• 제목/요약/키워드: University building planning

검색결과 897건 처리시간 0.024초

Reducing Earthquake Fatalities and Destructions in Iran: A Project Management Perception

  • Tabassi, Amin Akhavan;Bakar, Abu Hassan Abu;Yusof, Nor'Aini
    • Asian Journal of Business Environment
    • /
    • 제4권1호
    • /
    • pp.25-35
    • /
    • 2014
  • Purpose - Appropriate project management knowledge as well as its effective application in the construction industry increase construction quality and, therefore, reduce fatalities and destruction. Research design, data, and methodology - This study was conducted through a comparative analysis of earthquake fatalities in Iran, Turkey, Pakistan, Indonesia, China, Haiti, Japan, and the United States of America. The data was analyzed using a frequency study. The analysis contrasts the fatalities of some of the strongest earthquakes around the world between 1960 and 2010. Results - Poor quality construction practices and a lack of effective application of project management knowledge play a major role in the vast destruction, high death toll, and dismal tragedies that are associated with earthquakes, especially in Iran. Conclusions - Despite the history of tragic earthquakes and their continuing recurrence, this study attempts to make governments, companies, and disaster management personnel aware of the dangers of poor quality construction and the deficient application of project management knowledge and, further, accentuates effective ways to prevent the probability of serious damage in future. This study contains valuable information on the effects of project management application towards reducing earthquake fatalities and destruction.

녹색건축물인증(LEED) 사례연구를 통한 커미셔닝 관리 프레임워크 도출 (Building Commissioning Management Framework from the Case Study of Green Building)

  • 정진학;박소연;송동훈;안용한
    • 대한건축학회논문집:계획계
    • /
    • 제34권8호
    • /
    • pp.23-30
    • /
    • 2018
  • A necessity of increasing the energy efficiency of the buildings is rising due to global warming and high energy demands prices. Commissioning is an effective way to increase the energy efficiency of the building and reduce maintenance costs. In this study, a case study was conducted to derive the commissioning process of green building and propose management factors that can be used in domestic commissioning projects. The case was a university renovation project that received a LEED Glod certification and conducted the enhanced commissioning. The commissioning is divided into planning, design, construction, and post-construction phases. In the planning stage, commissioning company selection, commissioning goal setting, tasks and responsibilities for each subject are set. In the design phase, preparations are made for inspection and construction steps to prevent design errors. In the construction phase, problems are solved through periodic on-site inspections. In the post-construction phase, a final report with all the details of the commissioning will be created and future maintenance strategies will be proposed. Based on the findings of this study, it will be a basis for the management factors that can be used in the implementation of domestic commissioning projects.

Critical Barriers to the Practice of Effective Cost Planning in the Ghanaian Construction Industry

  • Kissi, Ernest;Adjei-Kumi, Theophilus;Badu, Edward
    • Journal of Construction Engineering and Project Management
    • /
    • 제6권2호
    • /
    • pp.8-15
    • /
    • 2016
  • Cost planning practices in the construction industry worldwide has gained much popularity in recent times due to economic recession and stringent measures that various procurement laws prescribe in most developed and developing countries. Nevertheless, these practices in developing countries such as Ghana are constrained with the existence of critical barriers that render them non-effective and hence, accounting for the numerous abandonment of both private and public projects. Consequently, this study was enunciated with the aim to examine the critical barriers to the practice of effective cost planning in the Ghanaian construction industry. Through an in-depth literature review and a pilot survey, questionnaires were designed and administered to quantity surveyors. Data generated from the field survey was subjected to principal component analysis. The findings of the study revealed weak cost planning knowledge base, poor cost databases and understanding, inadequate designs and planning and external conditions are the major barriers to cost planning practices in the Ghanaian construction industry. The need for this study cannot be doubted since it provides an insight for experts in the construction industry on the barriers of the practice of cost planning in the industry. The awareness of these barriers will therefore facilitate efficient and effective efforts to resolve them. A future study is thereby proposed by this study to explore effective cost planning practices in the Ghanaian construction industry that will ensure private and public stakeholders get value for their money invested.

Built-in guide 타입 다중 로봇의 고층 빌딩 외벽 청소를 위한 센서 기반 운동 계획 알고리즘 (Sensor-based Motion Planning Algorithm for High-rise Building Facade Cleaning of Built-in Guide Type Multi-Robot)

  • 이승훈;김동형;강민성;길명수;김영수;백성훈;한창수
    • 제어로봇시스템학회논문지
    • /
    • 제18권5호
    • /
    • pp.445-452
    • /
    • 2012
  • With the increasing number of high-rise and large-scale buildings, modern buildings are becoming intelligent, and are incurring high construction costs and requiring careful maintenance. Maintenance works for high-rise buildings significantly depend on human labor, unlike other construction processes that are gradually being automated. The resulting accidents may produce very high social and economic losses. To address this problem, herein, this paper proposes robotic building maintenance system using multi-robot concept, in specific, cleaning a building facade which is directly subjected to minimize human labor; that improves the process efficiency and economic feasibility. The sensor for detecting contamination of building's outer-wall glass is proposed; Kalman filter was used for estimating robots' status with the contamination of the window glass. Task allocation of the sensor based multi-robots for an effective way of task execution is introduced and the feasibility was verified through the simulations.

에너지 절약형 건축물 설계를 위한 대학 강의동 형태별 에너지 성능 비교에 관한 연구 (An Energy Performance Comparison of University Lecture Facilities for Energy Saving Building Design)

  • 김태훈;서지효;추승연
    • 대한건축학회논문집:계획계
    • /
    • 제34권11호
    • /
    • pp.105-112
    • /
    • 2018
  • Global environmental problems are growing, and the importance of buildings with high energy consumption has been emphasized. In Korea, the Ministry of Land, Transport and Maritime Affairs has been promoting the mandatory zero energy building since 2020, and guidelines related to the zero energy building have been developed. In addition, based on the "Energy-saving Design Criteria for Buildings" of the "Green Building Promotion Act" in Korea, the standards for energy-saving design are specified and the energy saving plan is written. Besides, the 'Energy-saving construction standards for eco-friendly houses' also specify insulation, machinery, equipment, and sunshade. Also, there is little consideration about the cost such as construction cost and material cost which should be considered important in the construction stage. Therefore, this study aims at analysis of building type and energy performance versus materials for energy saving building design considering energy performance in planning aspect of initial design stage. In this study, because the variables can not be neglected in this study, it is selected as the lecture facility of the 'K' university campus building which can consider the remaining factors except the passive design element as the control variable, Energy performance analysis.

Lessons Learned during the Early Phases of a Modular Project: A Case Study of UNLV's Solar Decathlon 2020 Project

  • Choi, Jin Ouk;Lee, Seungtaek;Weber, Eric
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.543-550
    • /
    • 2022
  • The U.S. Department of Energy conducts the Solar Decathlon competition as a student-based achievement that encourages sustainable design with energy efficiency and solar energy technologies. In the 2020 competition, the University of Nevada, Las Vegas (UNLV) team designed, fabricated, and constructed a net-zero modular house that applies innovative and highly efficient building technologies. This paper focused on the lessons learned during the early phases of this ongoing modular project. The research methodology included obtaining feedback from key project participants using a well-structured questionnaire. The results showed that the major items/challenges in the project's planning phase included selecting the modular size, planning the construction system, planning the materials and procurement, estimating costs and duration, selecting a fabricator, collaboration and communication, safety, and planning module transportation. These findings will help modular practitioners and future Solar Decathlon competition participants better understand how and what factors they should consider most during the early phases through the lessons learned.

  • PDF

도시의 건폐율 및 용적률이 도시기후에 미치는 영향 분석 (Analysis on the Effects of Building Coverage Ratio and Floor Space Index on Urban Climate)

  • 여인애;이정재;윤성환
    • 한국태양에너지학회 논문집
    • /
    • 제29권3호
    • /
    • pp.19-27
    • /
    • 2009
  • In this study, Urban Climate Simulation was performed by 3-Dimensional Urban Canopy Model. The characteristics of urban climate were analyzed combining artificial land coverage, building size, heat production from the air conditioning and topographic conditions as physical variables which affects urban climate characteristics. The results are as follows. (1) The aspects of the urban climatal change is derived to be related to the combination of the building coverage ratio, building height and shading area. According to the building height, the highest temperature was increased by $2.1^{\circ}C$ from 2-story to 5-story building and the absolute humidity by 2.1g/kg maximum and the wind velocity by 1.0m/s was decreased from 2-story to 20-story building. (2) Whole heat generation was influenced by the convective sensible heat at the lower building height and by the artificial heat generation at the higher one over 20-story building influence to some extent of the building coverage ratio. The effect of the altitude is not more considerable than the other variables as below $1^{\circ}C$ of the air temperature. In the last, deriving the combination of building coverage and building height is needed to obtain effectiveness of the urban built environment planning at the point of the urban climate. These simulation results need to be constructed as DB which shows urban quantitative thermal characters by the urban physical structure. These can be quantitative base for suggesting combinations of the building and urban planning features at the point of the desirable urban thermal environment as well as analyzing urban climate phenomenon.

Formwork Productivity Analysis Model for Cost-efficient Equipment Operations

  • Hyunsu Lim;Taehoon Kim;Hunhee Cho;Kyung-In Kang
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.226-230
    • /
    • 2013
  • In the tall building construction, the slab formwork largely impacts on construction cost. Because productivity of a slab formwork is influenced by a number of and the efficiency of equipment, using the equipment-based construction method, an appropriate equipment input planning is crucial for the productivity. Meanwhile, the general equipment input planning is conducted by intuition based on experience due to the lack of equipment productivity data. Thus, this study develop a simulation model to analyze table formwork productivity and to propose an optimum equipment input plan that reflects the construction process, based on the full consideration of the economic factors. This study developed a simulation model by using CYCLONE and the data for the model was collected by measuring the duration of each unit activity in the tall building where table forms were applied. It is expected that a simulation model helps users to make better decision on the equipment input planning of slab formwork.

  • PDF

축소도시 특성과 건축물 시가화집중도의 상관성에 관한 연구 - 경북 지자체를 대상으로 - (A Study on Correlation between Shrinkage City Characteristics and the Index of Building Concentration in Urban Area - Related to the Gyeongbuk Local Government -)

  • 정태화;김현수
    • 지적과 국토정보
    • /
    • 제52권2호
    • /
    • pp.35-51
    • /
    • 2022
  • 본 연구는 해당 지자체의 전체 건축물중 시가화구역 내에 건축물이 얼마나 집중하고 있는지를 조사하였고 이를 '건축물 시가화집중도'라는 용어로 처음 사용하였다. 경북의 각 시군에 대하여 건축물 시가화집중도를 조사한 결과 건축물 시가화집중도가 낮을수록 노인인구 비율이 높으며 지자체의 주민 1인당 일반회계 지출액도 많은 것으로 나타났다. 본 연구를 통해 건축물 시가화집중도가 도시쇠퇴 정도와 도시재정의 효율성을 가늠할 수 있는 하나의 지표가 될 수 있음을 확인하였고 향후 축소도시계획 수립에 필요한 기초자료로 활용될 것으로 사료된다.

소음지도를 활용한 방음시설별 도로교통소음 개선효과에 관한 연구 (A Study on The Improvement Effects of Road Traffic Noise by The Noise Barrier Facilities Using a Noise Map Simulation)

  • 정재훈;박진호;권우택;김형철
    • 환경영향평가
    • /
    • 제17권4호
    • /
    • pp.213-224
    • /
    • 2008
  • Since 1970's rapid urbanization and economic growth, the population was highly increased and residential type was changed from single detached house to high density and high-rise apartment. Recently more high-rise residential building generates more traffic volumes and it makes spatial concentration. The highly traffic volumed road and high residential building was constructed nearby, it occurs noise problem. The purpose of this study is comparing the performance of three type noise barrier between noise source and receiver using a noise map simulation. Three types were composed as road side planting trees, building side planting trees and noise barrier wall. Planting trees is less effective than noise barrier wall as a noise barrier. And they are all effective under 3 stories than over 5 stories, especially noise barrier function can't work over 5 stories.