• 제목/요약/키워드: Top-Down 공법

검색결과 49건 처리시간 0.026초

지하역타공법용 개방형 슬래브 개발 (Development of Opened Slab Method for Top-Down Construction)

  • 송지윤;임홍철;강두현
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 춘계 학술논문 발표대회
    • /
    • pp.43-46
    • /
    • 2008
  • In Top-Down construction for underground structures, the placement of slab as a horizontal supporting member against lateral earth pressure is an important process in determining construction time and cost. Usually, a reinforced concrete perimeter girder distributes concentrated lateral loads from earth retaining structures such as Cast-in-place (CIP) piles. By combining the function of the R/C perimeter girder and horizontal slabs, the Opened Slab Method is efficient for reducing construction time by elimination of time-consuming formwork for traditional perimeter girders. The structural performance of the method is also discussed in this paper.

  • PDF

고층건물을 위한 원격제어 해체전용 장비 및 공법 개발 (Development of Remote Controlled Demolition Equipment and Its Demolition Method for High-Rise Buildings)

  • 박종협;홍대희;서영수;김효진;홍석희
    • 한국콘크리트학회:학술대회논문집
    • /
    • 한국콘크리트학회 2008년도 춘계 학술발표회 제20권1호
    • /
    • pp.957-960
    • /
    • 2008
  • 최근 급격히 진행되고 있는 도심지 구조물의 대형화, 고층화에 따른 고층건물의 해체뿐 아니라 극한 환경의 해체현장에서 기존의 해체공법은 인력+장비에 의한 해체작업을 수행하여 언제나 작업자에 대한 치명적인 위험에 노출되어 있었다. 따라서 본 연구는 낙후된 해체산업을 첨단화시키고, 안전하고 친환경적인 해체장비 및 공법을 개발하고자 한다. 이를 위해 첫 번째, 선진외국의 해체장비인 B사(社)와 국내 무인해체장비인 M사(社)의 장비 성능을 비교분석하기 위한 장비시연회를 개최하였다. 이러한 성능의 비교분석을 토대로 해체산업에서 요구되는 기능을 도출하고, 그에 적합한 햅틱장치(haptic device) 기술, 힘반향 메카니즘(force feed-back mechanism), 환경인식용 센서퓨전(sensor fusion) 기술등 첨단기능이 융합된 무인해체 장비의 요소기술을 제안하였다. 이를 토대로 먼저, 새로운 햅틱장치 (haptic device)를 고안하였다. 두 번째로 기존의 고층건물의 기계식 해체공법을 개선한 탑다운 (Top-Down) 해체장치 및 공법을 제시하였다.

  • PDF

Top Down 공사현장에 적용되는 현장타설 선기초기둥의 지지력에 관한 연구 (A Study on Bearing Capacity of Cast-In-Place Pre-Founded Columns in Top Down Construction Sites)

  • 변요셉;정경식;김종호;천병식
    • 한국지반환경공학회 논문집
    • /
    • 제12권12호
    • /
    • pp.55-61
    • /
    • 2011
  • 최근 최첨단 정보통신 산업의 발전과 비약적인 교통수단의 개선으로 인해 도심지의 개념이 점차적으로 확대되고 있으며, 지하공간이 대형화, 대심도화 되고 있어 구조물의 건설을 위한 지하굴착방식 또한 건설환경에 발맞춰 변화되게 되었다. 이 중 Top Down 공법은 건축계획과 연계하여 종래의 지하굴착 방식과는 다른 획기적인 방법이며, 그 중 기둥용 선기초기둥은 공사방식이나 공사기간, 공사비에서 매우 중요한 요소 중 하나이다. 따라서 본 연구에서는 이러한 건물 기둥용 선기초기둥에 대하여 현장 검증용 재하시험 결과를 기준으로 설계단계에서의 지지력 산정결과와 비교, 분석을 통해 각 검토방법별 적용성을 고찰해 보고자 하였다. 그 결과 대부분의 설계식은 재하시험 결과에 못미치는 보수적인 결과를 주는 것으로 나타났다. 또한 구조물기초 설치 후 영구하중에 대해 현장타설말뚝 두부에 작용하는 압축응력을 평가해 본 결과 전반적으로 기초와의 구속효과로 인해 작용응력이 감소하는 것으로 나타났다.

지하철골공사 공사비산정기준 마련을 위한 현장조사 연구 (A Study on the Establishment of Construction Cost Estimation Standard of Underground Steel Construction through Field Survey)

  • 송태석;한상준;안방율
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2023년도 봄 학술논문 발표대회
    • /
    • pp.339-340
    • /
    • 2023
  • Steel construction is one of the commonly used methods in building construction due to its efficiency in terms of time and cost. In particular, the top-down method using steel frames is widely used in the construction of underground structures in urban areas to shorten the construction period. However, there is currently no standardized cost estimation for subway steel frame construction in Korea, causing difficulties in determining the expected cost. In this study, we aim to provide basic data for establishing a cost estimation standard for subway steel frame construction through on-site surveys of subway steel frame construction commonly used in urban areas.

  • PDF

현장시험 및 수치해석 분석을 통한 원지반 부착식 판넬옹벽의 현장 적용성 평가 (Evaluation of Field Application of Precast Concrete-panel Retaining Wall attached to In-Situ Ground Using Field Test and Numerical Analysis)

  • 권용규;민경남;황영철;반호기;이민재
    • 한국지반공학회논문집
    • /
    • 제36권12호
    • /
    • pp.99-106
    • /
    • 2020
  • 우리나라는 산지가 많은 지형적인 특성으로 교통의 편리를 위해 산지를 절취하여 변형시키는 공사가 매년 증가하고 있다. 특히 산지를 절치하여 변형시킬 경우 자연재해로 인한 사면 붕괴, 환경문제 등의 문제가 발생한다. 이러한 문제를 해결하고자 판넬식 옹벽, 보강토 옹벽 등의 다양한 보강공법이 있다. 하지만 Bottom-up방식의 경우 경사굴착으로 인한 추가 토공처리가 필요하며 되메움과 다짐불량에 의한 안정성 저하 등의 문제점을 지니고 있다. 따라서 본 연구에서는 기존 Bottom-up방식의 문제점을 해결하기 위해 Top-down방식에 대해 현장 적용시험 및 수치해석을 통해 안정성 분석을 수행하였으며, 대표단면을 선정하여 Bottom-up방식과 Top-down방식에 대해 안정성 비교분석하였다.

피스톤 방식의 고온·고압 뿜칠장치를 이용한 방수 시공 기술 공법에 관한 연구 (An Study on the Development of Waterproofing Execution Technology With high Temperature and Spray Equipments of Piston Type)

  • 문유석;최은규;최성민;곽규성;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2008년도 추계 학술논문 발표대회
    • /
    • pp.7-12
    • /
    • 2008
  • We constructed Seal type waterproofing with adhesive and swelling properties in the field of construction work as yet. But we have many problems of seal type waterproofing with adhesive and swelling properties for construction. Because it has high viscosity, so wokers are too adhered for the work. So, we developed and applied about the high temperature and spray equipments of piston type better than before. We able to be expect that cost reduction and increase construction ability by high temperature and spray equipments of piston type.

  • PDF

PRD시공시 H-PILE 대체 자재로 원가절감 할수 있는 공법 사례 (Downward Method of H-PILE Alternative Materials of Percusion Rotary Drill)

  • 이왕희;이일재;임시내
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2014년도 추계 학술논문 발표대회
    • /
    • pp.199-202
    • /
    • 2014
  • In recent years the downtown, Top-down method has been applied in a major method to solve the complaints due to noise, vibration, dust and safety issues such as cracking due to settlement when the excavation close to the building. Until it is installed underground permanent foundation, the Pre-founded Column is a pile foundation as well as a column to bear the upper construction load. The Pre-founded Column is constructed by PRD method generally. The EnP(Enlarging Pile) method can be expanded locally boring diameter of the embedment zone as compared to the PRD method existing general. Since the bearing capacity is increased by the boring diameter is expanded, the embedment length is reduced, the construction cost is reduced.

  • PDF

비경화성 점착 방수제와 보강메쉬를 이용한 지하 외방수 공법에 관한 연구 (A Study on the Outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity WaterproofBusiness)

  • 문유석;이신춘;권기주;오상근
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2009년도 춘계 학술논문 발표대회 학계
    • /
    • pp.213-217
    • /
    • 2009
  • Underground structures are built into concrete like a architecture and public works. Concrete has watertightness as such, But buildings are leaking from the cracks. Recently, construction method do a lot of close construction in the downtown area. So architects are using the method for the outer layer of a two-layer wall to save spaces. They have been using Top-down method and waterproof agent method and others to outer layer of a two-layer wall method. But, There are many leakage in underground structure from lack on requirements performance of materials. Therefore, I hope to test the outside Waterproof Method of Ground using Wire-mesh and Non-hardening Viscosity Waterproof. In addition to, I wish to apply as outside waterproof method for the section for the outer layer of a two-layer wall in underground structure.

  • PDF

열정! 건설현장을 찾아서 - 상생, 시스템, 자율 안전관리의 삼박자 완벽 조화, 롯데건설(주) 제주시티호텔 신축현장

  • 정태영
    • 안전기술
    • /
    • 제192호
    • /
    • pp.16-18
    • /
    • 2013
  • 국제관광도시로서의 명상을 돈독히 다지고 있는 제주도. 최근 이곳의 관광업 관계자들은 물론 지역주민들은 한껏 기대감에 부풀어 올로 있다. 바로 롯데건설(주)이 시공하는 제주시티호텔이 다음 달이면 준공될 예정이기 때문이다. 실제로 이곳은 제주도 내에서 가장 높은 건축물(90m)로 탄생하면서 랜드마크 역할을 톡톡히 할 것으로 전망되고 있다. 이곳 현장은 지난 2011년 8월 구 제주일보 사옥 철거공사를 시작으로 2011년 12월부터 TOP DOWN 및 UP-UP공법을 병행하여 토공, 골조공사를 본격적으로 착수했다. 현재는 공정율 85% 수준으로 건물외부 코깅작업 및 내부 인테리어 마감작업이 진행 중이다. 이곳이 특히 주목받고 있는 이유는 롯데건설(주)의 안전관리 기술력이 집약된 또 하나의 건축물이라는 평가를 듣고 있기 때문이다. 롯데건설(주) 관계자들은 이곳에 면세점과 호텔 등 다중이용시설이 들어서기 때문에 부실시공은 곧 대형안전사고를 불러온다는 인식을 바탕으로 빈틈없는 안전시공을 해나가고 있는 것이다. 이는 물론 현장 근로자들을 대하는 안전관리에도 고스란히 나타난다. 착공부터 현재까지 무재해 100만 시간을 앞두고 있다는 점이 이를 잘 증명한다. 안전으로 제주도의 새로운 명소를 건서래 나가고 있는 롯데건설(주) 제주시티호텔 신축현장을 찾아가 봤다.

  • PDF

도심지 여건을 고려한 지하구조물 공사사례의 시공기술요소에 관한 연구 (A study on the Applied Technology of a Case for Underground Structures Considering Downtown Site Conditions)

  • 이일재;맹은주;손혁;이종의;김형완
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2012년도 추계 학술논문 발표대회
    • /
    • pp.189-192
    • /
    • 2012
  • Underground structure construction in the downtown is very difficult despite the development of construction technology. We have been a lot of research in order to solve the problem, it was a remarkable achievement. But there are still many difficulties. This study is to analyze the construction technology to demolish the existing underground structures and to build new building applied topdown method at the same time. This technology was effective to suppress interference between the exsisting structure and new building. Therefore, this technology is expected to be able to be used in similar cases in the future.

  • PDF