• Title/Summary/Keyword: Technical Manpower in Construction

Search Result 32, Processing Time 0.033 seconds

A Study on the Supply and Demand of Technical Manpower in Construction (건설기술인력의 수급효율화 방안 연구)

  • Park Hwan-Pyo;Ji Sang-Wuk;Lee Kyo-Sun;Park Sang-Hoon
    • Korean Journal of Construction Engineering and Management
    • /
    • v.3 no.3 s.11
    • /
    • pp.58-65
    • /
    • 2002
  • University graduates from construction-related departments are undergoing serious difficulties in getting a job as construction companies are reluctant to employ new personnel due to the depression in the construction industry which has been downscaled in both domestic and overseas markets. In the situation is like this, statistics show that the percentage of employment among the university graduates is less than $25\%$, the unemployment problem in the construction sector has started to demand urgent countermeasures. This report anticipated demand and supply for technical man power in the field of construction in between 2002-2008. For preparation of an effectiveness of supply and demand plan on over-supplied in construction technical man power, this suggested expansion of SOC investment, induced into IT field of unemployed construction manpower, enlargement of overseas construction manpower And this considered an elastic operation of curriculum related to construction, and arranged an excess supply and demand of construction technical manpower, which has been considered to education that will meet with demand of enterprise, etc. on both side of quantity and quality simultaneously.

Problem Analysis and Improvement for Technicians Operation in Specialized Construction Firms by machinery&equipment services (기계설비 전문건설업에서의 기능인력 운영상의 문제점 분석 및 개선방안에 관한 연구)

  • Kim, Yun-Su;Bae, Sung-Ryul;Kim, Yong-Su
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2008.11a
    • /
    • pp.455-458
    • /
    • 2008
  • The purpose of this study is to analyze technical manpower management problems that were made by specialized construction company, centering on the field of machinery and equipments, to offer an improvement of technical manpower management. For this study, the adapted research method select owners&foremans on 18 specialized construction company by machinery&equipment services and on-site supervisors on general contractor and then investigate the problem of contract and subcontract by survey. After analyzing the actual state of management, it present an improvement of technical manpower management. The results of this research are as follows. 1) It is analyzed foreman had a number of difficulty for dealing manpower management because of subordinate relationship between supervisor and foreman. 2) The improvement of technical manpower management is concluded that foreman is to be on- site proxy supervisor or to be hired by an annual salary.

  • PDF

The Forecasting of Market Size and Additional Requirement of Technical Manpower in Korean Engineering Industry (우리나라 엔지니어링산업의 시장전망과 기술인력 필요공급량 추정에 관한 연구)

  • 최정호;박수신;김지수
    • Proceedings of the Technology Innovation Conference
    • /
    • 1997.12a
    • /
    • pp.177-196
    • /
    • 1997
  • The engineering industry plays an important role for national competitive, since it has an high impact on other industries. With its importance, the engineering industry development largely depends on its technical manpower ather than capital factor. This study aims at estimating the additional requirement on technical manpower based on the forecasted market size which represents the structure change corresponding to economic growth in related industry. Research scope includes the twelve of fifteen field except three with insufficient historical data and technical manpower above bachelor degree. Specialty, we forecast market size with determinants resulted from historical data analysis on each field. The demand on technical manpower is derived from the forecasted market. We also estimate an additional requirement with the supply analysis. The research results show different patterns over time period. The relative ratio on chemical and construction to total market will steadily grow over short term, while applied, environment, electronic and information will rapidly grow This pattern will be stabilized over mid or long term. The additional requirement on technical manpower represents the similar pattern to market growth. The research result implies manpower policy for having high inflow of technical engineer from educational institute and the related industries through the image improvement.

  • PDF

The Study on Imbalance for Labor Supply and Demand in Electrical Construction Business : Simulating the Supply and Demand Gap of Technical Engineer (전기공사업 노동시장의 인력수급 불균형에 관한 연구: 기술·기능인력의 수급격차에 대한 시뮬레이션)

  • Park, Houng-Hee
    • Korean System Dynamics Review
    • /
    • v.14 no.3
    • /
    • pp.105-134
    • /
    • 2013
  • Electrical construction business has public and professional characters. It may require appropriate interventions of the government because these business activities stand for not only profit-seeking competition, but also supplies of one of the key functions in our society. In other words, public benefit and private benefit are still in existence. The government therefore considers such an aspect of public importance of the business sector and needs to plan to adjust technical and engineering manpower of this market. This study focuses on the imbalance for labor supply and demand of technical engineer in electrical construction business. A system dynamics analysis is applied to understand and simulate the imbalance as a soft approach. It has the merit of causal loop diagram to alleviate the limitation of data lack problem. We find that excess demand is expected from 2010 to 2011, and excess supply is predicted from 2012 to 2021 about the manpower of technical engineer. It shows considerable disagreement between the supply and demand of human resource. So we suggest that it is strong necessity to construct statistics infrastructure for a manpower supply and demand plan.

  • PDF

Labor market forecasts for Information and communication construction business (정보통신공사업 인력수급차 분석 및 전망)

  • Kwak, Jeong Ho;Kwun, Tae Hee;Oh, Dong-Suk;Kim, Jung-Woo
    • Journal of Internet Computing and Services
    • /
    • v.16 no.2
    • /
    • pp.99-107
    • /
    • 2015
  • In this era of smart convergent environment wherein all industries are converged on ICT infrastructure and industries and cultures come together, the information and communication construction business is becoming more important. For the information and communication construction business to continue growing, it is very important to ensure that technical manpower is stably supplied. To date, however, there has been no theoretically methodical analysis of manpower supply and demand in the information and communications construction business. The need for the analysis of manpower supply and demand has become even more important after the government announced the road map for the development of construction business in December 2014 to seek measures to strengthen the human resources capacity based on the mid- to long-term manpower supply and demand analysis. As such, this study developed the manpower supply and demand forecast model for the information and communications construction business and presented the result of manpower supply and demand analysis. The analysis suggested that an overdemand situation would arise since the number of graduates of technical colleges decreased beginning 2007 because of fewer students entering technical colleges and due to the restructuring and reform of departments. In conclusion, it cited the need for the reeducation of existing manpower, continuous upgrading of professional development in the information and communications construction business, and provision of various policy incentives.

Proposal of improvement measures according to the limiting factors of the use of drone technology : Cases in the construction field

  • Yoo, Soonduck
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.13 no.4
    • /
    • pp.30-38
    • /
    • 2021
  • This research explored methods for improvements to be made within the field of drone usage within the construction industry based on an investigation of factors which limit their efficiency and productivity. Limiting factors and improvement measures were presented in terms of technology, service, law and policy for employing drones at construction sites. Our first suggestion is, from a technical point of view, that companies need to expand professional manpower and infrastructure for systematic management. Second, in terms of service expansion, it is necessary to have management capabilities for operation such as the use of drones with enhanced safety and reinforced on-site education and personal information management. Third, in terms of legal and institutional support measures, it is necessary to prepare a plan for reforming the legal system for revitalization and to expand the training of professional manpower. This study may contribute not only to the development of drone technology, but also to effectively respond to various problems that appear at construction sites.

A Technical Analysis of Real Time Location System for Automation in Construction (건설작업 자동화를 위한 실시간위치추적시스템 분석)

  • Kim, Kyoon-Tai
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2009.11a
    • /
    • pp.15-18
    • /
    • 2009
  • Due to its high dependency of manpower, construction work has several difficulties in terms of quality control, imbalance of supply and demand of qualified manpower, safety management for them and improvement of production. Such problems related to the management can be at some degree solved by introducing an automation facility. Since the unique environment of a construction site in the past was not structured, it is very hard to introduce a facility to automate construction work from operation of the equipment to assignment of where to work. This is a preliminary research for automation of construction work. In this study, the trend of development of a cutting-edge technology, RTLS, was researched and analyzed in order to review the possibility of utilizing RTLS in construction work and present a control mechanism for construction equipment. Although the presented mechanism is at the concept stage, which still has lots of restrictions to be solved, the application of the RTLS will be very much feasible. That is, if linkage of the study between the RTLS and the automation of construction is built, it will be expected to contribute to many fields such as cost reduction through efficient and systemic management, the reduction of construction period and precise construction as well as raising the level of the automation of domestic construction work.

  • PDF

A Study on the Recognition of Fire Construction Surveillance System : Focused on the Stakeholders (소방공사감리제도의 인식에 관한 연구 : 이해당사자를 중심으로)

  • Lee, Ranny;Jeong, Kyeon-Sik;Kong, Ha-Sung
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.133-143
    • /
    • 2014
  • The purpose of this article is to search stakeholders' recognition related to Fire Construction Surveillance system; a client(order), fire fighting officer, supervision company, construction company, design company, other. The paper provides 4 important things. Firstly, a client(order) suggested the lowest recognition in the needs about the need of separation order, that of contract for any construction work limited registered companies, and that of standard price for engineering.. Secondly, the design company is lowest recognition in guidance and control participating in construction-design phase. Thirdly, the design company is lowest in adjustment about manpower-allocation according to allocation criteria of technical manpower. Fourthly, a client(order) and supervision company are relatively lower than other stakeholder in necessity on special education and training system for auditor in fire protection construction. Almost all related matters are related to more or less stakeholders' interest.

A Study on the Standard of Estimate for Vitalizing the Natural Environment Restoration Industry (자연환경복원산업 활성화를 위한 표준품셈 연구)

  • Jin, Ki Jung;Koo, Bonhak
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.16 no.2
    • /
    • pp.23-40
    • /
    • 2013
  • The natural environment restoration industry has been newly included in the environment area of engineering technology. Accordingly, the enactment of a standard of estimate for determining the 'Cost plus Fixed Fee' method has become necessary for the implementation and vitalization of natural environment restoration projects. The purpose of this study is to determine the standards for which the prices for engineering projects are calculated with respect to the enactment of an engineering project standard of estimate in the natural environment restoration field. These include the scope of the technological work, standard area, manpower requirements by technical grade that are necessary for carrying out the technological tasks. Relevant laws and regulations, systems and precedent case studies were investigated and analyzed to establish a price calculation standard. The overall results of the analysis were used and applied to questionnaires, public hearings, and expert delphi techniques. The study showed the following results: The scope of the technological work was categorized into 'Biotopes', 'Eco-corridors' and 'Ecological restoration'. The standard area was set up as $1,000m^2$ for 'Biotopes' and $5,000m^2$ for 'Eco-corridors' and 'Ecological restoration'. The manpower requirements by technical grade that are necessary for carrying out the technological tasks were determined. The suitability of the costs, standard area, manpower requirements by technical grade of ordered engineering projects that are determined by applying the standard of estimate for natural environment restoration that may be enacted pursuant to this study may be effectively investigated and analyzed. Moreover, further studies on the calculation of standard prices that can ensure the stability of natural environment restoration projects will be necessary.

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF