Construction and Evaluation of the Paved Track on Test Line

도시철도 시험선 구간에서의 포장궤도 시험부설 및 성능평가

  • 이일화 (한국철도기술연구원 궤도토목연구본부) ;
  • 심재규 (부산교통공사 토목건축팀) ;
  • 이춘호 (부산교통공사 토목건축팀) ;
  • 박균서 (부산교통공사 토목건축팀) ;
  • 류경식 (부산교통공사 토목건축팀)
  • Published : 2007.11.08

Abstract

Recently, the development of the paved track is required as a low-maintenance of conventional line. The main reason is that the line capacity and bearing of track are increased progressively. The important factors of paved track are stability and applicability. To be based on this subject, Cement Mortar Pouring(CMP) paved track is developed. CMP paved track is a kind of ballast reinforced track using the prepacked concrete technique. The most important thing to design the paved track is to optimize the track structure considering various conditions. In this study, the CMP track is constructed(30m) on a test line and the track performance tested by running train to evaluation the capability and workability. The track performance are tested to confirm the vibration acceleration of the car body, wheel and track, accumulated settlement, track irregularity and crack of surface.

Keywords