• Title/Summary/Keyword: Stability of track structure

Search Result 59, Processing Time 0.027 seconds

Dynamic Characteristics and Stability of an Infrared Search and Track (적외선 탐색 및 추적장비의 동적 특성 및 안정화)

  • Choi, Jong-Ho;Park, Yong-Chan;Lee, Joo-Hyoung;Choi, Young-Soo
    • Journal of the Korea Institute of Military Science and Technology
    • /
    • v.11 no.2
    • /
    • pp.116-124
    • /
    • 2008
  • Current paper investigates the dynamic behavior and stability of an infrared search and track subjected to external disturbance having gimbal structure with three rotating axes keeping constant angular velocity in the azimuth direction. Euler-Lagrange equation is applied to derive the coupled nonlinear dynamic equation of motion of infrared search and track and the characteristics of dynamic coupling are investigated. Two equilibrium points with small variations from the nonlinear coupling system are derived and the specific condition from which a coupled equation can be three independent equations is derived. Finally, to examine the stability of system, Lyapunov direct method was used and system stability and stability boundaries are investigated.

3D FEA for the Cement Mortar Pouring type Paved Track (시멘트 모르터 충진형 포장궤도의 3차원 유한요소해석)

  • Lee Il-Wha;Lee Jin-Wook;Lee Su-Hyung;Lee Hyun-Suk
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.836-841
    • /
    • 2004
  • Recently, the development of the paved track is required as a Low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The most important factor of paved track is stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the pre packed concrete technique. The most important to design is characteristics of the structure. CMP slab's thickness is less than the conventional slab track and pouring layer is attached tie and roadbed directly. On this paper, to verify the basic structure of the CMP track, characteristics of the structure is investigated pouring layer, tie and interaction of the each layer using the 3D finite elment analysis.

  • PDF

Optimal Design of Cement Mortar Pouring type Paved Track (시멘트모르터 충진형 포장제도의 최적 설계)

  • Lee, Il-Wha
    • Journal of the Korean Society for Railway
    • /
    • v.9 no.2 s.33
    • /
    • pp.222-229
    • /
    • 2006
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. Because construction environment is very limited, cost is expensive and it has very complicated behavior. On this paper, structural characteristics of the paved track are investigated using the 3D finite element analysis to verify the optimized structure of the CMP track.

The Investigation of the In-Situ state to Determine the paved Track Structure (포장궤도 구조결정을 위한 현장상태 조사)

  • Lee Il-Wha;Hwang Seon-Keun;Park Tae-Soon;Lee Bo-Hyoung;Ko Hak-Song
    • Proceedings of the KSR Conference
    • /
    • 2004.06a
    • /
    • pp.974-979
    • /
    • 2004
  • Recently, the development of paved track is required as a Low-maintenance of conventional line. The most important factor of paved track is stability and applicability. In this method, the ballast is grouted with mortar so that the ballast can turn into a structure like slab. This method can be subdivided into the followings. One is the method with switching the ballast, and the other is without switching the ballast. The ordinary and actual states of the ballast and roadbed were investigated to evaluate the applicability of the paved track structure in this study, and various In-situ tests were applied. Non-destructive tests such as GPR, SASW, FWD were used, and bearing capacity of roadbed, depth of the ballast, and deterioration, penetration, and contamination of the ballast were focused. The result of this investigation was utilized in the selection of optimal paved track structure and data for preliminary design.

  • PDF

Characteristics of Track Behaviors according to Accelerated Tilting Train Speed (틸팅차량 증속에 따른 기존선 궤도의 거동 특성)

  • Shin, Tae-Hyoung;Choi, Jung-Youl;Eum, Ki-Young;Park, Yong-Gul
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1653-1661
    • /
    • 2008
  • A trial run of locally-developed tilting train has been in process on Chungbuk line since the test vehicle was first produced. For the system stabilization, interface verification among the systems including track, structure, catenary and signaling system, not to mention the rolling stock, is very crucial. In the area of wayside structure, the stability of track structure and train run shall be evaluated through the review of impact by increased speed by developed train on track structure. The study thus was intended to evaluate the impact on track while a tilting train is running the conventional line(ballast track), which is vulnerable to accelerated train speed. The evaluation of tilting train test running the part of Honam line was conducted to identify the impact on existing track performance by tilting train. To identify the performance of each part of track components while tilting train and high speed train were running the existing line, wheel load, rail bending stress, vertical displacement of rail and sleeper were compared so as to evaluate the expected impact by tilting train for improving the train speed.

  • PDF

Stability of CWR track on the High-Speed Railway Bridges considering Braking and Accelerating Forces (고속철도 차량의 시$\cdot$제동 하중에 대한 교량상 장대레일의 주행안전성 평가)

  • Chin Won-Jong;Kim Byung-Suk;Kwark Jong-Won;Kang Jae-Yoon;Choi Eun-Suk
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.769-774
    • /
    • 2004
  • In this paper, the main factors affect on the longitudinal rail force are discussed. Considering rail-bridge interaction, analytical and experimental evaluation of track behavior has been achieved. It is concluded that the horizontal ballast strength, the expansion length of the bridge span, and the stiffness of the bridge sub-structure are the significant parameters affecting the stability of the continuous welded rail (CWR) track. And, it is suggested that the ballast resistance forces should be maintained to ensure the track stability during the service.

  • PDF

A Study on the Track Longitudinal Force on the CWR track bridge with variable span length (장대레일 교량의 지간병화에 따른 궤도 축력 연구)

  • Jung Suk-In;Kim Sang-Chul;Kim Yun-Tae
    • Proceedings of the KSR Conference
    • /
    • 2004.10a
    • /
    • pp.781-787
    • /
    • 2004
  • Where the track is continuously welded over a bridge, the longitudinal force is interacted between the track and the sub-structure. Due to this respect, the expansion joint is used to decrease this force. But the expansion joint has several problems related to passenger comfort and maintenance etc. In this study, it is analysed about how the stability of the track is affected as the span length becomes longer in case of 2-span continuos bridge. It is found that there is no problem of an stability unless the span length is longer than 90m when the elastic shoe is used. And several parametric studies were also implemented.

  • PDF

Construction and Evaluation of the Paved Track on Test Line (도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가)

  • Lee, Il-Wha;Shim, Jae-Gyu;Lee, Choon-Ho;Park, Kyun-Seo;Ryu, Kyoung-Sik
    • Proceedings of the KSR Conference
    • /
    • 2007.11a
    • /
    • pp.1115-1120
    • /
    • 2007
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

  • PDF

Management Plan on Test Track of Advanced EMU System (차세대전동차 시스템 시험선 운영 방안)

  • Lee, H.M.;Kim, G.D.;Park, S.H.;Oh, S.C.
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.1036-1037
    • /
    • 2008
  • Test track of the Advanced EMU system will be developed and organically combined with technologies of power supply system, signal communication system and track structure. The purpose of the test track is a acquirement of reliability and stability through a sufficient performance test. Therefore, this paper draws up all management plans for tests of the Advanced EMU system.

  • PDF

Test Construction of the Paved Track at Subway Main Line (도시철도 본선 토공구간에서의 포장궤도 시험부설)

  • Lee, Il-Wha;Kang, Yun-Suk;Kong, Sun-Yong;Kim, Sang-Jin;Lee, Shun-Gu;Jung, Yun-Sik
    • Proceedings of the KSR Conference
    • /
    • 2008.06a
    • /
    • pp.1689-1694
    • /
    • 2008
  • Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, cement mortar pouring type paved track is developed. The paved track is a kind of concrete track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure and materials considering various conditions. Until now, the paved track is verified a various material and structure test. In this paper, it is introduce to the test construction at the urban subway main line. The test construction is completed at Dec. 2007. A major object and substance is a guarantee of construction progress on main line, track performance, construction technique for curved section, transition zone and winter season, recycling the used ballast and application of specific sleeper for sharp curved section.

  • PDF