• 제목/요약/키워드: Underground construction

검색결과 1,924건 처리시간 0.022초

A new geophysical exploration method based on electrical resistivity to detect underground utility lines and geological anomalies: Theory and field demonstrations

  • Jo, Seon-Ah;Kim, Kyoung-Yul;Ryu, Hee-Hwan
    • Geomechanics and Engineering
    • /
    • 제18권5호
    • /
    • pp.527-534
    • /
    • 2019
  • Although ground investigation had carried out prior to the construction, many problems have arisen during the civil-engineering works because of the presence of the unexpected underground utility lines or anomalies. In this study, a new geophysical exploration method was developed to solve those problems by improving and supplementing the existing methods. This new method was based on the difference of electrical resistance values between anomalies and surrounding ground medium. A theoretical expression was suggested to define the characteristics of the anomalies such as location, size and direction, by applying the electric field analysis. An inverse analysis algorithm was also developed to solve the theoretical expression using the measured electrical resistance values which were generated by the voltage flowing the subsurface medium. To verify the developed method, field applications were conducted at the sites under construction or planned. From the results of the field tests, it was found that not only the new method was more predictive than the existing methods, but its results were good agreed with the measured ones. Therefore, it is expected that application of the new exploration method reduces the unexpected accidents caused by the underground uncertainties during the underground construction works.

지중 구조물의 지반 진동 안전거리 설정에 관한 현장적용연구 (A Study on the Safety Distance of Underground Structures in Asepct of Ground Vibration Velocity due to Explosions)

  • 박상진;강지원;박영준
    • 한국건설관리학회논문집
    • /
    • 제17권4호
    • /
    • pp.87-94
    • /
    • 2016
  • 탄약고 지하 및 주변에 시공된 지하구조물의 안정성 평가의 필요성은 도심지 및 사회기반시설의 확장으로 대두되었다. 그러나 지하구조물에 대한 우발적인 폭발의 영향에 대한 연구는 미진하다. 본 연구에서는 지하구조물의 안정성평가를 위한 방법을 제시하고 사례연구를 통해 적용성을 확인하였다. AUTODYN과 SPACECLAIM을 이용하여 구조체 및 지반모델링을 실시하였으며, 폭발효과를 모의하여 지반의 진동속도를 측정하였다. 사례연구의 결과에 따르면, 70m 지하에 설치된 지하구조물은 모의된 폭발 효과로부터의 영향이 거의 없는 것으로 판단된다. 본 연구에서 활용된 안정성평가방법은 지하형 탄약고 설계에 사용되거나, 혹은 주기적인 진동으로부터 영향하에 있는 지하구조물의 안정성을 평가하는데 활용될 수 있을 것이다.

강재주열벽을 적용한 지하건축물 가설공법의 개발 및 강재주열벽의 휨성능 연구 (Development of construction method for underground buildings with MSRC diaphram wall and study on flexural performance of MSRC diaphram wall)

  • 정지승;나귀태
    • 한국터널지하공간학회 논문집
    • /
    • 제19권6호
    • /
    • pp.937-957
    • /
    • 2017
  • 도심지 도로는 도시민의 안락한 편익을 제공하기 위해서 차량과 보행이 집중되고 각종 공급배관들이 매설되어 있으며 도시민은 도로에 접하고 있는 건축물을 주거, 사무, 상업, 휴게공간으로 이용하면서 안락한 생활을 영위하고 있다. 그러므로 높은 토지비용에도 불구하고 토지이용효율이 높은 지하건축물이 꾸준하게 건설되고 있다. 최근 지하건축물의 개착공사로 인해서 주변도로와 인접건물이 침하되는 등의 도시안전성 저해문제가 사회적으로 크게 이슈되고 있으며 이를 개선하기 위한 제도개선이 활발히 이루어지고 있다. 본 연구에서는 도심지 지하건축물의 지하굴착 안전성을 확보하고 주변 침하로 인한 민원을 효과적으로 예방할 수 있도록 새로운 형태의 강재주열벽을 개발하였으며 이를 이용한 지하건축물 가설공법에 관한 연구를 수행하였다. 또한 강재주열벽의 휨강도 시험을 통해서 강도설계법을 적용한 흙막이 벽체의 합리적인 설계방법을 제시하였다.

Towards high-accuracy data modelling, uncertainty quantification and correlation analysis for SHM measurements during typhoon events using an improved most likely heteroscedastic Gaussian process

  • Qi-Ang Wang;Hao-Bo Wang;Zhan-Guo Ma;Yi-Qing Ni;Zhi-Jun Liu;Jian Jiang;Rui Sun;Hao-Wei Zhu
    • Smart Structures and Systems
    • /
    • 제32권4호
    • /
    • pp.267-279
    • /
    • 2023
  • Data modelling and interpretation for structural health monitoring (SHM) field data are critical for evaluating structural performance and quantifying the vulnerability of infrastructure systems. In order to improve the data modelling accuracy, and extend the application range from data regression analysis to out-of-sample forecasting analysis, an improved most likely heteroscedastic Gaussian process (iMLHGP) methodology is proposed in this study by the incorporation of the outof-sample forecasting algorithm. The proposed iMLHGP method overcomes this limitation of constant variance of Gaussian process (GP), and can be used for estimating non-stationary typhoon-induced response statistics with high volatility. The first attempt at performing data regression and forecasting analysis on structural responses using the proposed iMLHGP method has been presented by applying it to real-world filed SHM data from an instrumented cable-stay bridge during typhoon events. Uncertainty quantification and correlation analysis were also carried out to investigate the influence of typhoons on bridge strain data. Results show that the iMLHGP method has high accuracy in both regression and out-of-sample forecasting. The iMLHGP framework takes both data heteroscedasticity and accurate analytical processing of noise variance (replace with a point estimation on the most likely value) into account to avoid the intensive computational effort. According to uncertainty quantification and correlation analysis results, the uncertainties of strain measurements are affected by both traffic and wind speed. The overall change of bridge strain is affected by temperature, and the local fluctuation is greatly affected by wind speed in typhoon conditions.

비경화성 점착 방수제와 보강메쉬를 이용한 지하 외방수 공법에 관한 연구 (A Study on the Outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity WaterproofBusiness)

  • 문유석;이신춘;권기주;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.213-217
    • /
    • 2009
  • Underground structures are built into concrete like a architecture and public works. Concrete has watertightness as such, But buildings are leaking from the cracks. Recently, construction method do a lot of close construction in the downtown area. So architects are using the method for the outer layer of a two-layer wall to save spaces. They have been using Top-down method and waterproof agent method and others to outer layer of a two-layer wall method. But, There are many leakage in underground structure from lack on requirements performance of materials. Therefore, I hope to test the outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity Waterproof. In addition to, I wish to apply as outside waterproof method for the section for the outer layer of a two-layer wall in underground structure.

  • PDF

지상 및 지하구조물 해체공사를 위한 구조 안전관리 방안 연구 (A Study on Structural Safety Management Plan for Above Ground and Underground Structure Dismantling work)

  • 심학보;전현수;석원균
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2021년도 가을 학술논문 발표대회
    • /
    • pp.194-195
    • /
    • 2021
  • Due to urban regeneration projects or changes in the living environment, there is an increasing need to demolish old buildings that have lost their functions. Demolition of above ground and underground structures is an important construction project that greatly affects the construction period and safety of the entire process. However, it is difficult for the safety officer to manage the demolition work due to the lack of specific and diverse data applicable to the site of the demolition plan. Therefore, in this study, items that need to be improved in structural safety when the above-ground and underground structures are demolished are reviewed and organized. For the main contents of structural safety management in demolition work, 1) structural review reflecting the order of demolition work, 2) installation and dismantling of steel pipe scaffolding and dust nets, 3) installation and dismantling of system scaffolding, 4) installation and dismantling of fall prevention nets, 5) jack support Installation and dismantling, 6) movement of equipment, movement and planning between floors, 7) equipment for demolition of structures, height of remnants, 8) site cleanup, and 9) equipment operators were categorized and arranged.

  • PDF

터널 굴착시 발생하는 지하수의 유출량 예측에 관한 연구 (A Study on the Prediction of Outflow of Groundwater in Tunnel Construction Areas)

  • 박선환;장윤영;강형식;최준규;양근호
    • 환경영향평가
    • /
    • 제16권6호
    • /
    • pp.407-419
    • /
    • 2007
  • This study investigated the predicted and abserved outflow of groundwater which occurred during tunnel constructions. Among the 586 road construction projects from 1986 to 2006, 4 route 25 tunnel construction areas and 26 waste water treatment facilities under construction were studied. Most of the tunnel outflow prediction in EIA (Environmental Impact Assessment) process have been classified into the 17 types of units depending on the assessor's options, which have not conformed to the request of the residents and non government organizations. The investigation results showed that the outflow of underground water in tunnel construction areas averaged about $0.133m^3/km{\cdot}min$ with the maximum $0.386m^3/km{\cdot}min$, and that the outflow mostly occurred in the early stage of tunnel excavation and diminished gradually. The prediction of outflow of underground water in the EIA process showed excessive results compared to observed outflow, the even 51.7 times. Consequently for more realistic prediction, current EIA method for prediction of outflow of underground water in tunnel construction areas has to adopt numerical methods coupled with hydraulics and geologic informations from unit methods of present time.

지중배전선로 무정전 공법의 최적화를 위한 장비 개발 (Development of outage-free installation method and equipments for underground power distribution system)

  • 유근양;주종민;이용순;김영민;강내국
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.122-124
    • /
    • 2005
  • Underground distribution system is a trend due to the successive development of metropolitan area and satellite cities and the environment of the commercial and residential areas. The high quality of electricity, which is related with the minimal outage duration time due to the maintenance work for the underground distribution line, is mandatory. Hence, the construction method and tools for the outage-free maintenance construction have been required for underground distribution system. So far, all the efforts for outage-free maintenance for the underground distribution have been limited only to the survey for foreign countries situation and the theoretical provision; thus, It is required to develop the various construction method and the application tools. Differently from the aerial line, the construction of the underground cable is complicated and the insulation distance between conductor and shield should be maintained in loadmaking/breaking operation, though the apparatus connected with cable is a deadfront type. Also since the apparatus is installed above ground, by-pass of faulted area at busy area needs a variety of high technologies. Therefore, in this these, the authors introduce the development status of the loadbreak connectors, connection facilities, outage-free maintenance system for secondary side, a secondary auxiliary bushing and additional tools so that there can be more progress on this field.

  • PDF

3차원 수치해석모델을 이용한 주방식 지하공간의 안정성 평가 (Stability evaluation of room-and-pillar underground method by 3D numerical analysis model)

  • 강병윤;방상혁;노충기;김동관
    • 한국터널지하공간학회 논문집
    • /
    • 제25권1호
    • /
    • pp.1-11
    • /
    • 2023
  • 본 연구에서는 수치해석을 이용해 주방식 지하공간의 안정성을 검토하고 고찰하였다. 수치해석을 수행하기에 앞서 현장지반조사를 수행하고 지반조사결과를 이용하여 지보패턴을 선정하였다. 지보패턴은 암반 등급 별 Type-1, 2, 3을 선정하였으며 주방식 지하공간은 암주와 지하공간으로 구성된 형상으로 구성되어 효과적인 모사를 위해 3차원 수치해석모델을 개발하였다. 지보패턴 안정성 검토결과, 모든 지보패턴에서 천단변위, 내공변위, 지보재 응력 모두 안정한 것으로 확인되었다. 시공단계에 의한 해석결과, 암주가 형성되는 시공단계에서 지하공간에 과도한 응력이 발생하는 경향이 확인되었다. 이를 통해, 실제 시공 시 암주 형성 시공단계에서 정밀한 시공이 요구될 것으로 판단된다.