• Title/Summary/Keyword: Successful completion

Search Result 155, Processing Time 0.029 seconds

A Systems Engineering Process applied to the Aircraft Development (항공기 개발을 위한 시스템 엔지니어링(SE) 프로세스 적용방안)

  • Choe, Seok;Park, Jung-Yong;An, Lee-Gi
    • Aerospace Engineering and Technology
    • /
    • v.5 no.2
    • /
    • pp.53-59
    • /
    • 2006
  • Since the inception of Systems Engineering as a discipline, Systems Engineering has been providing technical leadership toward the successful completion of projects. In today's increasingly competitive marketplace, many organizations are turning to systems engineering practices to improve theft responsibilities to the needs and expectations of various stockholders. This paper is intended to provide a systems engineering process, which is tailored to aircraft development program, through the basic understanding of system engineering standards and its evolution over the decades.

  • PDF

A Study on Predicting Construction Cost of Educational Building Project at early stage Using Support Vector Machine Technique (서포트벡터머신을 이용한 교육시설 초기 공사비 예측에 관한 연구)

  • Shin, Jae-Min;Kim, Gwang-Hee
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.11 no.3
    • /
    • pp.46-54
    • /
    • 2012
  • The accuracy of cost estimation at an early stage in school building project is one of the critical factors for successful completion. So various of techniques are developed to predict the construction cost accurately and expeditely. Among the techniques, Support Vector Machine(SVM) has an excellent ability for generalization performance. Therefore, the purpose of this study is to construct the prediction model for construction cost of educational building project using support vector machine technique. And to verify the accuracy of prediction model for construction cost. The performance data used in this study are 217 school building project cost which have been completed from 2004 to 2007 in Gyeonggi-Do, Korea. The result shows that average error rate was 7.48% for SVM prediction model. So using SVM model on predicting construction cost of educational building project will be a considerably effective way at the early project stage.

Fault-Tolerance Improvement of Real-Time Embedded System using Static Checkpointing (실시간 임베디드 시스템의 결함 허용성 개선을 위한 정적 체크포인팅 방안)

  • Ryu, Sang-Moon
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.13 no.12
    • /
    • pp.1147-1152
    • /
    • 2007
  • This paper deals with a scheme for fault-tolerance improvement of real-time embedded systems, which engages an equidistant checkpointing technique to tolerate transient errors. Transient errors are caused by transient faults which are the most significant type of fault in reliable computer systems. Transient faults are assumed to occur according to a Poisson process and to be detected in a non-concurrent manner (e.g., checked periodically). The probability of the successful real-time task completion in the presence of transient errors is derived with the consideration of the possible effects of the transient errors. Based on this, a condition under which inserting checkpoints improves the fault-tolerance of the system is introduced and an optimal equidistant checkpointing strategy that achieves the highest fault tolerance is presented.

Web-based Collaboration Systems for Structural Design: A Review

  • Lim, Jinkang;Lee, Jaewook;Lee, Seunghye;Kim, Han Soo;Jung, Sungwon
    • Journal of KIBIM
    • /
    • v.5 no.4
    • /
    • pp.37-46
    • /
    • 2015
  • In a construction project, collaboration amongst the project participants is a critical factor for high-quality results and successful completion of the project. Owing to the advance of information technologies, web-based systems have become more common in the construction industry, but research and development has been made for only limited areas. For organized and systematic collaboration in various fields, collaboration systems have to be developed in a holistic manner based on diverse needs from the whole construction industry. This study aims to investigate the current status of web-based collaboration systems from structural engineers' perspectives and propose an improvement plan. For a systematic analysis of selected cases, we apply a classification of three developmental stages depending on interoperability and organizational levels: structural design and analysis, collaborative design, and integrated design management. Thereafter, the characteristics of each stage are extracted and comparatively analyzed. Lastly, three functional factors were proposed for the improvement of web-based collaboration systems for structural design.

A study on Development of train performance analysis model for the high-speed electric multiple unit 400km/h experimental (차세대 고속열차 성능해석 모델 개발)

  • Lee, Tae-Hyung;Park, Choon-Soo;Kim, Young-Guk;Choi, Sung-Hoon;Kim, Sang-Soo;Han, In-Soo
    • Proceedings of the KSR Conference
    • /
    • 2008.11b
    • /
    • pp.524-528
    • /
    • 2008
  • The HEMU-400X(High-speed Electric Multiple Unit 400km/h eXperimental) project starts in 2007. It is required to analysis and simulate the train performance throughout the project life cycle for a successful completion of the project. This paper is devoted to the development of a train performance analysis model for the high-speed electric multiple unit 400km/h experimental. The model consist of running resistance model, train model, traction model and braking model. So, this paper represents the results of the train performance analysis.

  • PDF

TEN MANAGEMENT STRATEGIES TO AVOID CONSTRUCTION CONFLICTS

  • Nirmal Kumar Acharya;Young Dai Lee;Soo Yong Kim;Yong Duek Kim
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.709-713
    • /
    • 2005
  • The conflict problems encountered in the construction projects led to prolonged delays in implementation, interruptions and sometimes suspension. This paper has described ten fundamental management principles to avoid conflicts in construction field and increase the productivity. They are: i) hire good (not cheap) construction professionals ii) set reasonable time and cost goals iii) recognize contractors and designers are in business to make profit iv) draft a clear contract document v) pick a suitable project delivery system vi) implement a front-end approach vii) accept construction project as a dynamic process viii) need of education and training of professionals ix) accountability and teamwork in construction site, and x) avoid negligence.

  • PDF

Design Direction of a Big Data based Performance Monitoring System using Quality Function Deployment (QFD를 이용한 빅 데이터 기반 성과 모니터링 시스템의 설계방향 도출)

  • Kim, Chang-Won;Kim, Taehoon;Seo, Junghoon;Lim, Hyunsu
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2021.05a
    • /
    • pp.255-256
    • /
    • 2021
  • The performance measurement of construction projects has traditionally been evaluated as a prerequisite for successful project completion. Considering this importance, the UK and the US are operating quantitative performance measurement systems for construction projects. However, in the case of Korea, there is a limit to the use of existing methods due to the limitation of data collection. Recently, in consideration of the domestic situation, research is being conducted to measure the quantitative performance of a project by using big data including progress and project attribute information. Therefore, this study aims to present the design direction of a performance monitoring system using Quality Function Deployment.

  • PDF

Development of Delay Responsibility Determination Model based on the Probabilistic Risk Analysis

  • Cho, Ji Hoon;Lim, Dong Yui;Kim, Sang Bum
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.599-599
    • /
    • 2015
  • This research attempts to resolve the construction delay issues of indirect delays by developing the "Delay Responsibility Determination Model" (DRM) based on probabilistic risk analysis. DRM is envisioned to provide a way of quantitatively analyzing impacts of delayed activities while considering both direct and indirect influences. With the successful development of DRM, it would be possible to present relative probabilistic measures to all the related stakeholders in terms of their contributions to schedule delays. Upon the development completion of DRM, "Korean Construction Delay Claim/Dispute Resolution Protocols" will also be prepared to facilitate the effective use of DRM.

  • PDF

A CASE STUDY OF CONSTRUCTION ENGINEERING FOR CABLE SUPPORTED BRIDGE BY COLLABORATIVE SYSTEM

  • Jung-Min Nam;Sung-Ho Kim;Jae-Hong Kim
    • International conference on construction engineering and project management
    • /
    • 2011.02a
    • /
    • pp.586-590
    • /
    • 2011
  • This paper presents the case study of the CE by collaborative system and proposes a model of the CM group for the cable supported bridge. The cable supported bridges have a large project scale and need a high level of construction method. Therefore an advanced construction management system is required for successful completion of project. The construction management (CM) group which control design management, construction plan, subcontract, technical support and R&D is organized for the cable supported bridge project. The CM group established a collaborative system with construction site and drew an effective management of cost, process, quality, safety for each project. Furthermore, the CM group established the procedure of construction management based on the construction engineering (CE) items and performed the project management on the construction phase. Efficiency of cost reduction and site control is maximized by using a collaborative system.

  • PDF

Two Cases of Stomach Cancer in Patients with Head and Neck Cancer (두경부암 환자에 병발된 위암 2예)

  • Kang Jin-Hyoung;Moon Chan-Soo;Kim Hoon-Kyo;Lee Kyung-Shik;Kim Dong-Jip;Yoon Sei-Chul;Cho Seung-Ho;Suh Byung-Do
    • Korean Journal of Head & Neck Oncology
    • /
    • v.8 no.1
    • /
    • pp.25-30
    • /
    • 1992
  • The causes of treatment failure in head and neck cancer are locoregional recurrence, distant metastasis and second primary cancer. The favorite sites of second primary cancer are head and neck, lung and esophagus. But, the incidence of stomach cancer in Korea is the highest of all, high incidence of stomach cancer is expected in head and neck cancer patients. We experienced 2 cases of stomach cancer after successful treatment of primary head and neck cancer at Kang Nam St. Mary's hospital. The first case was a 60-year-old male with nasopharyngeal non-keratinizing carcinoma(stage III, T1N1M0). He received three cycles of induction chemotherapy including cisplatin and 5-fluorouracil followed by radiotherapy which resulted in complete response. Five months after completion of radiotherapy. stomach adenocarcinoma(stage IV, T4N2M1) was diagnosed. He received one cycle of FAM chemotherapy and died 4 months after diagnosis of stomach cancer. The second case was a 50-year-old male with pyriform sinus squamous cell carcinoma(stage II, T2N0M0). He received curative partial pharyngolaryngectomy followed by radiotherapy which result in free of disease. Four months after completion of radiotherapy. stomach adenocarcinoma(stage IV, T4N2M1) was diagnosed. Bypass gastrojejunostomy was performed. The screening test for stomach cancer including upper gastrointestinal X-xay series and/or endoscope of the stomach should be performed periodically for the patients with head and neck cancer in Korea.

  • PDF