A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.

A Study on the Utilization of BIM Model using Vertex Data-based Division Method (정점데이터기반 분할기법을 활용한 BIM모델의 활용 방안 연구)

  • Jae-Yeong, Hwang;Jae-Hee, Lee;Leen-Seok, Kang
    • Land and Housing Review
    • /
    • v.14 no.1
    • /
    • pp.123-134
    • /
    • 2023
  • The BIM (Building Information Modeling) model created in the design stage can be used for prior review and schedule management for the construction stage. However, in the case of actual BIM application cases, additional work is required, such as creating a new model suitable for the construction stage, rather than using the 3D model in the design stage, due to the difference in the purpose of use between the design stage and the construction stage. Therefore, in this study, a division function of BIM model is proposed as a method of recycling it in the construction stage without a remodeling process. In addition, the application to the actual BIM model and the 4D CAD system linkage of the divided object and the comparison with the existing division method are used to verify the usability.

Construction Materials Managing System Based on RFID (RFID 기반의 건축자재 관리 시스템)

  • Kim, Tae-yun;Hwang, Suk-seung
    • The Journal of the Korea institute of electronic communication sciences
    • /
    • v.10 no.8
    • /
    • pp.907-914
    • /
    • 2015
  • Due to the global warming, the restriction for emitting the green-house gas is strengthened and a main ingredient of the green-house gas is carbon dioxide ($CO_2$). In order to reduce the amount of $CO_2$, the low-carbon and long-life of the construction and the construction materials management system based on the radio frequency identification (RFID) technique have been actively studied in the construction field. The conventional construction management system based on RFID only focuses on the study and experiment for managing the used amount and location of the construction materials in the construction stage, but it does not consider the study for the status management system for the recycling materials in the construction stage or the building deactivation. In this paper, we propose the effective RFID system for managing the status of the construction materials during the construction stage or the building deactivation. Employing RFID with the frequency of 900MHz, the proposed system consists of the reader unit, communication unit, and memory unit, and its tags are attached in the surface or inside of the construction materials.

A Case Study of the Construction Project Management Applied to New Catholic Medical Center Construction Project ('가톨릭중앙의료원 새병원 및 성의회관 건립공사'CM수행사례 소개)

  • Kim, Hyo-Seong;Park, Young-Soon;Kim, Chan-Joong
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.37-44
    • /
    • 2006
  • The construction management has been applied for the first time in South Korea on the New Catholic Medical Center. The construction of the project has been controlled and managed by the CMr, as Client's agent from the very beginning stage of construction when the block plan is being established by the Contractor's design consultant. As CMr generally gets involved in the project throughout the entire construction phases on behalf of the Client, Parsons Brinckerhoff has been delivering high quality solutions that satisfy the Client's requirements in Pre-construction stage and also brought practical and innovative engineering solutions in a time and cost effective method. The objective of this case study is to describe works executed by CMr in Pre-construction stage ; and, analyze the positive effects by applying CM to the project. Therefore, it is anticipated that CM procedure might be introduced and adapted to the up-coming hospital construction projects.

  • PDF

Construction stage analysis of three-dimensional cable-stayed bridges

  • Atmaca, Barbaros;Ates, Sevket
    • Steel and Composite Structures
    • /
    • v.12 no.5
    • /
    • pp.413-426
    • /
    • 2012
  • In this paper, nonlinear static analysis of three-dimensional cable stayed bridges is performed for the time dependent materials properties such as creep, shrinkage and aging of concrete and relaxation of cable. Manavgat Cable-Stayed Bridge is selected as an application. The bridge located in Antalya, Turkey, was constructed with balanced cantilever construction method. Total length of the bridge is 202 m. The bridge consists of one $\ddot{e}$ shape steel tower. The tower is at the middle of the bridge span. The construction stages and 3D finite element model of bridge are modeled with SAP2000. Large displacement occurs in these types of bridges so geometric nonlinearity is taken into consideration in the analysis by using P-Delta plus large displacement criterion. The time dependent material strength and geometric variations are included in the analysis. Two different finite element analyses carried out which are evaluated with and without construction stages and results are compared with each other. As a result of these analyses, variation of internal forces such as bending moment, axial forces and shear forces for bridge tower and displacement and bending moment for bridge deck are given with detailed. It is seen that construction stage analysis has a remarkable effect on the structural behavior of the bridge.

Case studies on construction and design in Colombo port, Sri Lanka (스리랑카 콜롬보항만 시공 및 설계사례 (ELIPO 및 COLPO 현장))

  • Lee, Seung-Won;Chung, Yoon-Young;Lee, Gab-Yeol;Park, Kyoung-Ho
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2010.03a
    • /
    • pp.44-57
    • /
    • 2010
  • The purpose of this paper is to introduce case studies on 2 projects for the construction of port facilities in Colombo, Sri lanka. In Queen Elizabeth quay development project in 2000, the damage at the bottom of steel tubular piles were occurred when piles were driven into subsoil for piled wharf structure in Stage 1. In order to prevent same incident in Stage 2 & 3, the pile driveability analysis were executed by dynamic formulas, analysis program, test driving and pile load tests. Through pile driveability analysis, prevention plans were proposed. In Colombo port expansion project in 2008, the mv method was applied to predict a primary consolidation settlement of a subsoil under a breakwater in the calculation stage. The $m_v$ was estimated from results of cone penetration tests and the final settlement by consolidation was calculated with it.

  • PDF

A Case Study of Status and Characteristics of the BIM Standard in China (중국 BIM 표준의 현황과 특성에 관한 사례 분석)

  • Shin, Kyoo-Chul
    • Journal of KIBIM
    • /
    • v.8 no.3
    • /
    • pp.20-30
    • /
    • 2018
  • The Standard for BIM in Construction of China was released in 2017. The Unified Standard for BIM of China also took effects on 2017. The BIM standards of China needs to be compared with those related guidelines of Korea to find the status and characteristics for future development of BIM application in both countries' construction industries. The research methodology is a case study of comparing various standards of both countries. The case study results reveals many interesting issues for future BIM application and guidelines for practice of design and construction process. The research foundings include followings : LOD (Level of development) are well defined including LOD 350 in Chinese Standard. P-BIM(Practice based BIM) concepts and series of standards are set for the well-defined design and construction process by work stage in China. Korean standards shows more processes of design and documentation in detail. Major three aspects, particularity in BIM standard by work trade, practicality in BIM work process of design and construction, and professionality in subjects of BIM application, are analyzed and compared with various Guidelines of BIM in both countries.

Analysis of Collapse Accidents in Demolition Work using AcciMap and STAMP (AcciMap과 STAMP를 활용한 해체공사 붕괴사고 분석)

  • Hyeon-Ji Jeong;Jeong-Hun Won
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.3
    • /
    • pp.51-60
    • /
    • 2023
  • Investigation of the cause of the relatively recent building collapse accident in Gwangju revealed a lack of awareness about the safety of the dismantling construction system among stakeholders, in the form of issues such as illegal subcontracting, unauthorized design changes, and insufficient safety supervision. This study was conducted to analyze the safety interactions between the building dismantling construction system and the involved stakeholders and to propose ways to prevent accidents in related institutions and workplaces. AcciMap and STAMP-CAST analysis methods were used to evaluate safety interactions among the various stakeholders participating in building demolition work. Analysis results revealed that the collapse accident during the dismantling work was caused not only by structural causes occurring in the construction stage, but also by various causes throughout the system, such as the dismantling plan preparation stage and the construction permit stage. The results also revealed the need for proper implementation of safety control measures by various stakeholders to prevent collapse accidents during dismantling construction.

VALUATION OF A MULTI-STAGE RAINWATER HARVESTING TANK CONSTRUCTION USING A REAL OPTION APPROACH

  • Byungil Kim;Hyoungkwan Kim;SangHyun Lee
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.386-389
    • /
    • 2013
  • Under climate change and urbanization, rainwater harvesting (RWH) systems are emerging as an alternative source of water supply because of growing concern about water sustainability. RWH systems can satisfy the various watering needs and provide the environmental benefits of lessening the damages from flood, drought, and runoff. The economic success of a RWH system is vitally concerned with the determination of the design capacity of storage tank to be built in the system. The design capacity is determined by the factors of average annual rainfall, period of water scarcity, and water price during the whole life-cycles. Despite the high uncertainties inherent in these factors, the current engineering design of RWH system construction often assumes that storage tanks should be built all at once. This assumption implicitly ignores the managerial flexibility in responds to the future as new information comes out-the right to build storage tanks stage by stage depending on the evolution of demand. This study evaluates the value of a multistage storage tank construction using a real option approach. A case study involving a typical RWH system construction in Jeonju, the Republic of Korea is conducted. The managerial flexibility obtained from the real option perspective allows engineers to develop investment strategies to better cope with the issue of water sustainability.

  • PDF

Analysis of the Effectiveness of Project Risk Management (PRM) on the Project Success: Focused on the Implementation Phase of Overseas Construction Projects (프로젝트 리스크 관리(PRM)가 프로젝트 성공에 미치는 효과성 분석: 해외건설사업 수행단계 전반을 중심으로)

  • Sullim Jung;Dae-Cheol Kim
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.46 no.3
    • /
    • pp.221-230
    • /
    • 2023
  • Under increased complexity and uncertainty of overseas construction projects, it is important for construction companies to improve their own project risk management capabilities instead of risk-taking strategies to secure competitiveness in the overseas construction market. Although most of the risks occur in project execution stage, many previous studies focused on planning stage including risk identification and analysis among PRM process. Therefore, this study aims to verify the effectiveness of whole PRM process during project execution stage through empirical study on participants of overseas construction projects. As the result it was found that first, the factor directly affects the project success is the execution process of PRM. It implies that appropriate actions such as appointing charged manager for risks, timely implementation of responding plan, continuous risk monitoring and updating established plan are the key for contribution to the project success. Second, the importance of communication in PRM is also found, which is not conducted at a specific but throughout the entire PRM process and need to be managed as essential factor for successful PRM..