• Title/Summary/Keyword: Standard Work Process

Search Result 526, Processing Time 0.025 seconds

Case Study for Developing of Standard Process about Defect Consulting Work in Apartment Building (공동주택 하자감정업무 표준절차개발을 위한 사례분석)

  • Park, Jun-Mo;Seo, Deok-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.05a
    • /
    • pp.158-159
    • /
    • 2014
  • There is urgent for defect consulting work to standardize the investigated method, repaired and reinforced method, and estimated cost about defect in increasing a defect lawsuit of apartment building. For the purpose of developing the standard process of defect consulting work, the review that a used process in law and institution should take precedence. There is not prepared the national standard for defect consulting but is dependent on an experience and a practice of consultants. This study analyzes defect consulting case, defines main steps for developing the standard process, and draws phased work factors. As systemizing this, it is expected to apply to basic structure for developing the standard process of defect consulting work for the next.

  • PDF

A Study of LOD(Level of Detail) for BIM Model applied the Design Process (설계 프로세스를 반영한 BIM 작성 기준(LOD)에 대한 연구)

  • Cho, Hyun-Jung;Kim, Yeon-Soo;Ma, Young-Kyun
    • Journal of KIBIM
    • /
    • v.3 no.1
    • /
    • pp.1-10
    • /
    • 2013
  • BIM(Building Information Modeling) ordering manuals and guidelines are diffused with the recent BIM activation. However, it is causing drawbacks such as an increase of work at each design stage and a decline of BIM application level that the standard of making up and managing BIM is vague and it includes comprehensive meaning. Therefore, this study aims to secure BIM work standard by establishing BIM making-out standard based on LOD(Level of Detail) classification considering domestic design process. It compared each definition of LOD by analyzing domestic and foreign BIM guideline examples, and figured out insufficiency of existing domestic and foreign design process and BIM guidelines. Moreover, it drew architects' work articles for promoting the progression of the efficient design process, and analyzed BIM requirements on design process, dividing BIM application scale by field. Through this analyzing process, it finally established BIM making-out standard classified by design process. The effects of establishing BIM making-out standard would include improving a division of labor and cooperation environment by creating integrated BIM model on design stages, advancing work efficiency by preventing a repetition and an increase of work, and upgrading project completeness and design quality. Besides, it can secure BIM work standard by clarifying responsibility for working steps. BIM making-out standard established by this study will contribute to developing the future BIM work standard document and BIM guideline as a data base.

Standard Process and Work Breakdown Structure for Housing Construction Projects using Infill Modular System (인필식 모듈러 공법을 적용한 주택건설공사의 작업분류체계 구축 및 표준 프로세스 제안)

  • Sohn, Jeong Rak;Lee, Dong Gun;Bang, Jong Dae;Kim, Jin Won
    • Land and Housing Review
    • /
    • v.10 no.3
    • /
    • pp.77-87
    • /
    • 2019
  • In Korea, the modular construction method was applied to the construction of facilities such as military barracks and school dormitories, beginning with the pilot project of Seoul New Elementary School in 2003. In 2017, public modular houses were supplied to Busan(Yongho-dong) and Seoul(Gayang-dong), and modular housing is expected to continue to be supplied in the future. However, there is no clear construction standard for the modular housing construction yet, and there are few cases where the infill modular system is applied. Therefore, this study established the work breakdown structure and proposed a standard process focusing on the infill modular system applied to the construction of Dujeong-dong modular house in Cheonan. Level 1 of the work breakdown structure by construction stage of Infill modular was defined as modular manufacturing, assembly, and finishing process. Level 2 was defined as preparation, modular production, modular infill, modular fixing, floor plastering, building finishing, and other site finishing. Level 3 is defined as 57 detailed unit work of infill modular construction. The standard process of infill modular is proposed for the assembly stage that is commonly applicable to infill modular housing construction. The results of this study can be used for the process plan, transportation plan, lifting plan of modular housing construction.

A Study on the Measures for Work Interference Reduction in Apartment Construction (공동주택 공사의 작업간 간섭 감소 방안에 관한 연구)

  • An Sung-Hoon;Kim Joon-Ho;Kang Kyung-In
    • Journal of the Korea Institute of Building Construction
    • /
    • v.6 no.1 s.19
    • /
    • pp.117-122
    • /
    • 2006
  • Apartments construction is a one of largest parts in buildings construction. In apartments construction, work interferences are frequently occurred in work processing because workspaces are very various and numerous. However, though work process is important for mainly influencing to the schedule, quality and cost of apartments construction, these work interferences are considered a kind of uncertainty, which is difficult to anticipate at construction planning stage, in work processing. Therefore, this study proposed the measures for work interference reduction in apartment buildings construction and the actual planning for practices. The results can be summarized as follows: (1) the standard of work process is checked regularly. (2) The scope of work and work process is adjusted. (3) The standard of drawings process and cost about work interferences work profess is established.

Establishment of Work and Time Standards in Machining rations including NC Machines (NC기계들이 포함된 기계공작공정에서의 작업연구)

  • 유인선;오근태
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.18 no.33
    • /
    • pp.11-27
    • /
    • 1995
  • This study sets a goal of establishing work standard and standard time in a machine tool process consisted of high-priced NC machine tools. Firstly, the theories of work standard and standard time in the field of NC machine tools are studies. Secondly, the theories are actually applied to a manufacturing company; work standard sheets are developed and applied to a machining center haying low operation rate, and then the increase in productivity is compared. Finally, problems to be studied later in relation to work standard and standard time are presented.

  • PDF

A Study on the Development of Work-Crew Based Daily-Productivity for Representative B.O.Q Item in River Conservation Project (하천공사 대표공종의 작업조 구성 및 생산성 정보 개발)

  • Yoo, Duk-Yul;Park, Hyung-Keun;Lim, Hyeong-Min
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.33 no.6
    • /
    • pp.2519-2528
    • /
    • 2013
  • The standard of estimate is being used as basic material for appropriating construction expenses of public institutions and private institutions. The present thesis aims to propose a new form of a standard of estimate and a calculation method of work amount of equipment by targeting a representative construction type selected at river reservation work. The present thesis expects that the convenience of users can be expanded by improving applicability of a standard of estimate and simplifying a calculation process of work amount of equipment in a process planning stage so that the provision of work crew lineup information and daily productivity information is possible by a standard of estimate. In case of river conservation work, because the variables called work conditions act very largely, there exists much difficulty for generalizing productivity information and work amount of equipment, but if its accuracy could be enhanced by improving continuous productivity information and work amount information of equipment, the simplification of process planning establishment and cumulative process through a standard of estimate would be possible.

The Study of Logistics Process Standardization (물류 프로세스 표준화 연구)

  • Park, Sun Ho;Park, Soo Min
    • Journal of Korea Society of Digital Industry and Information Management
    • /
    • v.7 no.1
    • /
    • pp.173-183
    • /
    • 2011
  • Global logistics including Korea had developed at various fields through the developed IT technology. In addition, in changing into Internet based digital economy times, economic and logistics activities became extending into worldwide over the cross-border. Logistics activity performed by off-line rapidly changed in real environment. But, unfortunately business process modeling about the whole logistics was not happened, even though process modeling had done by transport stages or logistics entities. Therefore, it is difficult to grasp the whole logistics. Additional cost and time was requested due to no association between logistics entities and invisibility. So, this paper has to be process modeling for logistics industry domain. For objective modeling, work area shall be divided and it extracts general work process per each area. And then it defines subprocess of general work process. Cargo tracking in logistics industry domain means to grasp the status and present states at transportation or storage stage. This paper defines business process and data model for electronic processed work area using the UN/CEFACT standard modeling methodology.

Establishment of Standard Construction Process of the Infill Modular Construction System (인필 모듈러 건설시스템의 표준 시공프로세스 구축)

  • Kim, Chang-Han;Jung, Chan-Woo;Kim, Hyeong-Su;Hwang, Hyun-Jun;Han, Jae-Goo
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.11a
    • /
    • pp.245-246
    • /
    • 2012
  • Lately the Infill Modular Construction System which meets the domestic standards about the structure and fireproof performance and which is applied to the remodeling techniques is being emphasized. In order to introduce the Infill Modular Construction System to domestic market successfully, the development of insufficient element technologies and systematic analysis of process should be preceded. This research aims to establish of Standard Construction Process, as advanced research for the settlement of the Infill Modular Construction System. As advanced research for the activation of the Infill Modular Construction System, this research aims to develop Infill Unit Module's mobile device. This is expected to improve work efficiency. In addition organizing optimized Standard Construction Process by steady work analysis and improvement is being planned.

  • PDF

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

A Study on the Status of Illumination Environment in Workplaces (업무공간의 조명 환경 실태 조사 연구)

  • Choi Han-Hee;Ha Mi-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.13 no.6
    • /
    • pp.167-174
    • /
    • 2004
  • The purpose of this study is to examinethe present illumination conditions in office environment and to suggest an efficient illumination plan in office planning process. Illumination conditions in work environment were surveyed in 6 offices to investigate whether the present illumination conditions were appropriate to the work type. The results of this study are as follows: Most of the general Illuminance level in the area of work were all at an adequate level, except one. The average Illuminance level in the all meeting rooms were met for the standard. Illuminance in the all reception area were extremely over the standard, The illuminations of this area were rather designed according to the image of the company than the standard. As for the illumination method in the area of general work, four offices used a general lighting by a direct lighting type, while two offices used a general lighting and a task lighting at the same time. This survey suggested that first, each company should consider illumination plan in the building planning process, second, illumination plan considering the type of places is needed, and third, illumination environment may be differentiated according to the work type. In conclusion, efficient illumination environment should be considered in office building planning process, especially In terms of illumination materials and methods.