Improvement Plan of Daily Work Accomplishment Index based Process Management based on Lean Construction Principles

  • Yoo, Dong Uk;Hong, Eun Hwa;Choi, Byung Sun;Chae, Myung Jin;Chun, Jae Youl
    • Architectural research
    • /
    • v.20 no.4
    • /
    • pp.147-152
    • /
    • 2018
  • As construction projects become larger, process plans become more complex, and inadequate process management leads to waste of time and resources. Effective process management requires process management techniques that can identify problems inherent in the process, continuously improve, and reflect interdependent process characteristics. In the field, the day's details by work type and work status are to be entered in the work daily report. However, even when important information is written, it is not directly linked to the overall process management. This study aims to propose specific process management and decision-making plan based on actual worker by visualizing and quantifying the information described in the existing work daily report. It is expected efficient process management to increase reliability and productivity through process management, which can increase the utilization of work daily reports and facilitates organic communication among participants.

The Method of Improving the Procedure of Time Management for Measuring PPC(Percent of Plan Completed) (작업성취율 측정을 위한 공정관리절차의 개선 방안)

  • Lim, Chul-Woo;Yu, Jung-Ho;Kim, Chang-Duk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.722-726
    • /
    • 2006
  • Last Planner System (LPS) developed by Lean Construction Institute consists of four steps: Master Schedule, Phase Schedule, Lookahead Planning and Weekly Work Plan. This paper focuses on the process of measuring Percent of Plan Completed (PPC) at the Weekly Work Plan stage. PPC means the percentage of weekly assignments completed. According to the results of the researches that deal with PPC from many other countries, we can assure the benefits of using PPC. However, the concept of PPC is unfamiliar in Korea construction industry. This paper analyzes the cases in which PPC is applied in other countries and compares them with the production control system in Korean construction industry. The results of this research will provide the time management system for using PPC in Korea.

  • PDF

Work Planning Using Genetic Algorithm and 3-D Simulation at a Subassembly Line of Shipyard (유전자 알고리즘을 이용한 조선 소조립 로봇용접 공정 작업 계획 및 3-D 시뮬레이션)

  • 강현진;박주용;박현철
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.18-20
    • /
    • 2004
  • This study is to find the optimal work plan of robot welding in the subassembly process of shipbuilding and to verify the found solution through 3-D simulation. The optimal work plan was established by evenly distributing the work amount to each stage and finding the shortest work sequence. The shortest work sequence was found by using the genetic algorithm. The result was compared with the practically adopted case and verified through the 3-D simulation.

  • PDF

The Study on University Campus Master Plans In Urban Area - Focusing on D & K University Case Study - (도심에 위치하는 대학캠퍼스 마스터플랜에 관한연구 - D/K대학의 사례를 중심으로 -)

  • Kim, Jin-Mo;Cho, Sung-Yong;Choi, Jin-Hee
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.18 no.1
    • /
    • pp.3-10
    • /
    • 2011
  • Recently, an active relation between the University and city has become an issue of increasing importance in the field of campus planning. Campus master plan is known as long range development plan, and is not simply an abstract drawing work but definite scaling work procedure. The purpose of this paper is to examine the planning process and relation between university and the region through master plan of master plan of D University and K University which located in Seoul city. From the research which sees master plan of D universities which are presented in existing an instance and K universities master plan did the service blueprint with base and investigated. And both university currently analyzed the situation which is being placed and grasps a problem point, presented that alternative with what kind of method.

  • PDF

조선 산업에서의 정반배치 계획시스템 개발의 효율화에 관한 연구

  • 박주호;박주철
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2001.10a
    • /
    • pp.283-285
    • /
    • 2001
  • The most work-space invest much time and labor for optimal arrangement. The work-plates of the work-space should be arranged, processed and assembled under the restricted work space. The optimal arrangement under the terms of a restriction arrange the maximum work-plates in appointed work-space. It's the central aim. The work-plates arrangement scheduling of the most work-space are achieved through the experience of the planner. Like this, if the work-plates arrangement is worked by hand, there spend much time for the training planner. And the burden of the personnel expenses occur for using the master worker, also there are dangerous factors to be able to bring the bottleneck circumstance for the process planning, because the quick work planning does not accomplish. With such problems, the biggest problem is inferior the value of the plan. For solved the such problem of hand-operating, some work-spaces developed and used the work-plate arrangement scheduling system for the special quality of themselves. This paper make research into a plan to develop the work-plate arrangement scheduling system efficiently.

  • PDF

Development of CPAM(Construction Process Analysis Model) based on Lean Construction Principles (린 건설 원리에 기초한 건설 생산 공정 분석 모델에 관한 연구)

  • Kim Chan Hun;Kim Chang Duk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.2 no.4 s.8
    • /
    • pp.48-61
    • /
    • 2001
  • This study aims at improving work reliability. It proposes a way to overcome the limitations of current scheduling methods by providing a new framework, CPAM(Construction Process Analysis Model) based on the lean principles. It suggests methods which improve work reliability and production effectiveness with variability control methods. Also it suggests methods which reduce inventories of materials and equipment and WIP(Work In Process) using two techniques; Lookahead Schedule and Weekly Work Plan. The contribution of this research also includes that it assumes planning as a process of reducing uncertainty and maximizing throughput, counter-posing plan reliability to resource redundancy as alternative strategies for managing in conditions of uncertain work flow.

  • PDF

System Implementation Plan for Applying Spatial Information to Road Occupation Permit Administrative Works (도로점용허가 행정업무에 공간정보 활용을 위한 시스템 구축방안)

  • Youn, Junhee;Kim, Changyoon
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.16 no.6
    • /
    • pp.4208-4215
    • /
    • 2015
  • Most of the administrative works are executed based on the address. Therefore, spatial information is an essential factor for administrative works. So far, many systems, which apply spatial information to administrative works, have been implemented. However, there is little approach to apply spatial information to road occupation permit works. In this paper, we introduce system implementation plan for applying spatial information to road occupation permit administrative works. System implementation plan includes work analysis, applying scenarios extraction, system function extraction, and datamart construction plans. First, work processes and activities are defined based on the analysis of work handbook. Also, activities are displayed in diagram. Second, scenarios applying spatial information to road occupation permit works are extracted. Third, we derive service functions for system, which realize work processes and applying scenarios. Finally, spatial information datamart construction plan is established. Proposed system implementation plan in this research includes application architecture and part of data architecture. For implementing the system, plan for hardware and software architecture should be studied.

HAZARD EVALUATION OF WORK TYPES FOR BUILDING CONSTRUCTION

  • Seong-Seok Go;Hyuk Song;Han-Min Lee;Hyun-Chul Lee
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.786-790
    • /
    • 2005
  • As the scale of building construction is larger and more complex and the adaptation of new technology is increasing, the tendency of the risk serious accident cases is increasing now. Especially, the accident rate is below 10% at the building construction workers in Korea but among the total industrial accidents it exceeded by 35%. To prevent a construction accident, it is essential that not only to have a through grasp of the characteristic of safety problem but also to establish of efficient safety counter plan are required. According to the type and situation of building construction, the acquirement of necessary information is useful to prevent the hazard of work and establish the counter plan. Among the safety information it is a thing of especial importance that to estimate the hazard of work types for building construction to prepare the counter plan of safety. This study will analyze all of the1600 accidents of the building construction works from the data of KOSHA(Korea Occupational Safety &Health Agency) which were collected during 11 years(1992~2002) data relating to serious accidents of the building construction works, and suggest the counter plan according to the each work type in building construction works.

  • PDF

The National Health Promotion Plan 2010: The Planning Model and Approaches (국민건강증진종합계획 2010의 기획모형과 실제)

  • Lee, Kyu-Sik;Suh, Mee-Kyung;Han, Dal-Sun
    • Korean Journal of Health Education and Promotion
    • /
    • v.23 no.3
    • /
    • pp.149-167
    • /
    • 2006
  • Objectives: This study examined the national health promotion plan 2010 in order to identify the agenda and issues to be considered for the improvement of the evaluation of the plan and future planning. In specific, the examination focused on both the planning model and practical aspects of the planning work. With regard to the planning model, attention was directed to the theoretical background, logical framework and assumptions involved in the design. Also, an observation was made in comparison with Japanese $\ulcorner$Health Japan 21$\lrcorner$ and American $\ulcorner$Healthy People 2010$\lrcorner$ which provided main reference to our original health plan 2010 and revised health plan 2010 respectively. From this observation it was found that all the plans of three countries, except our original health plan 2010, basically employed a model of educational and ecological approaches to health promotion planning. As predicted, the practical constraints on the health promotion policy and programs in Korea led to many difficulties in attaining the rationality and validity of the plan. The short period of time afforded for the planning work, the limited availability of relevant data and research findings, and the lack of experiences and competent personnel in health promotion planning were main factors impeding the planning work performance. The observation and analysis of the National Health Promotion Plan 2010 suggest two main implications for the future planning of health promotion. First, it will be both theoretically and practically appropriate to maintain the current planning model basically as it is. Second, there are many practical problems that may impede effective planning for health promotion, thus continuous efforts should be made to remove or alleviate such problems.

A Study on the Strategies Used to Reduce the Work-Related Stress of Private-Kindergarten Director (사립유치원 원장의 직무스트레스 대처방안에 관한 연구)

  • Kim, Byung-Man;Hwang, Hae-Ik
    • Korean Journal of Child Studies
    • /
    • v.31 no.4
    • /
    • pp.159-177
    • /
    • 2010
  • This study sought to identify the solutions that private-kindergarten directors use in dealing with their work-related stress. The respondents for this study were 200 kindergarten directors in Busan, Ulsan and Gyoung-Nam province. Surveys were issued and 162 were returned and were subject to statistical analysis. The survey consisted of a total of 45 questions about work-related stress and the strategies used to cope with their work situations. The data collected data were analyzed through the SPSS 12.0 program. As a result of this study, it can be argued that, firstly, in terms of the strategies to reduce work-related stress by directors, it is best to address these issues psychologically, directly and physically. Secondly, through this process, significant differences stemming from the age of directors (p < .01) were observed, while there were no significant differences in terms of educational level and management experience in these statistics. Finally, our results indicated that as a result of confirming the differences among effective plans according to total marks of the level of job stress recognition for privatekindergarten directors, there are meaningful and significant differences in the level of job stress recognition in respect to a physical effective plan (p < .05), a negative plan (p < .01) and a direct effective plan (p < .05).