A LETS (Local Exchange and Trading System) Policy Proposal for Revitalizing the Healthy Family Support Center's Family-Cooperative Activities (Pumasi) Project (건강가정지원센터의 가족품앗이사업 활성화를 위한 정책적 제안 - 지역화폐 도입을 중심으로-)

  • Cha, Sung-Lan
    • Journal of Family Resource Management and Policy Review
    • /
    • v.16 no.3
    • /
    • pp.67-82
    • /
    • 2012
  • The first local exchange trading system(LETS), established in Comox Valley in Canada, aimed at facilitating the regional economy. However, in Korea, LETS was adopted to encourage mutual aid and promote community spirit among residents. This study examines the feasibility of LETS as a revitalization initiative for Pumasi and suggests a number of policies that can be implemented to support the project. The findings are as follows: First, the LETS credit system was found to complement social capital initiatives among Pumasi participants in the early stages of the Pumasi project. Second, combining LETS and Pumasi initiatives was found to consolidate community spirit and encourage a cooperative way of life among participants due to the fact that LETS enlarges the scope of local residents' participation and diversifies the services being exchanged. A number of policy suggestions are made for combining LETS with Pumasi. First, the project must define a vision of its long-term purpose and outcomes. Second, local residents should be employed as assistants to facilitate the project. Third, Pumasi participants should ensure that childcare exchange services are of the highest quality by providing an educational program on parenting. Fourth, the project manager's employment conditions and working environments must be guaranteed.

  • PDF

Empirical Evaluation of BIM Coordinator Performance using Queuing Model in Construction Phase (대기행렬 모형을 활용한 시공단계 BIM 코디네이터 업무 성과 분석)

  • Ham, Nam-Hyuk;Yuh, Ok-Kyung;Ji, Kyu-Hyun
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.31-42
    • /
    • 2018
  • This study focuses on the BIM request for information(RFI) processing performance and quantitatively analyzes the performance of the BIM coordinator and the loss due to the waiting of the project participants. For these purposes, a method to quantitatively evaluate the performance of the BIM coordinator was proposed using a queueing model. For the verification, two projects in which BIM was applied in the construction phase were selected, and the BIM RFI data were collected through the analysis of the BIM monthly report and BIM coordinator work log of each project. In addition, the BIM input personnel, labor cost, and productivity data were collected through interviews with the experts of the case projects. The analysis of the BIM RFI processing performance of the BIM coordinator using the queueing model exhibited on a probabilistic basis that the waiting status of the project participants could vary depending on the preliminary BIM application to the design verification as well as the input number and level of the BIM coordinator personnel. In addition, the loss cost due to the waiting of the project participants was analyzed using the number of BIM RFIs waiting to be processed in the queueing system. Finally, the economic feasibility analysis for the optimal BIM coordinator input was performed considering the loss cost. The results of this study can be used to make decisions about the optimal BIM coordinator input and can provide grounds for the BIM return on investment (ROI) analysis considering the waiting cost of the project participants.

A Study on the Improvement and Actual Conditions of Terrestrial Vegetation Part in Environmental Impact Statement (환경영향평가서의 육상물상 부분의 작성실태및 개선방향에 관한 연구)

  • 강철기
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.25 no.3
    • /
    • pp.35-46
    • /
    • 1997
  • The objective of this study is to investigate actual conditions of terrestrial vegetation part in Environmental impact statement, and to prepare a proposal for the efficiency of Environmental Impact Assessment. 13 E.I.S.s made out during 1996.6-1997.5. have been chosen and analysed with respect to scope of survey, item of survey, method of survey, and result of survey. Actual conditioins of terrestrial vegetation part in E.I.S. are summarized as follows : 1. The mean number of total participants in drawing up E.I.S. is 26.0 persons, that of participants in terrestrial vegetation part is 2.3 persons. 2. In case of planar project, the mean of scope of survey is 16.1 times as large as area of project . In case of linear project, the scope of survey has been determined arbitrarily. 3. The most part of survey has been dependent on literature, and field survey has been practically neglected. 4. Results of survey mostly missed the point that E.I.A. pursues. And proposals are as follows : 1. Participants in terrestrial vegetation part in drawing up E.I.S should be increased. 2. It is necessary to subdivide scope of survey in view of difference between planar project and linear project. 3. As for item and method of survey, field survey should be specially reinforced. 4. Several sheets of map as results of survey should be included in E.I.S. The vegetation map, the D.G.N. map, and the planting map should be included and drawn by smaller scale as possible.

  • PDF

Influencing Factors on the Duration of Offset Agreement (절충교역 계약 소요기간 영향요인)

  • Hong, Seok-Soo;Joung, Tae-Yun;Seo, Jae-Hyun;Hong, Moon-Hee
    • Journal of Technology Innovation
    • /
    • v.20 no.1
    • /
    • pp.1-15
    • /
    • 2012
  • Republic of Korea has been applying offset to defense acquisition program for some benefits such as modernization of defense industry and enhancement of R&D capabilities since 1983. But in point of implementation, there is the possibility of delay of offset agreements based on the value of proposed technologies. As it often happens that the delay of offset agreement negatively affects the time schedule of main defense deal, it is necessary to prepare for this issue. The purpose of this study is to extract some factors affecting the duration of offset agreement by statistical analysis. Reviewing existing papers and contract process, nationality of enterprise, the number of project participants, properties of project, the number of technologies in the first proposal, level of domestic defense technology in each weapons system, the amount of main contract were used as independent variable and duration of agreement as dependent variable. To hypothesis testing, correlation and multiple regression analysis were conducted using the previous 25 contract cases. As a result of correlation analysis, the amount of main contract, the number of technologies in the first proposal and properties of project have positive relationships with dependent variable. In multiple regression, the amount of main contract and the number of project participants have significant effect on the duration of offset agreement.

  • PDF

A Model of Risk Management Plan in the Development Phase of Urban Regeneration Project

  • Kim, Seon-Gyoo
    • Architectural research
    • /
    • v.11 no.2
    • /
    • pp.35-42
    • /
    • 2009
  • Recently, intensive urban redevelopment concentrated on new towns has reduced the number of settled population, and weakened various functions such as commercial, culture, education and welfare in old towns, and made the stagnation and declination of the entire or some parts of old towns. Urban regeneration project means renewing cities' functions in terms of physical, environmental, social, cultural, industrial and economic aspects or revitalizing the existing functions through improvement project in the entire or part of a city, which is now drawing keen attention from the public. However, urban regeneration project is huge in scale, needs long construction period and various complex facilities, and also characterized by complicated relations with many stakeholders. Due to such characteristics, there are many risks in the project. Therefore, systematic risk management is absolutely necessary to efficiently manage various risk factors inherent in urban regeneration project. The purpose of this research proposes a basic model to establish risk management plan and work process in order to help project participants to perform risk management more systematically and rationally in the development phase of urban regeneration project.

Steel Plant Construction (EPC) Project Case Study : Forensic Lessons-learned Analysis and Systems Engineering Improvement Recommendation

  • Kyung-Bae Jin;Young-Ho Kim;Eul-Bum Lee;Suk-Hwan Seo
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.145-150
    • /
    • 2013
  • As a recent global trend, the majority of mega-size plant projects are delivered through EPC (Engineering, Procurement and Construction) contracts, where a single contract is awarded for engineering, procurement, and construction. Under this contracting mechanism, it is challenging for contractors to carry out the projects under traditional project management processes used in design-bid-build projects. A new EPC Plant, the POSCO Special Steel Plant in Changwon, was built successfully at the beginning of 2012 and it is currently in full-scale production. The project has encountered a number of major difficulties however, with some technical and managerial issues through its development process. As summarized in this paper, the authors (as project participants with the contractor) investigated it as a post construction analysis and recorded the Lessons-learned for future project management improvement.

  • PDF

A Study on Proposal to improve Domestic Construction Management Service Guide (국내 건설사업관리 업무지침의 개선(안)에 관한 연구)

  • Na, Kwang-Tae;Ryoo, Boong-Yeol;Kang, Byeung-Hee
    • Journal of the Korea Institute of Building Construction
    • /
    • v.2 no.3
    • /
    • pp.147-154
    • /
    • 2002
  • The Korean government makes an effort to raise the competitive power of nation through CM activation in the construction industry. Since the first CM service was applied to the atomic power plant project in 1986, the number of CM contracts are continuously being increased and will be up to 20% by 2002 in public sector. However, the public projects had been executed without any procedure manual or standard guideline of CM services. Meanwhile the Ministry of Construction and Transportation issued $\ulcorner$CM Service Guide$\lrcorner$, but the guide shows an indefinite description in the responsibility, authority and scope of activity for the project participants. Therefore, it is required the procedures be improved and scope of activities be established for the project participants. This study was generated from the comparative analysis of $\ulcorner$Standard CM Services and Practice$\lrcorner$ Published by CMAA and domestic $\ulcorner$CM Service Guide$\lrcorner$ and the case of Incheon International Airport construction. The purpose of this study is to provide the fundamental data for an improvement in the procedures of project execution and the construction manager's activities/rolls shown on $\ulcorner$CM Service Guide$\lrcorner$

Effects of Interdisciplinary R&D on Technology Commercialization (다학제적 연구개발이 기술사업화에 미치는 영향에 관한 연구)

  • Baek, Seung-Hee;Lee, Hokyu
    • Journal of Convergence for Information Technology
    • /
    • v.9 no.1
    • /
    • pp.28-37
    • /
    • 2019
  • Various fields are being combined and developed for the development of the country and industry. The purpose of this study is to examine the effects of interdisciplinary research on the technology commercialization of researchers in the national R&D project. For the purpose of empirical analysis, major research and development have been reviewed. Major research and development projects conducted by government-funded research institution in which various technological fields are integrated in order to commercialize technology. The research data is based on the major R&D project data for railway/public transportation/logistics fields technology in 2015-17, and 149 project were selected for analysis. As a result, it was found that diversity of participants' experts had significant positive effect on technology commercialization when R&D expense, The number of research participants, The number of participating organizations, TRL before R&D were controlled. It is expected that the results of this study will be used meaningfully when the R&D program plan, analysing the academic convergence factor of research topic.

Comparison of medical use and medical expenses between participants and non-participants in the home-based care pilot project for rehabilitation patients (재활환자 재택의료 시범사업 참여자와 미참여자의 의료이용 및 진료비 비교)

  • Ji Man Kim;Sang Gyu Lee;Young Geon Ji
    • Korea Journal of Hospital Management
    • /
    • v.29 no.3
    • /
    • pp.1-10
    • /
    • 2024
  • Purposes: When rehabilitation services are provided remotely using information and communication technologies to patients living at home, there is an advantage in providing rehabilitation services to individuals in their everyday social and physical environment, which can improve functional outcomes and satisfaction. The purpose of this study was to analyze the effectiveness of the pilot project by analyzing the outpatient and inpatient medical use and expenses of patients who participated in the rehabilitation patient home-based care pilot project. Methodology: To analyze the effectiveness of the home-based care pilot project for rehabilitation patients, health insurance claims data from the Health Insurance Review and Assessment Service was used. The subjects of analysis were patients who had undergone major lower extremity joint replacement surgery, including hip, knee, and ankle joint replacement surgery, and patients who had lower extremity fracture surgery, which were the targets of the rehabilitation patient home-based care pilot project. To compare medical use and expenses between patients participating in the rehabilitation patient home-based care pilot project and those not participating, chi-square test, t-test, and multiple regression analysis were performed. Findings: As a result of analyzing the number of medical use cases and expenses of patients who participated and those who did not participate in the rehabilitation patient home-based care pilot project, the average outpatient medical use and outpatient medical expenses per person for participating patients were lower than those for patients who did not participate. The average hospitalization cost per person and the average length of stay per person were also lower than those of patients who did not participate. Practical Implications: Home-based care for rehabilitation patients continues to provide medical services at home, not at medical institutions, and can be expected to reduce readmissions and complications by resolving patients' emergency situations at home or on their own, thereby reducing medical use.

  • PDF

Performance Analysis of BIM Labor using Case Analysis (사례분석을 활용한 시공단계 BIM 인력 투입 성과 분석)

  • Kim, Hyoung-Jin;Yoo, Moo-Young;Kim, Jae-Jun;Choi, Chang-Shik
    • Journal of KIBIM
    • /
    • v.7 no.3
    • /
    • pp.31-39
    • /
    • 2017
  • BIM is effective to improve the labor productivity of construction participants. From this point of view, it is important to analyze the outcome related with BIM Labor which covers most of the BIM investment costs. This research focuses on BIM RFI which is one of the major task of the BIM labor and analyze the outcomes. In addition, this research was quantitatively analyzed by the standby time and related cost caused by BIM labor, which affect the results of the project participants. To this end, analytical standby queue model was utilized to analyze the labor focusing on micros TASK. 11 projects were selected to analyze the results of BIM labor and RFI that the project participants requested to the BIM labor was collected. Through this, it collected variables for analyzing results, and Finally, we pulled out 4 projects for analysis. In this study, the basic results analysis of RFI processing of the BIM labor, the probabilistic analysis of BIM labor service status, and the economic analysis of BIM labor optimal inputs were performed by using the research model presented. The results of this study can be utilized to formulate the optimal strategy for BIM labor inputs(e.g. number of employees, level, time point, etc.) of the construction phase. Moreover, it can contribute to ensuring the credibility of the BIM ROI results by presenting the cost of BIM services in BIM ROI analysis and the standby cost of project participants.