• Title/Summary/Keyword: Unit Modular Construction

Search Result 97, Processing Time 0.02 seconds

A Study on the Supply Process of Unit Modular Housing through a Comparison of Cases

  • Kim, Kyoon-Tai;Jun, Young-Hun;Kim, Tae-Yeong
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.411-414
    • /
    • 2015
  • The purpose of this study is to conduct a comparative analysis between Korea and the United States of the supply process of unit modular housing at both the factory production phase and the transportation and lifting phase, as part of an attempt to invigorate the unit modular housing market in Korea. Unlike the practice in the United States, one of Korea's unique characteristics is that the floor is constructed with reinforced concrete and hot water heating system. To do this, the wet method in Korea is used that includes concrete placement, curing and constructing hot water floor heating system at the factory production phase, which results in a longer production time and also requires the lifting of heavier loads. In the United States, interior and exterior finishing works of modular housing are performed by different companies, and the distance between the unit module factory and the construction site is quite far. This kind of dualized production structure may cause confusion when it comes to schedule management, procurement management, and stock management. Moreover, problems caused by external environmental factors such as wind and rainfall were reported in the course of long-distance transportation. The results of this case comparison are expected to provide fundamental data that will reduce the amount of trial and error in the unit module production, transportation and lifting work in Korea, which has a comparatively small number of unit modular housing cases.

  • PDF

Estimation of the Probability Distribution Model on the Load of Transport of the Unit Module (유닛모듈 운반하중에 관한 확률분포 모델 추정)

  • Park, Nam cheon;Kim, kyoon Tai;Kim, Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.220-221
    • /
    • 2014
  • Recently It has been required the research for the load of transport of the unit module to secure the safety of the transport locking device. So the purpose of this study is to analyze the probability distribution of the load of transport of unit modular when transporting unit modular by vehicle.

  • PDF

A Study on the Project Delivery System Improvement for Construction Efficiency of the Unit Modular Housing (유닛모듈러주택의 시공효율화를 위한 수행체계 개선방향 연구)

  • Park, Nam-Cheon;Kim, Kyoon-Tai;Park, Su-Yeul;Chae, Myung-Jin
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2013.05a
    • /
    • pp.265-267
    • /
    • 2013
  • Recently, It is being reduction to market of the domestic construction industry for the instability of the domestic market structure. So it is necessary to plan response measures for to ensure the competitiveness of the construction market of overseas. The purpose of the study is suggest of improvement of the project delivery system for the efficiency of the construction of the unit modular housing of considering the reducing cost and technological competitiveness of the domestic construction industry.

  • PDF

A Case Study on the Application of Modular System to the Superstructure of Floating Architecture in Europe (플로팅 건축 상부시설에서 모듈러 시스템 적용 유럽 사례 연구)

  • Song, Seog-Ki
    • Journal of Navigation and Port Research
    • /
    • v.36 no.10
    • /
    • pp.873-881
    • /
    • 2012
  • This study is about the case study on the application of modular system to the superstructure of floating architecture in Europe. There are many restraints in the onsite construction of floating architecture. Then, various industrialized construction methods are needed to reduce the portion of the onsite construction in floating architecture. Among the various industrialized construction methods, the modular system can be more suitable for floating architecture. At this background, this study analysed the European cases of the application of modular system and classified the types of applied modular system. As a result, this study could classify the three types of modular system, such as, building unit modular, space unit modular and planning concept modular, and define the characteristics of three types by comparing with each other.

Marketing Strategy and Influential Factors based on the Attributes of Unit Modular System (유닛 모듈러 공법의 특성요인 분석 및 시장진출전략)

  • Kim, Domin;Lee, Jeongseok;Kim, Juhyung;Kim, Jaejun
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.1
    • /
    • pp.78-86
    • /
    • 2014
  • Modular system is a construction method which installs factory-manufactured units on site. It enables to reduce the duration and improve the quality of the construction. Nevertheless, the unit modular system is restrictively applied to domestic market such as barracks, education facilities, low-rise housing. To motivate the application of unit modular system, this study figures out important attributes of the unit modular system in a domestic construction market. Finally this study suggest marketing strategies and influential factors by Importance-Performance Analysis(IPA) based on those attributes focusing on the apartment housing. As a result, Unit modular System in the domestic market has strength on constructability, but it show weakness on usability and economic aspects which are more important in apartment housing market. Thus an improved technology in usability and economic aspects are required to activate the market.

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

Suggestions for Quality Management through Analysis of Construction Process of Multi-layer Modular Housing (적층식 모듈러주택의 시공 프로세스 분석을 통한 품질관리 중점사항 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.67-75
    • /
    • 2019
  • The modular construction means that more than 70% of the parts such as walls, windows, electrical wiring, facility piping, bathrooms, and kitchen appliances are pre-assembled at the factory and transported to the site. It is possible to shorten the construction period than general construction work and to secure high quality through modular mass production since the modular construction works in the field at the same time as the modular production. However, there are only four domestic modular manufacturers, and each company's modular components and construction methods are different, so it is necessary to standardize them. Therefore, this study investigated the construction process centering on the stacking method of modular housing construction work applied to D site in Cheonan-si, and proposed the key points of quality management by construction stage. As the project was conducted as a pilot project for government R&D projects, some differences may occur from general modular housing construction. However, the construction process and quality control focus of each unit box type modular house analyzed in this study can be used as basic data in the future of modular housing construction. In addition, the results of this study can be used to establish construction standards, such as the development of checklists and establishment of standard processes.

Development of Manufacturing Planning for Multi Modular Construction Project based on Genetic-Algorithm (유전자 알고리즘 기반 다중 모듈러 건축 프로젝트 수행 시 모듈러 유닛 공장생산계획수립 모델 개발)

  • Kim, Minjung;Park, Moonseo;Lee, Hyun-soo;Lee, Jeonghoon;Lee, Kwang-Pyo
    • Korean Journal of Construction Engineering and Management
    • /
    • v.16 no.5
    • /
    • pp.54-64
    • /
    • 2015
  • The modular construction has several advantages such as high quality of product, safe work condition and short construction duration. The manufacturing planning of modular construction should consider time frame of manufacturing, transport and erection process with limited resources (e.g., modular units, transporter and workers). The manufacturing planning of multi modular construction project manages the modular construction's characteristics and diversity of projects, as a type of modular unit, modular unit quantities, and date for delivery. However, current modular manufacturing planning techniques are weak in dealing with resource interactions and each project requirement in multi modular construction project environments. Inefficient allocation of resources during multi modular construction project may cause delays and cost overruns to construction operation. In this circumstance, this research suggest a manufacturing planning model for schedule optimization of multi project of modular construction, using genetic algorithm as one of the powerful method for schedule optimization with multiple constrained resources. Comparing to the result of the existed schedule of case study, setting optimized scheduling for multi project decrease the total factory producing schedule. By using proposed optimization tool, efficient allocation of resource and saving project time is expected.

Space Planning of the Health Life Support Center using the Modular Construction Method - Space Unitification and Modularization through Spatial Proximity Analysis of Case Projects - (모듈러 공법을 적용한 건강생활지원센터 공간계획에 관한 연구 - 기존 사례의 공간 근접도 분석을 통한 공간 유닛화와 모듈화 -)

  • Jang, Hwalje;Kwon, Nahyun;Ahn, Yonghan;Ahn, Chiwon
    • Journal of the Architectural Institute of Korea Planning & Design
    • /
    • v.35 no.11
    • /
    • pp.43-52
    • /
    • 2019
  • The purpose of this study is to suggest the use of modular construction method in order to promote the dissemination of the Health Life Support Center of the government, and to suggest the modular unitification and modularization plan for the necessary space data in the initial stage. By analyzing the floor plans of the 50 case projects currently in operation, the 28 required spaces and their spatial proximities are determined. Base on spatial proximities, each space is unitificated into a modular unit and modularized into a modular modules were integrated to modular proposals. As a result of this study, 13 unitificated modular unit floor planes and 3 modularized module floor planes including the staircase unit were proposed. However, future study have needed to study how to apply them to different actual sites and how to reduce cost.

Suggestion of Safety Management Activities and Key Check point for Safety Management in Modular Construction Sites (모듈러 건설현장의 단위작업별 안전관리 활동 및 중점 체크사항 제안)

  • Jun, Young-Hun;Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2022.04a
    • /
    • pp.202-203
    • /
    • 2022
  • In this study, focusing on work types of lifting modules and modules assembly in modular construction sites, unit works were defined according to the construction process of each work type, and safety management elements, safety management activities, and key check point were proposed. The results of this study may have somewhat overlapping contents in the construction procedure in order to derive specific safety management activities and check point for each unit work. Therefore, there is a limit to use the results in an actual modular construction site. In future research, we plan to improve this part and derive a checklist that considers field usability.

  • PDF