• 제목/요약/키워드: Take Off

검색결과 922건 처리시간 0.032초

AN AUTOMATED FORMWORK MODELING SYSTEM DEVELOPMENT FOR QUANTITY TAKE-OFF BASED ON BIM

  • Seong-Ah Kim;Sangyoon Chin;Su-Won Yoon;Tae-Hong Shin;Yea-Sang Kim;Cheolho Choi
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1113-1116
    • /
    • 2009
  • The attempt to use a 3D model each field such as design, structure, construction, facilities, and estimation in the construction project has recently increased more and more while BIM (Building Information Modeling) that manages the process of generating and managing building data has risen during life cycle of a construction project. While the 2D Drawing based work of each field is achieved in the already existing construction project, the BIM based construction project aims at accomplishing 3D model based work of each field efficiently. Accordingly, the solution that fits 3D model based work of each field and supports plans in order to efficiently accomplish the relevant work is demanded. The estimation, one of the fields of the construction project, has applied BIM to calculate quantity and cost of the building materials used to construction works after taking off building quantity information from the 3D model by a item for a Quantity Take-off grouping the materials relevant to a 3D object. A 3D based estimation program has been commonly used in abroad advanced countries using BIM. The program can only calculate quantity related to one 3D object. In other words, it doesn't support the take-off process considering quantity of a contiguous object. In case of temporary materials used in the frame construction, there are instances where quantity is different by the contiguous object. For example, the formwork of the temporary materials quantity is changed by dimensions of the contiguous object because formwork of temporary materials goes through the quantity take-off process that deduces quantity of the connected object when different objects are connected. A worker can compulsorily adjust quantity so as to recognize the different object connected to the contiguous object and deduces quantity, but it mainly causes the confusion of work because it must complexly consider quantity of other materials related to the object besides. Therefore, this study is to propose the solution that automates the formwork 3D modeling to efficiently accomplish the quantity take-off of formwork by preventing the confusion of the work which is caused by the quantity deduction process between the contiguous object and the connected object.

  • PDF

높이뛰기의 바 넘기 동작을 위한 각운동량 분석 (Analysis of the Angular Momentum for the Bar Clearance Motion in the Fosbury Flop)

  • 성낙준
    • 한국운동역학회지
    • /
    • 제14권3호
    • /
    • pp.119-134
    • /
    • 2004
  • The purpose of this study was to analyze the angular momentum characteristics of the Fosbury Flop high jump and the role of the body segments for the production of 3 angular momentum components. The subjects were three male jumpers who were former Korean national team players. Their jumping motions were analyzed using the DLT method of three-dimensional cinematography. The conclusions were as follows. 1. All the forward angular momentum needed to clear the bar was created in the take-off phase. Take-off leg was the great contributor of the forward angular momentum. On the other hand, free leg produced large opposite angular momentum. 2. All subject had some lateral angular momentum before the take-off phase. Head and free leg had major contribution to the lateral angular momentum production. Take-off leg produced opposite angular momentum. 3. All subject had some twisting angular momentum, which make the back of the athlete him to the bar, before the take-off phase. Free leg was the major contributor of the twisting angular momentum. Head and trunk was the second contributor of the twisting angular momentum. 4. Total angular momentum needed to clear the bar had no significant correlation to the jumping height. 5. Subject who made excessive angular momentum showed different pattern of angular momentum production and had a poor record compared to other subject.

Tension Control of the Let-off and Take-up System in the Weaving Process Based on Support Vector Regression

  • Han, Dong-Chang;Back, Woon-Jae;Lee, Sang-Hwa;Lee, Hyuk-Jin;Noh, Seok-Hong;Kim, Han-Kil;Park, Jae-Yong;Lee, Suk-Gyu;Chun, Du-Hwan
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 2005년도 ICCAS
    • /
    • pp.1141-1145
    • /
    • 2005
  • This paper proposes a robust tension control algorithm for the let-off and take-up system driven by servo motor which is robust to disturbance and tension variation by using SVR(Support Vector Regression). Quality of textile goods in fiber manufacturing process highly depends on control of let-off, take-up and tension which are essential for constant tension control of yarn and textile fabrics and correct length of them. The physical properties of textile fabrics are very sensitive to several factors(temperature, humidity, radius change of warp beam etc.) which result in tension change. Rapid development of fiber manufacture machine for higher productivity requires control system for let-off, take-up and tension for robustness to sharp tension-variation and quick response. The validity and the usefulness of the proposed algorithm are thoroughly verified through numerical simulation.

  • PDF

Wave energy converter by using relative heave motion between buoy and inner dynamic system

  • Cho, I.H.;Kim, M.H.;Kweon, H.M.
    • Ocean Systems Engineering
    • /
    • 제2권4호
    • /
    • pp.297-314
    • /
    • 2012
  • Power-take-off through inner dynamic system inside a floating buoy is suggested. The power take-off system is characterized by mass, stiffness, and damping and generates power through the relative heave motion between the buoy and inner mass (magnet or amateur). A systematic hydrodynamic theory is developed for the suggested WEC and the developed theory is illustrated by a case study. A vertical truncated cylinder is selected as a buoy and the optimal condition of the inner dynamic system for maximum PTO (power take off) through double resonance for the given wave condition is systematically investigated. Through the case study, it is seen that the maximum power can actually be obtained at the optimal spring and damper condition, as predicted by the developed WEC theory. However, the band-width of high performance region is not necessarily the greatest at the optimal (maximum-power-take-off) condition, so it has to be taken into consideration in the actual design of the WEC.

Testing of Load Capacity of a Foil Thrust Bearing

  • Kim, Choong Hyun;Park, Jisu
    • Tribology and Lubricants
    • /
    • 제34권6호
    • /
    • pp.300-306
    • /
    • 2018
  • In this study, the performance of foil thrust bearings was investigated by performing bearing take-off and load capacity tests, using an in-house designed and manufactured vertical bearing test rig. The mean take-off rotational speed and maximum load capacity of the bearing specimen were ~18,000 rpm and ~80 kPa, respectively. The vertical bearing test rig was observed to yield higher coefficients of friction and frictional torques than a horizontal bearing test rig under identical test conditions. This was a result of its structural characteristics, in that the bearing specimen is placed atop the thrust runner, which keeps it from being separated from the runner after the bearing take-off. In addition, bearing take-off was observed at a higher runner rotational speed as this structure keeps air from flowing between the top foil and runner surfaces, which requires a higher runner speed. The parallel alignment between the bearing specimen and runner surfaces can be maintained within a certain range more easily in a vertical test rig than in a horizontal test rig. Because of these advantages, Korean Industrial Standard, KS B 2060, recommends a vertical bearing test rig as the standard test device for foil thrust bearings.

전기 수직이착륙 항공모빌리티용 동력플랫폼 개발을 위한 이착륙 실험시스템 연구 (A Study on Take-off and Landing Experimental System for Development of Power Platforms for Electric Vertical Take-Off and Landing Air Mobility)

  • 원준성;노광현
    • 한국산업융합학회 논문집
    • /
    • 제26권4_2호
    • /
    • pp.639-648
    • /
    • 2023
  • In modern society, UAM (Urban Air Mobility) transportation system is being developed as an alternative to urban traffic congestion and environmental problems, and electric vertical take-off and landing (eVTOL) is a combination of vertical take-off and landing function and electric power. It is attracting attention as an innovative next-generation transportation method as an eco-friendly alternative that reduces noise and air pollution by providing efficient mobility within the city. Since eVTOL development requires designing and implementing airframes suitable for various mission purposes, the power system needs to be developed as a platform concept before airframe development. In this study, we empirically proposed a test bench concept equipped with a stable power supply and an efficient control system, essential in developing a power platform with a combined function in the form of a fuselage and module type specialized for various mission purposes. The proposed drivetrain platform test bench consists of a system verifying the stable take-off and landing software and a power platform adjusting the motor's thrust. It will serve as a verification system that can be developed.

MOTORCYCLE POWER TAKE-OFF FOR AGRICULTURE

  • Quick, G.R.;Paita, B.L.;Salazar, G.C.
    • 한국농업기계학회:학술대회논문집
    • /
    • 한국농업기계학회 1993년도 Proceedings of International Conference for Agricultural Machinery and Process Engineering
    • /
    • pp.211-216
    • /
    • 1993
  • The successful design of several types of motorcycle power take off (M-pto) has opened possibilities for the use of a range of attachments matched to the power of the more popular motorcycle models in Asia. This paper reports on the implementation of the motorcycle power-take-off for low-speed and high speed applications utilizing some existing IRRI machines.

  • PDF

BIM 기반 물량산출 자동화를 위한 모델링의 기준제시 (Propose to Modeling standard for automation quantity take-off of BIM-based)

  • 전기현;윤석헌
    • 한국건축시공학회:학술대회논문집
    • /
    • 한국건축시공학회 2011년도 추계 학술논문 발표대회
    • /
    • pp.143-144
    • /
    • 2011
  • Recently the construction project is intricately linked to the between participants. it is because construction informations are not integrate. This study suggests 3D modeling standard for integrated construction information. These suggestions can be useful to automation quantity take-off.

  • PDF

Design optimization of a fixed wing aircraft

  • Yayli, Ugur C.;Kimet, Cihan;Duru, Anday;Cetir, Ozgur;Torun, Ugur;Aydogan, Ahmet C.;Padmanaban, Sanjeevikumar;Ertas, Ahmet H.
    • Advances in aircraft and spacecraft science
    • /
    • 제4권1호
    • /
    • pp.65-80
    • /
    • 2017
  • Small aircrafts, Unmanned Aerial Vehicles (UAVs), are used especially for military purposes. Because landing fields are limited in rural and hilly places, take-off or landing distances are very important. In order to achieve a short landing or take-off distance many parameters have to be considered, for instance the design of aircrafts. Hence this paper represents a better design to enlarge the use of fixed wing aircrafts. The document is based on a live and simulated experiments. The various components of designed aircraft are enhanced to create short take-off distance, greater lift and airflow without the need for proper runway area. Therefore, created aerodynamics of the remotely piloted aircraft made it possible to use fixed wing aircrafts in rural areas.

통신 서비스의 늦은 수요확산 현상과 네트워크 효과 (Network Effect and the Late Take-off Phenomenon in the Diffusion of Telecommunication Services)

  • 임병락;최문기
    • 한국경영과학회:학술대회논문집
    • /
    • 한국경영과학회 2001년도 추계학술대회 논문집
    • /
    • pp.342-345
    • /
    • 2001
  • Telecommunication services are distinctive in that their adoptions are influenced by network effect resulting in 'the late take-off Phenomenon' and the 'critical mass' problem. In this paper we examined, so called, 'the late take-off phenomenon' in the diffusion process of telecommunication services. We compared the parameters of the diffusion process of consumer durables with those of fax services in the US and Korea. By analyzing the parameters of a new diffusion model based on the threshold model proposed by Markus, We found that 'the late take-off phenomenon' resulted from the low heterogeneity of the threshold distribution for the potential adopters.

  • PDF