A Project planning is one of the most important processes that determines success and failure of a project. Scope management for a project planning is also essential job in system integration project. However project planning is very difficult because lots of factors and their relationships should be considered. Therefore project planning of system integration project has been done by project manager's own knowledge and experience. It is necessary to develop an algorithm of WBS(Work Breakdown Structure) identification & document selection along to project's specificity in project management system using AI technique. This study presents a methodology to cope with the limitations of the existing studies that have uniformly been customizing the methodology by only project complexity. We propose PPSM(Project planning support module) based on determination rules regarding route maps and document levels, and CBR(Case-Based Reasoning) for WBS identification.
Korean Journal of Construction Engineering and Management
/
v.8
no.4
/
pp.119-127
/
2007
Cost and Schedule is the most important information, and how efficiently manage this information is the key issue for Construction Project Management. Domestically, systematic scheduling method such as CPM network is not only used widely but integration of time and cost information also is. In order to effectively integrate and use the time and cost information, it is suggested that WBS(Work Breakdown Structure) based QDB(Quantity Database) should be generated from the design phase and, WBS and QDB related system tool should be supported. It could be helpful to relate and integrate other construction project information.
Proceedings of the Korea Information Processing Society Conference
/
2015.04a
/
pp.530-533
/
2015
기존의 조사에 따르면 현재 소프트웨어 개발 프로젝트의 실패율은 높은 편이다. 미국의 The Standish Group의 보고서에 따르면 소프트웨어 프로젝트의 성공률은 약 32%로 낮음을 볼 수 있다. 소프트웨어 프로젝트 성공에 영향을 주는 요소 중 하나는 인력배치이다. 이는 소프트웨어 개발 프로젝트의 참여 인력 구성에 따라 생산성, 비용 및 개발기간이 달라지게 되기 때문이다. 즉 인력 구성에 따라 프로젝트 성공률에 많은 영향을 주게 될 수 있다. 프로젝트 인력할당은 WBS(Work Breakdown Structure)에 따라 PM(Project Manager) 또는 부서장이 할당하게 되는데, 이들은 프로젝트 구성원들의 상세한 정보까지 파악이 어렵기 때문에 인력구성의 어려움이 존재한다. 과거에 수행했던 개발 프로젝트에서 유사성이 높은 작업을 했음에도 불구하고 전혀 경험이 없는 작업에 할당되면 상대적으로 업무 지식습득에 어려움을 겪고 시간 지연에 따른 비용이 추가적으로 발생하게 된다. 이러한 문제를 해결하고자 본 연구는 소프트웨어 개발 프로젝트 구성원의 상세한 정보들과 소프트웨어 개발 업무와의 유사도 측정을 통해 인력을 업무에 할당하는 기법을 제안한다. 이를 위하여 제안한 기법을 프로토타입으로 구현한 후 현업에서 실제 개발되는 프로젝트에 적용하여 제안 기법의 우수함을 평가한다.
Kim, Kyang-Seo;Yang, Keek-Young;Lee, Yung-Su;Yoon, Yer-Wan;Kim, Chun-Hak
Journal of the Korea institute for structural maintenance and inspection
/
v.2
no.3
/
pp.176-187
/
1998
The Dismantlement and Construction of the buildings have the characteristic of floating change with repetition within a Time Schedule which has fixed resources, that is, Manpower, Materials and Equipments, and involve many disaster factors in performing each processes. But as these factors are variable, a work supervisor should be able to understand data analysed distinctive factors of each activities systematically, organizationally, and scientifically, and diagrammatic information media so that he can control any complex and situation beyond forecast. Thus this study is intended to be a barometer of weighing if the existing process schedule has taken security into consideration by making the characteristics of organization and action of Work package per process in a building field with more factors like these into a network system and is intended to minimize construction disasters by systematizing this into a Transformational Network.
Kim, Hyun Soo;Hwang, Jae Yoeng;Kang, Hyo Jeong;Park, Sang Mi;Lee, Jae Hee;Kang, Leen Seok
KSCE Journal of Civil and Environmental Engineering Research
/
v.42
no.1
/
pp.95-105
/
2022
Recently, as the scale of a construction project has become larger and more complicated, there are many cases where construction projects with complex structures are carried out in a fast track method to save construction duration. In the fast track method, the proper division of construction phases is an important issue in determining the overall project period. This study presents a rational phase division method that can be applied when a construction project with complex structures is carried out as a fast track. For this study, a subdivided work breakdown structure (WBS) is developed using the construction of 4 soccer stadiums as application examples, and the schedule is analyzed by dividing the construction process of major phases. To this end, five proposals are applied to analyze the adequacy of the fast track phase division. For the draft with the minimum construction period, the fast track phase division and the schedule model of by each phase were presented. This methodology can have an application in the appropriate phase division and schedule model by construction phase when fast track is applied in large construction project of a similar size.
Jin-Suk Kang;Seung-Ho Jung;Yoon-Bum Lee;Kwang-Myong Lee
International conference on construction engineering and project management
/
2009.05a
/
pp.1318-1323
/
2009
In recent years, dramatic advances in information technology have motivated the construction industry to improve its productivity. Computer-based information technology includes Computer-Aided Design (CAD), Computer-Aided Engineering (CAE), Computer-Aided Manufacturing (CAM), Enterprise Resource Planning (ERP), Digital Mock-Up (DMU) and Product Data Management (PDM). Most construction industries are trying to apply these technologies for quality improvement, reduction of construction time and cost. PDM is very useful for managing data and process related to product design and manufacturing. PDM system has various functions such as drawing and engineering document management, product structure and structure modification management, part classification management, workflow management, and project management. In this paper, PDM system was applied to the design of steel-concrete composite girder bridge. To make a practical guidance for PDM implementation to bridge design, the procedure for its implementation was presented. Consequently, this paper could be useful to enhance the efficiency of bridge design.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.101-108
/
2004
The results of the study include a computerized system and a systematic Process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks In the construction project. The modules for computerizing this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The method logy for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.
KSCE Journal of Civil and Environmental Engineering Research
/
v.26
no.3D
/
pp.469-480
/
2006
The results of the study include a computerized system and a systematic process model for risk management and analysis. This study analyzes the present status of risk management in the construction industry, and then suggests reasonable methods for improved risk management plans. This study defines risk management procedures as preparation, identification, analysis, response and management to manage potential risks in the construction project. The modules for computerizing in this system consist of planning, construction, application of WBS (Work Breakdown Structure) and RBS (Risk Breakdown Structure), and risk analysis. The methodology for analyzing construction risk uses fuzzy theory, and the scope of developed system is focused to the contractors. The risk management system suggested in this study operates on the Internet, for providing contractors with a useful risk management tool by online system, with web-based menus that is helpful for practical application.
Park, Jihun;Shin, Donghwan;Hong, Gwangui;Seo, Dongwon;Hwa, Jimin;Bae, Gigon;Seo, Yeong-Seok;Bae, Doo-Hwan
Journal of Software Engineering Society
/
v.26
no.4
/
pp.77-92
/
2013
To plan a software project, the manager (1)make a work breakdown structure (WBS), (2) estimate efforts for each task, (3) assign employee to each task, and (4) estimate overall schedule. When software project becomes complicated, the possible combination of WBS, effort, and employee assignments dramatically becomes larger. Software planning tool can help software project managers to deal with this complexity. In this research, we discuss with a group of experts who work in software industry, to elicit practical requirements that should be considered in the software planning technique. Considering these requirements, we develop a software project planning tool APP (Automatic Project Planner) which provide effort estimation based on historical knowledge data and automatic human resource allocation. Our technique can be the basis of reasonable and practical software project planing.
Journal of the Society of Naval Architects of Korea
/
v.56
no.1
/
pp.1-10
/
2019
Naval ship design and related other activities can be characterized by the complexity of the interactions among products, activities, and disciplines. Such complexities often result in inferior designs, cost overrun, and late-delivery. Hence there exist tremendous interests in both improving the design process itself and optimizing the interactions among design activities. This paper looks at the complexity of designing naval ships thereby leading to the innovation of current ship design practices using design structure matrix. It can be used to induce the optimal ordering of design activities as well as identify sources of complexities. The method presented here identifies coupled design activities useful for reducing the complexity of naval ship design as well as optimally reordering design activities. This paper recommends the use of design structure matrix method suitable for numerically optimizing the concept design process of naval ship, and reducing cost and time required in designing naval ships by modeling and analyzing the design activities and engineering tasks, defined in systems engineering planning documents.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.