and program also is verified through the simulation of voltage management and load management.
최근 도시 발전 및 팽창에 따른 도시 기반시설물의 증가와 이에 따른 관리체계의 복잡 다양화로 인해 이를 유지 관리하기 위한 비용과 노력이 급격히 증가하고 있다. 이러한 도시 기반시설물들은 국민의 생활과 직결되는 중요한 국가보호기반 시설물로서 도로, 상 하수시설, 통신, 전력, 송유, 난방열관로 등이 있으며 지속적이고 체계적인 관리가 필요한 실정이다. 이에 따라 본 연구에서는 도시기반시설물 중 서울시 상수도 사업본부에서 관리하고 있는 상수시설물인 배수지를 대상으로 3D 기반의 GIS 기술을 도입함으로써 업무효율성 향상, 비용절감, 시간절약 등의 측면에서 효율적인 관리방안을 제시하였다. 이를 위해 서울시 상수도사업본부 및 8개 사업소의 담당자를 대상으로 설문을 실시하여 3D GIS를 활용한 관리체계의 도입이 업무효율성에 미치는 영향에 대하여 분석하는 방법으로 연구를 수행하였다. 그 결과, 3차원 공간정보 활용체계의 도입을 통해 업무효율성부분에서 90.32%의 효율성 향상, 관리비용부분에서 93.55% 비용절감 그리고 업무소요시간부분에서는 91.61%의 시간 절약효과를 확인할 수 있었다. 이를 통해 향후 사회기반시설 관리에 3차원 공간정보를 활용할 경우 지속적인 자료 관리를 통한 다양한 통계정보 및 사례분석 등 행정업무의 의사 결정 지원에 기초자료로 활용이 가능할 것으로 판단되며, 입력 자료 누락 등과 같은 관리체계 개선을 통한 업무효율성 향상에 기여할 것으로 판단된다.
최근 정보화 사업이 대형화, 지능화, 융합화되고 있지만 이를 관리 및 감독하는 정보시스템 감리 제도와 사업관리(PMO) 제도는 업무 범위가 중복되거나 경계가 명확하지 않은 부분이 많아 발주기관의 용역 선정에 어려움이 발생하고 있다. 독립성, 품질성, 경제성, 책임성이 개선된 사업관리 및 감리 프레임워크가 요구되며, 이에 따라 정보시스템 감리협회에서는 대략적인 프로세스가 구조화된 정보화 사업 종합관리 프레임워크를 제안하여 사업관리 및 감리 제도를 발전적으로 개편하려는 움직임을 보인다. 본 논문에서는 사업 초기의 발주활동에서부터 사후단계인 운영활동까지 전 단계에 걸친 정보화 사업 종합관리 프레임워크를 소개하고 기존의 관리제도와의 비교분석을 통해 업무 범위를 확인한다. 또한 기존제도와 유사제도를 분석해 감리제도와 PMO 제도 통합의 당위성을 살펴본다. 최종적으로 BSC 성과관리 지표를 기반으로 구현된 COBIT5의 IT 목표 틀을 평가도구로 활용해 종합관리 프레임워크의 적정성을 분석한다. 분석 결과는 정보화 사업의 담당자들이 종합관리 프레임워크의 실무적인 적용에 앞서 그 특성을 이해하는 데 도움이 될 것으로 기대한다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.