• Title/Summary/Keyword: Technical Architecture

Search Result 953, Processing Time 0.058 seconds

Development of Foundation Structure for 8MW Offshore Wind Turbine on Soft Clay Layer (점토층 지반에 설치 가능한 8MW급 해상풍력발전기 하부구조물 개발)

  • Seo, Kwang-Cheol;Choi, Ju-Seok;Park, Joo-Shin
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.27 no.2
    • /
    • pp.394-401
    • /
    • 2021
  • The construction of new renewable energy facilities is steadily increasing every year. In particular, the offshore wind farm market, which has abundant development scalability and a high production coefficient, is growing rapidly. The southwest sea has the highest possible offshore wind power potential, and related projects are to be promoted. This study presents a basic design procedure by the EUROCODE and considers structural safety in the development of an effective of shore wind foundation in the clay layer. In a previous study, the wind power generator of 5MW class was the main target, but the 8MW of wind turbine generator, which meets the technical trend of the wind turbine market in the Southwest sea, was selected as the standard model. Furthermore, a foundation that fulfills the geological conditions of the Southwest sea was developed. The structural safety of this foundation was verified using finite element method. Moreover, structural safety was secured by proper reinforcement from the initial design. Based on the results of this study, structural safety check for various types of foundations is possible in the future. Additionally, specialized structural design and evaluation guidance were also established.

A Study on the Determination of Minimum Welding Condition Based on Structural Strength under Launching for Tandem Blocks (선체 블록 진수 시 필요한 최소 용접 구조 강도 평가에 관한 연구)

  • Myung-Su Yi;Joo-Shin Park
    • Journal of the Korean Society of Marine Environment & Safety
    • /
    • v.28 no.7
    • /
    • pp.1267-1273
    • /
    • 2022
  • Although the Korea shipbuilding industry has recently been receiving most of the orders for ships in the world, production processes are being disrupted due to a shortage of manpower at the production site. This is because the workers quit the shipyard as both work and wages were reduced due to the long slump in the shipbuilding industry. The main reason for the increase in orders was the large-scale orders for Qatar LNG carriers, and the situation in which the technical specifications required for ships are becoming more complex is also working to an advantage. Because the contract delivery time is of utmost importance for ships, the dock launch plan is the most important management item among the shipyard's major processes. The structure to be built in the dock may be a hull that has left the design work or a finished vessel, and in some cases, it is often at the level of some blocks of the hull. When launching, the hull is affected by the hogging or sagging moment due to the fluid force, and securing the safety of the structural strength of the block connection is of utmost importance. In a normal process, the connecting member launches after welding has been completed, but in actual shipbuilders, quick decision-making is needed on the conditions for securing structural safety to comply with the docking schedule. In this study, a detailed analysis method and applicability using a bending stress evaluation method and finite element analysis modelling were analyzed to rationally judge the above-mentioned problems from an engineering point of view. The main contents mentioned in the thesis can be used as good examples when conducting similar structural strength evaluations in the future.

How to automatically extract 2D deliverables from BIM?

  • Kim, Yije;Chin, Sangyoon
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1253-1253
    • /
    • 2022
  • Although the construction industry is changing from a 2D-based to a 3D BIM-based management process, 2D drawings are still used as standards for permits and construction. For this reason, 2D deliverables extracted from 3D BIM are one of the essential achievements of BIM projects. However, due to technical and institutional problems that exist in practice, the process of extracting 2D deliverables from BIM requires additional work beyond generating 3D BIM models. In addition, the consistency of data between 3D BIM models and 2D deliverables is low, which is a major factor hindering work productivity in practice. To solve this problem, it is necessary to build BIM data that meets information requirements (IRs) for extracting 2D deliverables to minimize the amount of work of users and maximize the utilization of BIM data. However, despite this, the additional work that occurs in the BIM process for drawing creation is still a burden on BIM users. To solve this problem, the purpose of this study is to increase the productivity of the BIM process by automating the process of extracting 2D deliverables from BIM and securing data consistency between the BIM model and 2D deliverables. For this, an expert interview was conducted, and the requirements for automation of the process of extracting 2D deliverables from BIM were analyzed. Based on the requirements, the types of drawings and drawing expression elements that require automation of drawing generation in the design development stage were derived. Finally, the method for developing automation technology targeting elements that require automation was classified and analyzed, and the process for automatically extracting BIM-based 2D deliverables through templates and rule-based automation modules were derived. At this time, the automation module was developed as an add-on to Revit software, a representative BIM authoring tool, and 120 rule-based automation rulesets, and the combinations of these rulesets were used to automatically generate 2D deliverables from BIM. Through this, it was possible to automatically create about 80% of drawing expression elements, and it was possible to simplify the user's work process compared to the existing work. Through the automation process proposed in this study, it is expected that the productivity of extracting 2D deliverables from BIM will increase, thereby increasing the practical value of BIM utilization.

  • PDF

3D Architecture Modeling and Quantity Estimation using SketchUp (스케치업을 활용한 3D 건축모델링 및 물량산출)

  • Kim, Min Gyu;Um, Dae Yong
    • Asia-pacific Journal of Multimedia Services Convergent with Art, Humanities, and Sociology
    • /
    • v.7 no.6
    • /
    • pp.701-708
    • /
    • 2017
  • The construction cost is estimated based on the drawings at the design stage and constructor will find efficient construction methods for budgeting and budgeting appropriate to the budget. Accurate quantity estimation and budgeting are critical to determining whether the project is profitable or not. However, since this process is mostly performed depending on manpower or 2D drawings, errors are likely to occur and The BIM(Build Information Modeling) program, which can be automated, is very expensive and difficult to apply in the field. In this study, 3D architectural modeling was performed using SketchUp which is a 3D modeling software and suggest a methodology for Quantity Estimation. As a result, 3D modeling was performed effectively using 2D drawings of buildings. Based on the modeling results, it was possible to calculate the difference of the quantity estimation by 2D drawing and 3D modeling. The research suggests that the 3D modeling using the SketchUp and the calculation of the quantity can prevent the error of the conventional 2D calculation method. If the applicability of the research method is verified through continuous research, it will contribute to increase the efficiency of architectural modeling and quantity Estimation work.

Analysis on On-line Q&A Cases regarding Landscape Trees Management - Focused on Online Consultation Board at Tree Diagnostic Center - (조경수 관리에 관한 온라인 질의응답 사례 분석 - 수목진단센터 온라인 상담 사례를 대상으로 -)

  • Lim, Byoung-Eul;Lee, Sae-Hee
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.41 no.1
    • /
    • pp.44-50
    • /
    • 2013
  • The persons in charge of management request diagnosis and prescription to tree hospitals in order to get consultation about the problems like blight that occur in landscape tree management. This study aims to analyze what the main problems and questions raised by landscape gardeners are and those concerned in landscape tree management. This is done by investigating landscape tree-related questions and answers uploaded on the online consultation boards of the plant diagnostic centers approved in Korea including the Seoul National University Plant Clinic, the Chungbuk National University Plant Hospital, and the Kangwon Diagnostic Center. As a result, those concerned in landscape occupied the most as 81.4% among the questioners. However, only 11.5% did explain the plant management history or surrounding environment, which is essential for landscape tree diagnosis when asking questions. This shows that those concerned in landscape lack basic knowledge or interest about plant diagnosis. Among 263 questions about landscape trees, questions about physiological damage included 94 cases that were the most taking up 35.8%. Moreover, the next were damage by insects and damage by disease in order. It is thought that due to the characteristics of physiological problems that occur by various sorts of stress and with no signs, they tend to request diagnosis or prescription the most. The most frequent reasons for physiological damage are water stress and temperature stress. About damage by disease, there exist many types of diseases, and there are many complex damages accompanied by physiological causes. About damage by insects, the most common include damage by moths. In consideration of this result, universities or technician training centers should provide education for landscape tree management so that landscape technicians and students can acquire essential knowledge and information about landscape tree management and increase their interest in it. In particular, it is necessary to provide profound learning opportunities for plant physiology, and the technicians should make efforts themselves. In addition, it is needed to build organizations to which they can ask technical questions about landscape planting and management in order to understand landscape industry in general and the actual status of landscape planting technique and the actual field. Moreover, to elevate systemicity and expertise in the area of landscape tree management not yet equipped with the foundation, it is needed to cultivate the technicians intensively and conduct research by those concerned both in academic and industrial circles.

Derivation of Green Infrastructure Planning Factors for Reducing Particulate Matter - Using Text Mining - (미세먼지 저감을 위한 그린인프라 계획요소 도출 - 텍스트 마이닝을 활용하여 -)

  • Seok, Youngsun;Song, Kihwan;Han, Hyojoo;Lee, Junga
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.5
    • /
    • pp.79-96
    • /
    • 2021
  • Green infrastructure planning represents landscape planning measures to reduce particulate matter. This study aimed to derive factors that may be used in planning green infrastructure for particulate matter reduction using text mining techniques. A range of analyses were carried out by focusing on keywords such as 'particulate matter reduction plan' and 'green infrastructure planning elements'. The analyses included Term Frequency-Inverse Document Frequency (TF-IDF) analysis, centrality analysis, related word analysis, and topic modeling analysis. These analyses were carried out via text mining by collecting information on previous related research, policy reports, and laws. Initially, TF-IDF analysis results were used to classify major keywords relating to particulate matter and green infrastructure into three groups: (1) environmental issues (e.g., particulate matter, environment, carbon, and atmosphere), target spaces (e.g., urban, park, and local green space), and application methods (e.g., analysis, planning, evaluation, development, ecological aspect, policy management, technology, and resilience). Second, the centrality analysis results were found to be similar to those of TF-IDF; it was confirmed that the central connectors to the major keywords were 'Green New Deal' and 'Vacant land'. The results from the analysis of related words verified that planning green infrastructure for particulate matter reduction required planning forests and ventilation corridors. Additionally, moisture must be considered for microclimate control. It was also confirmed that utilizing vacant space, establishing mixed forests, introducing particulate matter reduction technology, and understanding the system may be important for the effective planning of green infrastructure. Topic analysis was used to classify the planning elements of green infrastructure based on ecological, technological, and social functions. The planning elements of ecological function were classified into morphological (e.g., urban forest, green space, wall greening) and functional aspects (e.g., climate control, carbon storage and absorption, provision of habitats, and biodiversity for wildlife). The planning elements of technical function were classified into various themes, including the disaster prevention functions of green infrastructure, buffer effects, stormwater management, water purification, and energy reduction. The planning elements of the social function were classified into themes such as community function, improving the health of users, and scenery improvement. These results suggest that green infrastructure planning for particulate matter reduction requires approaches related to key concepts, such as resilience and sustainability. In particular, there is a need to apply green infrastructure planning elements in order to reduce exposure to particulate matter.

A Study on Current Status of Landscaping Supervision Quality Control and Improvement Measures in Apartment House Construction (공동주택 건설사업에서 조경 감리의 품질관리 현황과 개선방안 연구)

  • Kim, Jung-Chul
    • Journal of the Korean Institute of Landscape Architecture
    • /
    • v.49 no.1
    • /
    • pp.1-18
    • /
    • 2021
  • This study was intended to present measures for the improvement of the apartment house landscaping supervision system by examining the adequacy of landscaping supervision, which is aimed at improving the quality of landscape plants and facilities in apartment house landscaping sites. Additionally, this study aims to identify the problems occurring in the process of the performance of landscaping supervision and to provide the evidence for legislative activities and revision of the laws currently being pushed forward for the mandatory deployment of apartment house landscaping supervision personnel. The results of the analysis showed that no landscaping supervision personnel was deployed to apartment complexes with less than 1,500 households and that the landscaping comprised 19% to 46% of the entire construction process. The civil engineering firm performed the landscaping supervision, which made it impracticable to fully focus on the construction quality in the field of landscaping. The quality control in terms of landscape plants revealed differences in quality control, depending on the competence and experience of the civil engineer supervising the personnel, where the landscaping supervision personnel was not deployed. The apartment houses landscaping supervision activity index was analyzed, and the results showed that the supervision activity index for apartment house A was 72.0, B was 70.4, and apartment houses C to G ranged from 38.7 to 46.9, which suggested that the difference in quality control, process control, and technical support affected the construction quality and occurrence of defects.The improvement of landscaping process quality control and process management will be carried out more smoothly and the rate of defects will be drastically reduced if the landscaping supervision personnel placement threshold is lowered from 1,500 households to 300 households in complexes. The results of this study are expected to be useful in promoting and re-establishing the landscaping industry based on the improvement of construction quality in the field of landscaping in connection with the construction of apartment houses.

A Composition and Role of Urban Water System in Connection with Historic City Structure - Focusing on Gyeongju, Gaegyeong, Hanyang, and Suwon Hwaseong - (역사도시구조와 연계한 도시수체계의 구성형태와 역할에 관한 연구 - 경주, 개경, 한양, 수원화성을 중심으로 -)

  • Kang, In-Ae;Lee, Kyung-Chan
    • Journal of the Korean Institute of Traditional Landscape Architecture
    • /
    • v.39 no.4
    • /
    • pp.99-110
    • /
    • 2021
  • This study intends to examine the characteristics of the construction method of the urban water system in the historical cities of Korea, focusing on Gyeongju, Gyeongju, Goryeo, Hanyang, and Suwon Hwaseong, which were created as new towns in the late Joseon Dynasty. It examines the meaning of waterways in connection with the urban skeletal structure, focusing on the location of cities, roads, and arrangement of urban facilities, and analyzes the compositional form of the water system. We tried to derive the relationship with the structure. In particular, it can be seen that water and natural water systems act as key factors in determining the location of a city, and have a close relationship with the urban structure, urban development process, and urban structure. In addition to the symbolic meaning of water in harmony with the geographical concept, realistic demands in terms of water level and water retention are an important background. In order to respond to various demands related to water space, various planning and technical elements for managing water space were introduced in the process of city formation and development. The planning elements of the urban water system in the process of urban formation and development are summarized as follows through the analysis of the research site. First, in the process of building the urban water system in Gyeongju, Goryeo, Goryeo, Hanyang, and Hwaseong, Suwon, which were selected as the research destinations, the water system in consideration of drainage and disaster is common, but the water system construction method and usability are common. shows the difference. Second, water and natural water systems act as symbolic elements to secure the legitimacy of the city location, and as a key factor in determining the location of the city in harmony with the geographical concept and determining the left direction of the city. Third, the natural water system prior to the formation of a city works as a basis for determining the compositional form of the urban water system constructed in the process of urban formation and development in harmony with the topographical conditions. Fourth, the urban water system built on the basis of natural water systems is constructed by linking natural waterways and planned artificial waterways. Fifth, the urban water system is being built in a planned manner in consideration of the utility in connection with the urban structure, such as securing of urban land, arrangement of urban facilities and areas, composition of functional areas, and land division, in addition to the perspective of drainage system and flood control in consideration of disasters.

A Study on the Architectural Characteristic Jang-Dae of Castle in the Joseon Dynasty (조선시대 성곽 장대의 건축특성에 관한 연구)

  • Kim, Ki-hyeon;Chang, Hun-duck
    • Korean Journal of Heritage: History & Science
    • /
    • v.48 no.2
    • /
    • pp.120-141
    • /
    • 2015
  • This paper is a preliminary study of architectural characteristics of Jangdae (general's podium), which shows one of the technical changes in fortification of Joseon Dynasty. As a facility for commands of generals and training for officers and men, it was located inside a fortress. Although it is not certain when the first Jangdae was built, the number of them dramatically increased around 18th century. Since the top priority function of the Jangdae was the prospect, it was installed at the hilly spot with open architecture. In addition, the open structure of Eupseong fortress towers on the riverside banks could simultaneously offer the functions as viewing around and Jangdae. Since Jangdae was also a place for military drills and reviews of soldiers, a wide podium was positioned at the front to muster the soldiers. This feature was standardized in the space organization of Jangdae in Joseon, and a mere podium was installed unless the topographic restrictions allows enough space. On the other hand, as a place for a commander, the hierarchy of the Jangdae was revealed through a variety of architectural characteristics. The hierarchy was assigned to the commander's space through the altitude difference, and diverse ornaments were added to show a sense of class. The floor plan of the Jangdae building can be largely categorized into rectangle and square, and the typical sizes of the former are $5{\times}4$ Kans (traditional measuring unit between two columns) and $3{\times}2$ Kans. Out of these two types, buildings of $5{\times}4$ Kans were found in flat land and eupseong fortresses with large space, and the relatively smaller ones of $3{\times}2$ Kans in mountain fortresses. All buildings of square floor plan had $3{\times}3$ Kans style, and the center Kan was twice wider than the side Kan to make the central space wide. It seems that the purpose was to secure the interior space of the upper story because the center Kan accounts for the floor area of the upper story. Some Jangdae's had internal story to form overhead space. The multi-roofed tower style with eaves attached to the upper and lower story is found exclusively in Jangdae. The buildings shows the Onkanmulim style which extends Naejinju (inner column) of the lower story to be the Byeonju (outer column) of the upper story, and the log-framed floor in the upper floor was structured by inserting the Changbang (connecting beam) between the Naejinju's and joining the log frames. In addition, the towers in eupseong fortresses had log-framed floor in the upper floor by setting up the high Nuhaju (column underneath a roof) and joining Cheongbang to the upper part of the column while it cannot be regarded as multi-roofed because only the upper part has a roof.

A study on the structure of the Three storied Stone pagoda in Gameunsa Temple site (감은사지 삼층석탑 구조)

  • Nam, si-jin
    • Korean Journal of Heritage: History & Science
    • /
    • v.38
    • /
    • pp.329-358
    • /
    • 2005
  • The Three storied Stone pagoda in Gameunsa Temple site, one of the early staged stone pagodas, has been known as a standard for Silla stone pagodas. A stone pagoda is not only a stone art work and but also a stone structure. Most studies and investigation of the stone pagoda has done mainly based on style and chronological research according to an art historical view. However, there is not an attempt to research the stone pagoda as a stone architecture. Most Korean experts at the stone pagoda has art history in their background. Engineers who can understand the structure of the stone pagoda are very limited. More architectural and engineering approach is need to research not only art historial understanding but also safety as a structure. We can find many technical know-how from our ancestors who made stone pagodas. 1. To reduce any deformation such as relaxation and sinking of BuJae which is caused by a heavy load, the BuJae (consist of a foundation stone and lower stereobates) should be enlarged. 2. A special construction method for connection between Myonsuk and Tangjoo was invented. This unique method is not used any longer after the Three storied Stone pagoda in Gameunsa Temple site. 3. The upper BuJae and the lower BuJae are missed each other by making a difference of Okgaesuk and Okgaebatchim in size. It is done for a distribution of perpendicular load and a prevention for relaxation of BuJae. 4. The center of gravity in the BuJae is located to the center of the stone pagoda by trimming the upper surface of the Okgaebatchim into a convex shape. The man who made stone pagodas had excellent knowledge on the engineering and techniques to understand the structure of the stone pagodas. We can confirm it as follows: the enlarged BuJae, dislocated connection between upper Bujae and lower BuJae, and moving the center of gravity close to the center of the stone pagoda.