The excavation works for deep foundation in urban areas have recently increased complaints of blasting vibration and settlement of ground level. Foundation must be excavated approximately up to 24-28m depths from the surface. The roads and subway line pass through the excavation area. The Dae-chung station is also located at the nearest distance 5-35m from the working site. To protect subway station and adjacient some structures from blasting and settlement, the level of ground vibration, displacements and stress were monitored and analyzed. The results can be summarized as follows ; 1. An empirical particle velocity equation were obtained by test blasts at Nassan Missi 860 Office tel construction site. $V{\;}={\;}K(D/\sqrt{W})^{-n}$, where the values for n and k are estimated tobe 0.371 and 1.551. From this ground vibration equation, the max. charge weight per delay time against distance from blasting point is calculated. Detailed blasting method is also presented. 2. To measure the horizontal displacement in directions perpendicular to the borehole axis, 6 inclinometers installed around working sites. The displacement at the begining was comparatively high because the installation of struts was delayed, but after its installation the values showed a stable trend. Among them, the displacement by 3 inclinometers installed on a temporary parking area showed comparatively high values, for example, the displacement measured at hole No. IC-l recoded the max. 47.04mm for 6 months and at hole No. IC-2 recorded the max. 57.33mm for 7 months. So, all of these data was estimated below a safe standard value 103mm. 3. Seven strain gauge meter was installed of measure the magnitude and change of stress acted on structs. The measured value of maximum stress was $-465{\;}kgf/\textrm{cm}^2,{\;}-338.4{\;}kgf/\textrm{cm}^2,{\;}302.3{\;}kgf/\textrm{cm}^2$ respectively. In compareto the allowable stress level of steel, they are estimated to be safe.
최근의 건설공사는 개발사업의 증가와 국토의 효율적 개발에 의해 인접시설물과의 충분한 이격거리를 확보하지 못하고 공사를 진행하는 경우가 점차 증가하고 있다. 본 연구에서는 초고층빌딩 개발을 위한 지반 굴착공사와 철도시설 공사가 비슷한 시기에 수행된 지역에서 발생한 인접 철도시설물의 피해사례를 소개하고, 지층 특성과의 상호작용을 고려한 효율적인 보수 보강이 시행된 사례를 소개하고자 한다. 이를 위해 철도시설물 시공 시와 초고층빌딩 시공을 위한 굴착 공사 시 각종 현장조사 및 시험들이 수행되었으며, 이를 토대로 철도시설물과 선로의 침하 원인 분석이 시행되었다. 추가적으로 지반의 공극 충진을 통한 지반보강과 철도구조물의 침하복원을 위해 마이크로 시멘트를 적용한 보강 그라우팅 공법이 수행되었다.
Population concentration in urban areas has led traffic management a central issue. To mitigate traffic congestions, the government has planned to construct large-cross-section tunnels deep underground. This study focuses on estimating the damage caused to frame structures owing to tunnel excavation. When constructing a tunnel network deep underground, it is necessary to divide the main tunnel and connect the divergence tunnel to the ground surface. Ground settlement is caused by excavation of the adjacent divergence tunnel. Therefore, predicting ground settlement using diverse variables is necessary before performing damage estimation. We used the volume loss and cover-tunnel diameter ratio as the variables in this study. Applying the ground settlement values to the settlement induction device, we measured the extent of damage to frame structures due to displacement at specific points. The vertical and horizontal displacements that occur at these points were measured using preattached LVDT (Linear variable differential transformer), and the lateral strain and angular distortion were calculated using these displacements. The lateral strain and angular distortion are key parameters for structural damage estimation. A damage assessment chart comprises the "Negligible", "Very Slight Damage", "Slight Damage", "Moderate to Severe Damage", and "Severe to Very Severe Damage" categories was developed. This table was applied to steel frame and concrete frame structures for comparison.
본 연구에서는 도심지 지하굴착시 많이 시행하고 있는 역해석기법에 의하여 최종변위를 예측하고 계측자료와 비교 분석함으로써. 굴착도중 역해석 기법의 효율성을 극대화 시키고, 동일한 조건의 현장에서 경제적이고 효과적인 시공관리가 이루어 질 수 있도록 하고자 한다. 첫 번째 단계로 역해석 기법을 적용한 현장을 사례로 제시하고 시공과 계측이 완료된 3군데의 다른 현장에 역해석 기법을 적용하였다. 두 곳 현장에서는 만족할 만한 결과를 도출하였으나 한 군데 현장에서는 해석치와 계측치와의 많은 차이를 보였다. 분석결과는, 역해석 조건과 굴착시공조건을 최대한 일치시켜야 하고, 지하연속벽이 강성의 연속벽체라 할지라도 RANKINE 토압조건과 상이하게 굴착하부의 변위가 크게 발생되는 조건에서는 토압의 전이현상으로 토압의 균등화가 이루어지기 때문에 삼각형 형태의 RANKINE 토압 적용성에 대한 신중한 제고가 필요하다. 그리고 토질정수 재산정시 풍화대의 점착력과 지하수위의 경험적 고려가 필요한 것으로 판단된다.
PHC-W 흙막이공법은 말뚝의 원형단면을 개량하여 전면부의 평면화로 지보재의 설치가 용이하며 중첩(over-lap)시공이 가능하여 차수와 수직도가 우수하고 H형강을 사용하지 않아 경제적인 흙막이공법이다. 지층조건이 다른 3가지 사례를 이용하여 수치해석을 실시하였다. N치가 30미만의 지층에서는 PHC-W흙막이 A 형, B 형 각각에서 10.5m, 11.0m정도 굴착 가능한 것으로 나타났다. N치가 30이상의 비교적 양호한 지반에서는 PHC-W흙막이 A 형, B 형 각각에서 17.0m, 19.5m정도 굴착 가능한 것으로 나타났다. 지층조건이 양호할수록 굴착 가능 깊이가 커지는 것으로 나타났고 수평변위는 작아지는 것으로 나타났으며, 휨강도 안전율은 낮아지는 것으로 나타났고 전단력 안전율도 낮아지는 것으로 나타났다.
최근 터널 시공 시 여러 위험요인을 감안하여 보다 안전한 터널의 시공을 위하여 해상이나 하상 밑의 연약지반에서, 도심터널공사나 주요 구조물 하부 통과를 위해서 기계화 시공의 빈도가 높아지고 있다. 그러나 굴착으로 인한 지표면의 침하거동 산정이 어려워 간편하게 예측하는 식이 필요한 실정이다. 따라서 본 연구에서는 연약지반에 병렬로 터널이 시공되어지는 경우 침하거동에 대해 보다 간단한 식과 기존에 Peck(1969)이 제안한 이론을 근거로 연약지반 및 대구경 shield 터널에서 적용 가능한 수정식을 제안하고자 하였다. 이를 위해 최대 침하량, 지반조건에 따른 침하범위, 병렬시공에 따른 간섭 체적손실 등의 장기간의 계측값을 분석하였다. 그 결과 굴착면 상부가 퇴적점토인 연약지반에서 간편하게 최대 침하량을 산정할 수 있는 식을 제시하였는데, Peck(1969)의 식보다 국내 계측데이터에 더 적합한 것으로 나타났다.
도심지 지하굴착 공사가 대형화되면서 공사 중 안전사고에 대한 위험요인이 더욱 증가하고 있다. 이에 따라 공사현장의 위험요소를 모니터링하고 사전에 예측할 수 있는 기술이 필요하다. 굴착으로 인한 흙막이 벽체의 변형을 예측하는 방법에는 크게 경험식과 수치해석 두 가지 방법으로 분류할 수 있으며, 최근에는 인공지능 기술의 발달과 함께 머신러닝 기법을 활용한 예측 모델이 한 가지 방법으로 자리 잡고 있다. 본 연구에서는 예측력과 효율성이 우수한 부스팅 계열 알고리즘 및 앙상블 모델을 이용하여 시공 중 흙막이 벽체 변형을 예측하는 모델을 구축하였다. 지하흙막이 공사의 설계-시공-유지관리 과정에서 도출되는 자료들을 복합적으로 활용하여 데이터베이스를 구축하고, 이 자료를 토대로 학습모델을 만들고 성능을 평가하였다. 모델 성능 평가 결과, 높은 정확도로 흙막이 벽체 변형을 예측할 수 있었으며, 지반계측 자료를 학습에 활용함으로써 실제 시공과정의 특성이 반영된 예측결과를 제시할 수 있었다. 본 연구에서 구축한 예측 모델을 활용하여 시공 중 흙막이 벽체의 안정성 평가 및 모니터링에 활용할 수 있을 것으로 기대된다.
서울시 등의 국내 주요 도심은 지역적 팽창에 따라 도로망 체계가 급격하게 발전하였고 도시민이 안락하고 풍요로운 생활을 영위하도록 전력, 통신, 상수도, 하수도, 냉 난방관로, 가스관 등이 무분별하게 개별 매설되었으며 비효율적으로 개별 관리되고 있다. 국토계획법에서는 Life-Line을 공동 수용함으로써 도로의 반복 굴착을 줄이고 도시 미관의 개선, 포장 내구성 향상에 따른 주행성능 향상 그리고 원활한 교통소통 등을 기대하는 도시계획 시설물로 공동구를 정의하고 있다. 최근 기존 도심지의 재정비 측면에서 쾌적한 도시공간 조성, 지하공간 이용 효율과 도로관리 효율 향상, 지진 및 도로함몰에 대한 재난안전성, 스마트 그리드와 전기자동차 보급과 같은 미래 생활환경 변화에 대한 신속한 대응 등을 기대할 수 있는 기존 도심지의 공동구 설치 필요성이 증가하고 있으나 국내에 설치된 모든 공동구는 신도시 개발에 따라 계획된 Life-Line을 모두 수용하도록 설치한 개착식 공동구 형태이다. 기존 도심지에서는 현재 가동중인 모든 Life-line을 모두 수용할 수 없으므로 도심지 유형별 공동구 설치 타당성 평가시스템을 활용한 설계용량 최적화 등의 새로운 연구가 필요하다. 본 연구는 신도시 공동구를 탈피하고 기존 도심지를 대상으로 평가지표에 의한 정량적 평가모델을 제시 하는 등 유형별 타당성 평가시스템을 세분화하며 정량적 평가시스템의 구현이 가능한 프로그램을 개발해 궁극적으로 도심지 공동구 활성화에 기여하고자 한다.
As the intensity of urban underground space development increases, more and more tunnels are planned and constructed, and sometimes it is inevitable to encounter situations where tunnels have to underpass the river embankments. Most previous studies involved tunnels passing river embankments perpendicularly or with large intersection angle. In this study, a project case where two EPB shield tunnels with 8.82 m diameter run parallelly underneath a river embankment was reported. The parallel length is 380 m and tunnel were mainly buried in the moderate / slightly weathered clastic rock layer. The field monitoring result was presented and discussed. Three-dimensional back-analysis were then carried out to gain a better understanding the interaction mechanisms between shield tunnel and embankment and further to predict the ultimate settlement of embankment due to twin-tunnel excavation. Parametrical studies considering effect of tunnel face pressure, tail grouting pressure and volume loss were also conducted. The measured embankment settlement after the single tunnel excavation was 4.53 mm ~ 7.43 mm. Neither new crack on the pavement or cavity under the roadbed was observed. It is found that the more degree of weathering of the rock around the tunnel, the greater the embankment settlement and wider the settlement trough. Besides, the latter tunnel excavation might cause larger deformation than the former tunnel excavation if the mobilized plastic zone overlapped. With given geometry and stratigraphic condition in this study, the safety or serviceability of the river embankment would hardly be affected since the ultimate settlement of the embankment after the twin-tunnel excavation is within the allowable limit. Reasonable tunnel face pressure and tail grouting pressure can to some extent suppress the settlement of the embankment. The recommended tunnel face pressure and tail grouting pressure are 300 kPa and 550 kPa in this study, respectively. However, the volume loss plays the crucial role in the tunnel-embankment interaction. Controlling and compensating the tunneling induced volume loss is the most effective measure for river embankment protection. Additionally, reinforcing the embankment with cement mixing pile in advance is an alternative option in case the predicted settlement exceeds allowable limit.
본 연구는 도시 우수관망 설계 시 주어진 설계유랑을 효율적이고 경제적인 단면 구성과 관망에 따른 우수배제능력을 극대화시키기 위해 최적화된 설계를 통하여 경제적인 우수시스템을 설계할 수 있는 모형의 개발이 이루어져야 할 필요성이 있다. 이에 본 연구에서는 최적화 기법으로 동적계획법(Dynamic Programming : DP)의 특수한 방법인 이산미분형 동적계획법(Discrete Differential Dynamic Programming : DDDP)를 이용해 최적화된 설계조건을 구할 수 있도록 하였다. 이산미분형 동적계획법의 기법은 설계유랑과 맨홀의 위치가 결정되면 그에 따른 최적 우수시스템이 될 수 있는 관의 용량, 경사, 수위, 수심, 위험도, 회수비용 등을 결정할 수 있는 방법으로 이는 공사비용에 따른 최소비용을 목적함수로 위험도 분석을 통하여 최적화된 조건을 찾는 방법으로 모형개발을 하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.