• Title/Summary/Keyword: Top-Down construction method

Search Result 94, Processing Time 0.121 seconds

Analysis of the Amount of Construction and Demolition Waste Generated by Underground Vertical Extension Methods (지하수직증축공법 적용에 따른 건설폐기물 발생량 분석)

  • Won, Jongsung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.273-274
    • /
    • 2021
  • This paper proposes a process to calculate the amount of construction and demolition (C&D) of underground vertical extension methods through considering the characteristics of used construction and demolished materials. The underground vertical extension methods analyzed in this paper were the bottom-up, normal top-down, and top-down methods with multi-post downward (MPD). In order to check the applicability of the proposed process, 24 illustrative examples were generated. The amount of C&D waste of the illustrative examples were calculated and compared. As the results, the top-down method with MPD was the most efficient method to reduce the amount of C&D waste.

  • PDF

A study on Reinforcement Methods to Improve the Usability of the H-beam Backfill Installation Part in Top-Down Construction Method (역타공법 뒷채움재 설치 구간의 사용성 개선을 위한 보강 방안 연구)

  • Shim, Hak-Bo;Jeon, Hyun-Soo;Seok, Won-Kyun;Park, Soon-Jeon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.180-180
    • /
    • 2021
  • Recently, structural damage and defect has occurred in the H-beam backfill installation part of Top-Down construction method. In order to secure structural safety and usability in the adjacent section of the backfilling method, It turns out that it is necessary to analyze by dividing into various cases. The H-beam backfill installation section is divided into the case of adding a vertical plate inside the slab, adding a shear stud, adding a reinforcing bar, changing the thickness of the pressure plate, and filling the H-beam backfill with mortar. Ansys modeling was performed and an appropriate solution was suggested by analysis.

  • PDF

DEVELOPMENT OF CONCRETE FILLED TUBE AS A PILLAR PILE FOR TOP DOWN METHOD

  • Jee-Yun Song;Hong-Chul Rhim;Seung-Weon Kim
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.808-813
    • /
    • 2009
  • Top-down method is widely used for urban area construction for its advantages in reducing environmental problems such as dust and noise, and saving construction cost depending on given conditions of a construction site. Because the excavation and construction of super- and sub-structures of the building have to be proceeded simultaneously, a column has to be embedded prior to excavation. This column is called a pillar column or pre-founded column. Usually a wide flange section is used for these columns. To place the columns, usually the diameter of casing holes needs to be larger than the section of the wide flange itself in order to accommodate a couple of tremie pipes for pouring concrete. In this paper, a newly developed method of using circular pipe as an alternative to the existing wide flange section is discussed. The crucial part of the new method is to develop a connection between the circular column and concrete flat slabs. For shear force transfer from concrete slab to the concrete filled tube (CFT) column, shear jackets with studs and shear bands are proposed. The studs are welded on the jackets at shop and placed around the circular column on site. The shear bands are welded on the outer side of the CFT at shop and inserted into ground with the CFT. Test results and application of the method to a construction site are also provided in this paper.

  • PDF

A Study on Void Check as Placing Method with Use of V-meter Method (초음파탐사를 통한 타설방법이 공극에 미치는 영향에 관한 연구)

  • 임형일;최창기;정근호;김우재;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1107-1112
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is finding a way to prevent concrete void and concrete suitable for top down, through V-metering for top down column and concrete experiment.

Bearing Capacity Evaluation of the Drilled Shaft Using Small Scale Model Test (축소모형말뚝을 이용한 현장타설말뚝의 지지력 평가)

  • 조천환;김홍묵;김웅규
    • Journal of the Korean Geotechnical Society
    • /
    • v.20 no.5
    • /
    • pp.117-126
    • /
    • 2004
  • Recently, the top & down method with drilled shafts as a foundation of high rise building is often adopted for the purpose of construction period reduction and construction cost effectiveness. It is common to omit the loading test as a quality assurance on account of the high capacity of drilled shafts for the top & down method. It seems that the capacity of drilled shaft in recent top & down method is beyond that of conventional loading test method. However, the quality assurance for the drilled shaft as foundation of high rise building becomes much more important since the drilled shaft should bear much higher working load. A small scale test pile can be an alternative as a quality assurance for the drilled shaft with hish capacities. Through a case study, this paper gives an idea for solving the limitation of the conventional loading test method for the quality assurance of drilled shaft with high capacities. In particular, this paper analyzed the scale effect for a small drilled shaft installed into bedrock, which could be used for an alternative.

A Study on the Behavior of the Retaining Walls with the Improved Top-Down Support System using the Building Structure (건축 구조체를 이용한 개량 역타공법 적용시 흙막이 벽체의 거동 연구)

  • Chun, Byung-Sik;Roh, Bae-Young;Do, Jong-Nam;Rew, Woo-Hyun
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2008.10a
    • /
    • pp.1666-1672
    • /
    • 2008
  • In this study, it collected and analyzed a construction case of the improved top-down support system application field on a case by case retaining wall method. The behavior of horizontal displacement was analyzed according to retaining wall type after reviewing a design stage and estimated horizontal displacement under the construction. The study results showed that it is judged stable until excavation termination irrelevant to a retaining wall method at the improved top-down support system application. It is judged that the settlement of behind ground can minimize because the retaining wall head displacement also behave stably. It was compared the predicted horizontal displacement in design and the measured horizontal displacement acquired through a measurement by using Elasto-Plastic analysis program. The comparison results showed that a similar horizontal displacement was predicted within stability standard irrelevant to a retaining wall method. So, it is decided that the advanced prediction is reasonable by Elasto-Plastic analysis in design applied the improved top-down support system. In the case of the ground anchor method application under a same condition, it is decided that a horizontal displacement will more increase than the improved top-down support system is applied. If a section condition is same, it was decided that to apply top-down support system is more stable than that.

  • PDF

An Elemental Study for construction elevation of a Underground Columns in Top-Down construction Method (TOP-DOWN공법에 의한 지하기둥의 시공성 향상을 위한 기초적 연구)

  • 임형일;박희곤;백민수;조상영;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2001.11a
    • /
    • pp.1059-1064
    • /
    • 2001
  • This study is about accurate steel column position method in the Top down method's delicate part. When the concrete is placing, it is required that complementary measures to the transformation due to concrete pressure, column buckling, the trouble due to bar net inserting and so on. To solve the problem of exist method, the concrete is placed at the bottom of excavated hole in advance. then, the steel column is inserted into the excavated hole. With a new method try, the problem due to placing pressure and others is could be prevented. In this study, the concrete is examined with test-slump, slump flow, and compressive strength to do quantitative analysis of concrete. The factors of the experiment is plasticizer, retarder addition rate, fly ash substitution rate to cement. Considering of the new method try, the retarder added concrete properties-fluidity, viscosity, strength-is investigated as time lapsing.

  • PDF

A Study on Strength and Packing Characteristics of Top-Down Joint in Field Experiment (현장실험을 통한 역타설 이음부의 강도 및 충전특성에 관한 연구)

  • 강동현;김종구;김병천;박병근;이영도;정상진
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2000.10b
    • /
    • pp.1101-1106
    • /
    • 2000
  • When top down method is used, it could be a construction method trouble in column joint, between the former concrete and the latter. It could bring a void and weak concrete in column. The purpose of this study is to find a solution of removing void and air, way to exhaust air in top down column. through specimen concrete placing experiment.