A Case Study on the Top-Down Methods Performed in the Excavation Works of Domestic Downtown (국내 도심지 굴착공사에 적용된 Top-Down 공법의 시공사례 연구)

  • Chung, Jeeseung;Park, Sukk
    • Journal of the Korean GEO-environmental Society
    • /
    • 제18권2호
    • /
    • pp.5-19
    • /
    • 2017
  • Underground excavation for building construction in Korea is changing from conventional support method (Strut, Ground anchor) to inside permanent support method by stability, economic, circumstances around excavation and etc. This study was selected the sites of Top-down, New Top-down, S.P.S, S.T.D and B.R.D in general use. This study was compared and analyzed a construction cost and period between aforementioned methods and conventional support method. Also, this study was confirmed the stability of temporary retaining wall by analysis for measurement data under construction. As a result, this study can grasp that most improved permanent support method is excellent in economic and constructability than conventional support method in case of deep excavation and rapid appearance of bedrock.

Analysis of Cases Using Top-Down Construction Method Under Various Site Condition (현장 조건에 따른 Top-Down 공법 사례분석에 관한 연구)

  • Shin, Hyun-Jung;Shin, Kyoo-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2011년도 춘계 학술논문 발표대회 1부
    • /
    • pp.197-199
    • /
    • 2011
  • To utilize the Top-Down construction method, it is required to analyse building area, floors, and soil conditions to choose the three basic elements of retaining wall, base column, and floor structure. The purpose of this research is to compare the methods of Top-Down with other construction methods. The research method is to analyse the project conditions of Top-Down project cases. The aim is to develop a method of selecting alternatives, considering construction characteristics, work schedule, supporting methods, foundation types.

  • PDF

Characteristics and Case Analysis of Top-Down Construction in China (중국 Top-Down 공법의 특징과 시공사례 분석)

  • Fang, Guang-Xiu;Rhim, Hong-Chul;Lee, Hai-Chool;Song, Jee-Yun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.41-44
    • /
    • 2009
  • Top-Down construction is becoming a popular construction method in China as there is a growing need for building high-rise structures in crowded urban areas. This paper deals with the explanation and analysis of characteristics of Top-Down construction in China. In China, usually construction site is relatively large or sometimes huge compared to that in Korea. Thus, as the high-rise portion of the building needs to be constructed first and fast, island method is used at the center p망t of the building. In the meanwhile, the remaining area of the building is constructed using Top-Down method to provide working area for equipments and workers. Also, the case studies of construction examples are provided in this paper. The purpose of this paper is to promote international understanding and interaction between neighborhood countries for the utilization of Top-Down construction.

  • PDF

Study on the Application of Semi-open cut Top-Down Construction for Framework (세미 오픈컷 역타공법의 현장적용에 관한 연구)

  • Sho, Kwang-Ho
    • Journal of Korean Association for Spatial Structures
    • /
    • 제11권2호
    • /
    • pp.129-138
    • /
    • 2011
  • Construction methods for underground structure are classified as bottom-up, up-up, and top-down methods depending on the procedure of construction related to a superstructure. In top-down construction methods, building's main structure is built from the ground level downwards by sequentially alternating ground excavation and structure construction. In the mean time, the main structure is also used as supporting structure for earth-retaining wall, which results in the increased stability of the earth-retaining wall due to the minimized deformation in adjacent structures and surrounding grounds. In addition, the method makes it easy to secure a field for construction work in the downtown area by using each floor slabs as working spaces. However top-down construction method is often avoided since an excavation under the slab has low efficiency and difficult environment for work, and high cost compared with earth anchor method. This paper proposes a combined construction method where semi-open cut is selected as excavation work, slurry as earth -retaining wall and CWS as top-down construction method. In the case study targeted for an actual construction project, the proposed method is compared with existing top-down construction method in terms of economic feasibility, construction period and work efficiency. The proposed construction method results in increased work efficiency in the transportation of earth and sand, and steel frame erection, better quality management in PHD construction, and reduced construction period.

Top-Down Method of Deep Basement Construction in Urban Area : a Comparison of Numerical Analysis and Field observation Data (도심지 지하굴착에 적용된 Top-Down 공법의 수치해석과 실측비교)

  • 김학문
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 한국지반공학회 1991년도 추계학술발표회 논문집 지반공학에서의 컴퓨터 활용 COMPUTER UTILIZATION IN GEOTECHNICAL ENGINEERING
    • /
    • pp.312-331
    • /
    • 1991
  • Top-down Method of basement construction technique has been applied for building of the deep basement car park the close proximity of priceless historic buildings in LONDON. Numerical analysis for the prediction of ground movement of the surrounding buildings was performed in order to compare the field data at the various stages of excavation and support. The predicted results from the elasto-plastic analytical method were compared with the observed data and the agreement is very satisfactory. It may be concluded that the system of diaphragm wall supported by the permanent base slabs (Top-Down Method) was proved to be the most effective technique in terms of reducing any critical damage to the surrounding buildings.

  • PDF

A Study on the Sub-elements of the Top-down Construction Method Selection Model using Weighting Factor in Downtown Area (가중치 분석을 통한 도심지 Top-Down 공사에서의 공법요소 선정 모델 개발에 관한 연구)

  • Park, Chang-Wook;Moon, Seung-Yun;Yun, Seok-Heon
    • Journal of the Korea Institute of Building Construction
    • /
    • 제8권4호
    • /
    • pp.61-69
    • /
    • 2008
  • The size of the construction projects become huge and complex, and the depth of excavation for the underground structures become deeper. Also the working area is not enough for loading materials and temporary facilities. This is the most case of recent construction projects in downtown area. Top-down is the most useful method for this kind of construction projects. Top-down construction method consists of supporting method, retaining wall type, foundation type and construction direction such as up-down or up-up. construction managers have to select sub-elements for top-down construction method in planning phase. This study is to suggest the sub-elements selection model for the top-down construction method, and the case study is conducted for evaluating this model.

Non-Supporting Form System for Top-Down Construction (지하 역타 공법용 상·하 분리형 무지주 지지체 개발)

  • Jeong, Mee-Ra;Rhim, Hong-Chul;Yom, Kyong-Soo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.27-30
    • /
    • 2008
  • For the purpose of developing economical and time-efficient formwork for Top-down construction, a Non-Supporting Form System has been proposed. The system is consisted of two parts: a hanging part to support a steel frame and a section of concrete slab, and the other hanging part to lower the steel frame. In this paper, the proposed system is compared to two existing systems of Non Supporting Top-down Method and Bracket Supported R/C Downward Method. It is expected that this system can be used in Top-down construction with further development.

  • PDF

The Behavior of Earth Retaining Walls Applied to Top-Down Construction Method Using Back Analysis (Top-Down 공법이 적용된 흙막이벽의 역해석을 이용한 거동분석)

  • Hong, Won-Pyo;Kang, Chul-Joong;Yun, Jung-Mann
    • The Journal of Engineering Geology
    • /
    • 제22권1호
    • /
    • pp.39-48
    • /
    • 2012
  • The behaviors of a diaphragm wall and a contiguous pile wall such as CIP(Case-in-place pile) and SCW(Soil-cement wall), applied to the top-down construction method, were analyzed using the SUNEX program, which is widely used to design earth retaining walls. Four types of earth pressures, as described by Rankine (1857), Terzaghi and Peck (1967), Tchbotarioff (1973), and Hong and Yun (1995a), were applied to the analysis program to predict the lateral displacement of walls. The results show that the displacements of an earth retaining walls vary with the applied earth pressure. The predicted lateral displacement based on Hong & Yun's (1995a) earth pressure is similar to the measured displacement. Therefore, the actual lateral displacement of an earth retaining wall, as applied to top-down construction method, can be accurately predicted by using an analysis program considering Hong and Yun's (1995a) earth pressure.

A Study on the Construction Process Management of the Top-Down Construction Method (Top-Down 공사의 공정관리 방법 연구)

  • Kang Hyun-Jung;Rhim Hong-Chul;Lee Ghang;Yun Dae-Jung;Kim Sang-Il
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 한국건축시공학회 2006년도 춘계학술논문 발표대회 제6권1호
    • /
    • pp.133-136
    • /
    • 2006
  • The top-down construction method is an excavation and substructure construction method by excavating earth and building slabs from the ground level to the bottom of a building. The top-down method can be categorized into several types by its process and other technical details. Some of commonly used top-down methods in Korea today are S.O.G., N.S.T.D., and S.P.S. Among these, one method is chosen depending on construction field conditions, cost, construction time and so on. This study explores several factors that may affect the selection of a top-down method. This paper reports preliminary survey results with 54 top-down construction experts and comparison results of 5 top-down construction sites.

  • PDF

Non-destructive Inspection of Top-Down Construction Joints of Column in SRC Structure using Ultrasonic Method (초음파법을 이용한 콘크리트 역타시공 이음부 공극의 화상검출특성)

  • Park, Seok-Kyun;Baek, Un-Chan;Lee, Han-Bum;Kim, Myoung-Mo
    • Journal of the Korean Society for Nondestructive Testing
    • /
    • 제20권4호
    • /
    • pp.290-295
    • /
    • 2000
  • The joint treatment of concrete is one of the technical problems in top down construction method. Joints created with the top down construction result in serious weakness from the aspects of both structural and water-barrier function. Ultrasonic method was used for the inspection of top down construction joints of a various column in SRC structure in this study. The advantages and limitations of this method for non-destructive inspection in top down construction joints are investigated. As a result, it has been verified that the semi-direct measurement method is more effective than the other methods for detecting the voids of construction joints using ultrasonic method.

  • PDF