As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2006.11a
/
pp.722-726
/
2006
Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.
This study is to find the optimal work plan of robot welding in the subassembly process of shipbuilding and to verify the found solution through 3-D simulation. The optimal work plan was established by evenly distributing the work amount to each stage and finding the shortest work sequence. The shortest work sequence was found by using the genetic algorithm. The result was compared with the practically adopted case and verified through the 3-D simulation.
Journal of the Korean Institute of Educational Facilities
/
v.18
no.1
/
pp.3-10
/
2011
Recently, an active relation between the University and city has become an issue of increasing importance in the field of campus planning. Campus master plan is known as long range development plan, and is not simply an abstract drawing work but definite scaling work procedure. The purpose of this paper is to examine the planning process and relation between university and the region through master plan of master plan of D University and K University which located in Seoul city. From the research which sees master plan of D universities which are presented in existing an instance and K universities master plan did the service blueprint with base and investigated. And both university currently analyzed the situation which is being placed and grasps a problem point, presented that alternative with what kind of method.
Proceedings of the Korean Operations and Management Science Society Conference
/
2001.10a
/
pp.283-285
/
2001
The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.
Korean Journal of Construction Engineering and Management
/
v.2
no.4
s.8
/
pp.48-61
/
2001
This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.
Journal of the Korea Academia-Industrial cooperation Society
/
v.16
no.6
/
pp.4208-4215
/
2015
Most of the administrative works are executed based on the address. Therefore, spatial information is an essential factor for administrative works. So far, many systems, which apply spatial information to administrative works, have been implemented. However, there is little approach to apply spatial information to road occupation permit works. In this paper, we introduce system implementation plan for applying spatial information to road occupation permit administrative works. System implementation plan includes work analysis, applying scenarios extraction, system function extraction, and datamart construction plans. First, work processes and activities are defined based on the analysis of work handbook. Also, activities are displayed in diagram. Second, scenarios applying spatial information to road occupation permit works are extracted. Third, we derive service functions for system, which realize work processes and applying scenarios. Finally, spatial information datamart construction plan is established. Proposed system implementation plan in this research includes application architecture and part of data architecture. For implementing the system, plan for hardware and software architecture should be studied.
International conference on construction engineering and project management
/
2005.10a
/
pp.786-790
/
2005
As the scale of building construction is larger and more complex and the adaptation of new technology is increasing, the tendency of the risk serious accident cases is increasing now. Especially, the accident rate is below 10% at the building construction workers in Korea but among the total industrial accidents it exceeded by 35%. To prevent a construction accident, it is essential that not only to have a through grasp of the characteristic of safety problem but also to establish of efficient safety counter plan are required. According to the type and situation of building construction, the acquirement of necessary information is useful to prevent the hazard of work and establish the counter plan. Among the safety information it is a thing of especial importance that to estimate the hazard of work types for building construction to prepare the counter plan of safety. This study will analyze all of the1600 accidents of the building construction works from the data of KOSHA(Korea Occupational Safety &Health Agency) which were collected during 11 years(1992~2002) data relating to serious accidents of the building construction works, and suggest the counter plan according to the each work type in building construction works.
Objectives: This study examined the national health promotion plan 2010 in order to identify the agenda and issues to be considered for the improvement of the evaluation of the plan and future planning. In specific, the examination focused on both the planning model and practical aspects of the planning work. With regard to the planning model, attention was directed to the theoretical background, logical framework and assumptions involved in the design. Also, an observation was made in comparison with Japanese $\ulcorner$Health Japan 21$\lrcorner$ and American $\ulcorner$Healthy People 2010$\lrcorner$ which provided main reference to our original health plan 2010 and revised health plan 2010 respectively. From this observation it was found that all the plans of three countries, except our original health plan 2010, basically employed a model of educational and ecological approaches to health promotion planning. As predicted, the practical constraints on the health promotion policy and programs in Korea led to many difficulties in attaining the rationality and validity of the plan. The short period of time afforded for the planning work, the limited availability of relevant data and research findings, and the lack of experiences and competent personnel in health promotion planning were main factors impeding the planning work performance. The observation and analysis of the National Health Promotion Plan 2010 suggest two main implications for the future planning of health promotion. First, it will be both theoretically and practically appropriate to maintain the current planning model basically as it is. Second, there are many practical problems that may impede effective planning for health promotion, thus continuous efforts should be made to remove or alleviate such problems.
This study sought to identify the solutions that private-kindergarten directors use in dealing with their work-related stress. The respondents for this study were 200 kindergarten directors in Busan, Ulsan and Gyoung-Nam province. Surveys were issued and 162 were returned and were subject to statistical analysis. The survey consisted of a total of 45 questions about work-related stress and the strategies used to cope with their work situations. The data collected data were analyzed through the SPSS 12.0 program. As a result of this study, it can be argued that, firstly, in terms of the strategies to reduce work-related stress by directors, it is best to address these issues psychologically, directly and physically. Secondly, through this process, significant differences stemming from the age of directors (p < .01) were observed, while there were no significant differences in terms of educational level and management experience in these statistics. Finally, our results indicated that as a result of confirming the differences among effective plans according to total marks of the level of job stress recognition for privatekindergarten directors, there are meaningful and significant differences in the level of job stress recognition in respect to a physical effective plan (p < .05), a negative plan (p < .01) and a direct effective plan (p < .05).
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.