• Title/Summary/Keyword: Specialty Construction

Search Result 115, Processing Time 0.026 seconds

A Study on the Construction Equipment Management System for Strengthening Global Competitiveness (건설기계산업의 선진화를 위한 관리체계의 개선 방안)

  • Lee, Jun-Bok;Kim, Sung-Keun;Seo, Jong-Won;Kim, Young-Suk
    • Korean Journal of Construction Engineering and Management
    • /
    • v.9 no.1
    • /
    • pp.55-65
    • /
    • 2008
  • It is increasingly recognized that the construction equipment play an important role as resources in construction process. The number of registered construction equipment in korea is over 320,000 according to the statistics. It is obvious that the machine-intensive construction method achieves productivity and quality improvement as well as safety. The main objective of this paper is to propose improvement plans for construction equipment management system in terms of scope, registration, inspection, rental business, operating licenses, and etc., which are the major issues described in the Construction Equipment Management Law. In order to satisfy the objective, this research conduct survey and interview with experts, and literature review on domestic and overseas related laws and regulations. The results of the research are about 20 issues for improvement plans for the better management system, so the further in-depth study on each issue will be recommended for the practical application to the law.

A Study of The Present State Analysis and Development Plans About Construction Monitoring and Monitoring Industry (건설 계측 및 계측업의 현황 분석과 발전 방안 연구)

  • Woo, Jong-Tae
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.2D
    • /
    • pp.163-169
    • /
    • 2010
  • Construction monitoring and monitoring industry have been rapidly developed with advance of IT industry and telecommunication. However institutional, legal supports that need to settle the construction monitoring are practically inadequate. So development plans that are reflected enquete results about the present state of construction monitoring are considered. A way that consider establishment Korea construction monitoring association and society, deal with relevant law appointing monitoring industry, consider enactment and revision of construction monitoring design standard and specifications, appoint practical construction monitoring educational institution, appoint an efficiency test specialty institution of monitoring equipment, consider the term of guarantee of monitoring equipment consider enactment and revision of estimating cost of construction measurement, consider ratio of monitoring equipment loss for developing construction monitoring and monitoring industry are proposed.

The Developmental Device for 119 fire fighting helicopter use activations (119 소방헬기 이용 활성화를 위한 발전방안)

  • Koh, Jae-Moon;Kim, Tae-Min;Kim, Hyo-Sik;Lee, Young-Ah
    • The Korean Journal of Emergency Medical Services
    • /
    • v.11 no.3
    • /
    • pp.93-109
    • /
    • 2007
  • The pre-hospital care in site transportation care and site care will be divided, it will follow in site or evacuation it will enforce it will can evacuate in condition of the emergency patient of like this at the initial stage and emergency care from inside fire fighting helicopter back transfer means and the manpower security of the specialty emergency necessary personnel(nursing and 1st EMT's) as the medical treatment agency and modernization of first aid equipment necessity inside American securing and fire fighting helicopter and specialty first aid packet won about lower the emergency care which is appropriate cannot become accomplished are the actual condition in total lack of emergency care equipment. Consequently craving augmentation, in order to be adapted with the handling kind transfer whose specialty and is appropriate and present time of rapid increase and the citizen of emergency demand by fire fighting helicopter simplicity transfer compared to it is a condition where the countermeasure preparation is earnest. Must expand emergency care equipment first even in fire fighting helicopter and 1st EMT's which it follows in him become arrangement and quickly the execution and specialty temporary disposal(ALS) must be enforced a temporary disposal and must buy the life which is. Also it gets by experience a helicopter induction outline, a radio communication method and the patient helicopter on-board hour attention point back various attention fact back with the body and when where it stands but accurately there must be it will be able to induce the helicopter. Also every manuals anger it does a helicopter transfer method and the emergency care method back and that all processes must do fixed form anger, it becomes feed. Also it related with a helicopter transfer even from the relationship agency many research to lead, difference of the advanced foreign nation and the maximum it is the actual condition where the medical emergency system construction which it reduces is earnestly demanded. Also with emergency structure(crane) it confronts to an aviation transfer even from the establishment college and education it leads intensively and 1st EMT's of the good quality which relates with an aviation structure expects is cultivate at all.

  • PDF

Management Structure Improvement by Construction Management in The Project Financing Development Projects (프로젝트파이낸싱 기반 수익형개발사업에 CM적용을 통한 관리구조 개선방안)

  • Lee Eun-Suk;Kim Yang-Hyun;Jung Yong-Chan;Koo Kyo-Jin;Hyun Chang-Taek
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.250-253
    • /
    • 2003
  • Many construction companies have been trying to extend their businesses to the development projects after IMF. Project financing was introduced to the construction market and has been popular with construction companies which can not furnish funds for project by themselves. But, there are so many problems that project financing has not been activated in the construction field. One of the main factors that disturb activation of project financing is distrust about construction management among participants. This distrust is caused by the lack of speciality, objectivity, clearness about CM. So, to process business successfully, they need specialty and objectivity for the construction management. In this research, I analyzed the role and duty of the main participants about CM in the development project ana suggested an advanced management structure in order to activate project financing in the development projects.

  • PDF

The Effect of Employee Education and Information Technology on Performance of Construction Companies - Empirical Analysis Using Financial Data - (교육훈련 및 운영정보화가 건설기업의 경영성과에 미치는 영향 - 재무자료를 이용한 실증분석 -)

  • Park, Hong-Jo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.19 no.2
    • /
    • pp.149-156
    • /
    • 2019
  • This study empirically verified whether or not employee education and information technology have impact on the enhancement of financial performance to Korean construction companies. As a result, the increasing of education & IT expenses turned out to be affected the improvement of sales performance. The influences of these increased expenses are effective at the only year just after expenditure. The positive effect of education & IT expenses increasing have an effect on operating profitability as well such as increasing of operating income. Additionally, the effect of education expenses are more positive in general construction & building construction than other subdivision of construction industry. The positive effect of IT expenses increasing in specialty construction industry overwhelm the other subdivisions. The results suggest that increased investment to the education & IT systems of Korean construction companies can lead improvement of sales and operating income.

An Improvement Plan of Business Bounded System for Efficiency at Construction Industry through Game Theory (건설산업 효율성 향상을 위한 건설 업역 관련 제도 개선 방안)

  • Chang Su-Zin
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.388-393
    • /
    • 2004
  • The organic law on the Construction Industry, initially, this law was enacted with a view to preserving and fostering the specialty of each type of industry. By dividing each construction business boundary, it gradually settles the system of construction specialized on the basis of productive stages. Controversy over the abolishing regulations on business boundary still continues to swirl. Since the intensity of exclusion as well as rigidities become increased. This results from the fact that informations are not shared among business boundary and businesses under the protection of the business boundary regulations choose 'rent-sicking activity'. According to dissidents against this law, structure should be established not by artificially enforced institution but by voluntary efforts of participants in construction industry. This paper aims at improving the competitive of the construction industry by showing the efficient system of construction and proving the legitimacy of abolishing business boundary

  • PDF

Improvement for the Point at Issue of National Construction Management Professional Certified in Korea - in view of Compararive Analysis for CM Certification of Korea vs US - (국내 건설사업관리(CM) 인증자격의 문제점 및 개선방안 - 한국과 미국의 인증자격 비교분석을 중심으로 -)

  • Kim Chang-Gyo;Chun Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2004.11a
    • /
    • pp.79-86
    • /
    • 2004
  • The technical expert standing system of our const겨ction industry is operated by the Ministry of Labor subjective national technical qualification law, as the professional engineer, architect and architect-engineer and so on. The construction management(CM) which is introduced on middle 1990 activates a building industry the condition of the essential indispensability for is becoming, is not officially recognized with national qualification to be, that as pending issue it is most urgent, the specialty manpower positivity which is judged as the nostril poop]e for qualification of the civil CM educational institutions has the certification which is a each educational program and a separate way and it is the actual condition which is become accomplished. The problem when as international certification the CMAA which is only it secures a reliability certification which is a CCM and SAVE seeing in the certified which is a CVS, compares in the foreign nation and the CM certification is excessive, it does not secure a reliability and an efficient characteristic to give a confusion to the capital increase lattices which in a condition are, it is mass produced it is a point. It saw from, it observes the capital increase reserve problem point which is a domestic CM and the certification integration which is a report and system anger it leads and with national certified qualification it develops to present the improvement program for, it does to sleep.

  • PDF

Benchmarking of Strategic Performance of Global Top Construction Firms (사업구조 전략 분석을 통한 세계 선진기업 선정 및 특성분석)

  • Woo, Jung-Suk;Jang, Hyoun-Seung;Choi, Seok-In;Park, Chan-Sik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.10 no.3
    • /
    • pp.122-129
    • /
    • 2009
  • Strategic planning is an essential function of senior management in any business firm. Planning involves the firm's behavior in an competitive market and adaptation of the company's resources towards the selected market strategy. This study presents a methodological procedure for strategic planning in global top-tier construction firms. This procedure consists of the following stages. First, analyzed growth of revenue in which weight of total construction firms' revenue shown in Global Top 225 Contractors(ENR). Second, analyzed specialty of construction products. The products are General Building, Power, Water Supply, Industrial/Petroleum Process, and Transportation. Third, analyzed business the portfolio plan. The business portfolio plan includes both local/overseas market and specification/diversification of construction products. It affects the subsequent choice of a benchmarking for development of each construction company. The choice of the benchmarking firm, among several available alternatives, should follow a careful analysis of the characteristics and benefits inherent in the implementation of each.

A Study on Risk Factor Identification by Specialty Construction Industry Sector through Construction Accident Cases : Focused on the Insurance Data of Specialty Construction Worker (건설재해사례 분석에 의한 전문건설업종별 위험요인 탐색 : 전문건설업 근로자 공제자료를 중심으로)

  • Lee, Young Jai;Kang, Seong Kyung;Yu, Hwan
    • Journal of Korea Society of Industrial Information Systems
    • /
    • v.24 no.1
    • /
    • pp.45-63
    • /
    • 2019
  • The number of domestic construction company is expanding every year while the construction workers' exposure to disaster risk is increasing due to technological advancements and popularity of high-rise buildings. In particular, the industry faces greater fatalities and severe large scale accidents because of construction industry characteristics including influx of foreign workers with different language and culture, large number of aged workers, outsourcing, high place work, heavy machine construction. The construction industry is labor-intensive, which is to be completed under given timeline and consists of unique working environment with a lot of night shifts. In addition, when a fixed construction budget is not secured, there is less investment in safety management resulting in poor risk management at the construction site. Taking account that the construction industry has higher accident risk rate and fatality rate, risky and unique working environment, and various labor pool from foreign to aged workers, preemptive safety management through risk factor identification is a mandatory requirement for the construction industry and site. The study analyzes about 8,500 cases of construction accidents that occurred over the past 10 years and identified risk factor by construction industry sector to secure a systematic insight for risk management. Based on interrelation analysis between accident types, work types, original cause materials and assailing materials, there is correlation between each analysis factor and work industry. Especially for work types, there is great correlation between work tasks and industry type. For reinforced concrete and earthwork are among the most frequent types of accidents, and they are not only high in frequency of accidents, but also have a high risk in categories of occurrence.

A Study on applied possibility of Organic Form In Architectural space-Design (공간구성에 있어서 유기적 형태의 응용 가능성에 관한 연구)

  • 김성혜
    • Korean Institute of Interior Design Journal
    • /
    • no.14
    • /
    • pp.10-18
    • /
    • 1998
  • This study aims to make clear visual quality of organic form and structural order that is immanent in nature about a form as formative principles of architectural space design the significanced of this study is to prove the application possibility in to functional form architectural space design. All organic forms in nature has a unique shape and pattern in structure to be self-controled and good in order. Such an order in nature comes from regular construction and ratio principles which has aesthetical order by mathmetics. The specialty of beauty in nature can be revealed not only visual form but also the ratio balance and rhythm of structural principles. As we examine the aesthetic source embodied some object can be developed in to basic principles. Furthermore through this study we can find out that the form construction theory in nature forms share the quality attribute with geometrical form to be shown in architectural space design. Natural forms are ultimate visual expression of power that effects on the architectural space design. The rule of power in nature as nature formal characteristics have a direct influence and can be also applied to architectural construction. Therefore I expect that this study will be linked and continued to another structural view.

  • PDF