Journal of the Society of Naval Architects of Korea
/
v.44
no.3
s.153
/
pp.340-347
/
2007
Main purpose of the study is to develop a transit model for icebreaking cargo vessels in the Northern Sea Route and to select optimum sea routes with the shortest navigation time and the lowest operation cost. This numerical model executed with basic information such as ship capabilities, transit directions and months of transit, can calculate total transit distance and elapsed time, mean speed, operation cost for each vessel. In the transit model. environment information such as the site-specific ice conditions, wave and wind states are utilized for four different months (April, June, August, and October) along the Northern Sea Route. The model also defines a necessary period of an icebreaker escort. Then the optimum sea routes are selected and visually displayed on the digital map using a commercial software ArcGIS. Usefulness of the selected sea routes is discussed.
Journal of the Korea Academia-Industrial cooperation Society
/
v.11
no.4
/
pp.1239-1247
/
2010
In this paper, we were researched decision problem called an optimal release policies after testing a software system in development phase and transferring it to the user. The applied model of release time exploited infinite failure non-homogeneous Poisson process This infinite failure non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The intensity function used Gompertz, Preto and Log-logstic pattern which has the efficient various property. Thus, optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.
Journal of the Korea Academia-Industrial cooperation Society
/
v.10
no.8
/
pp.1903-1910
/
2009
In this paper, we were researched decision problem called an optimal release policies after testing a software system in development phase and transferring it to the user. The applied model of release time exploited infinite failure non-homogeneous Poisson process This infinite failure non-homogeneous Poisson process is a model which reflects the possibility of introducing new faults when correcting or modifying the software. The failure life-cycle distribution used the Weibull distribution which has the efficient various property which has the place efficient quality. Thus, optimal software release policies which minimize a total average software cost of development and maintenance under the constraint of satisfying a software reliability requirement becomes an optimal release policies. In a numerical example, after trend test applied and estimated the parameters using maximum likelihood estimation of inter-failure time data, estimated software optimal release time.
KSII Transactions on Internet and Information Systems (TIIS)
/
v.10
no.8
/
pp.3689-3700
/
2016
It is not practically feasible to apply hardware-based fault-tolerant schemes, such as hardware replication, in mobile devices. Therefore, software-based fault-tolerance techniques, such as checkpoint and rollback schemes, are required. In checkpoint and rollback schemes, the optimal checkpoint interval should be applied to obtain the best performance. Most previous studies focused on minimizing the expected execution time or response time for completing a given task. Currently, most mobile applications run in real-time environments. Therefore, it is extremely essential for mobile devices to employ optimal checkpoint intervals as determined by the real-time constraints of tasks. In this study, we tackle the problem of determining the optimal inter-checkpoint interval of checkpoint and rollback schemes to maximize the deadline meet ratio in real-time systems and to build a probabilistic cost model. From this cost model, we can numerically find the optimal checkpoint interval using mathematical tools. The performance of the proposed solution is evaluated using analytical estimates.
Journal of Information Technology Applications and Management
/
v.9
no.3
/
pp.113-127
/
2002
The effort for software process improvement is lately surging its interest though it does not satisfy both developer and receiver In terms of low productivity, quality, delay and increasing cost. According to current research, software process improvement contributes to improvement of productivity, its Duality, reduction of development time and cost, and the prediction of the time limit for delivery, which means software process improvement affects competitive advantage among developers. The latest research is whether the investment for information technology substantially had effect on improvement of productivity. That is, software process improvement and maturity of software industries has influence upon economic efficiency and as a result, it plays an important role in whole industries. This research is that how does software process improvement using CMM (Capability Maturity Model) and SPICE (Software Process Improvement and Capability dEtermination) have a effect on factors of software engineering, and how does it have influence upon competitive advantage among SI firms. For this research, reusability, customizability, participation, and review & inspection are set to independent variable and process flexibility and process predictability are set to mediate Variable. Finally, competitive advantage among SI firms Is set to dependent variable. The targets for survey are laborers who work for SI firms. The result of this research is as follows: 1 ) Reusability, Customizability and participation is not rejected but review and Inspection is rejected in process flexibility which has significant level 0.05. 2) Reusability, Customizability and participation is not rejected but review and inspection Is rejected in process predictability which has significant level 0.05. 3) Process flexibility is not rejected and process predictability Is rejected in the competitive advantage of 51 industries which has significant level 0.05
Current Industrial and Technological Trends in Aerospace
/
v.9
no.1
/
pp.110-118
/
2011
In this paper, design techniques and technological trends applied on simulator development, which are based on Model Driven Architecture, are described. The methodology, process and modeling support tools for development of simulation software are introduced with both satisfaction of user's requirements and benefit to simulator developers of reducing cost. In addition, contents in ECSS standard for reusability of simulation model and its usages applied on industries are presented and major features of current technological changes with highlights of key-word are discussed.
Proceedings of the Korean Institute of Navigation and Port Research Conference
/
2015.07a
/
pp.171-172
/
2015
Vinalines is actually known as not only one of Vietnam's state-sponsored economic giants but also the largest shipowner by tonnage in Vietnamese shipping industry. Therefore, a question of how to improve business performance of the corporation is always received deep attention by Vietnamese government, specially after the seriously economic scandal of Vinalines in a last few years. Among development strategies, the study focuses on short-term one in which Vinalines is recommended to restructure its own fleet in order to optimize performance of fleet operation and minimize costs while meeting the customer's shipping demand in near future. The first section is of introduction. Via method of statistical data analysis, section 2 brings to readers a panorama about the development profile and the current situation of development of Vinalines. In section 3, the authors use linear programming for setting a cost-minimization model optimizing Vinalines fleet structure based on available statistics and forecast information by Vinalines. The optimization problem is solved by applying AIMMS software in section 4. Finally, some conclusions and proposals by authors for the development of Vinalines are given.
Journal of Korean Society for Geospatial Information Science
/
v.12
no.1
s.28
/
pp.79-85
/
2004
The GIS(Geographic Information System) projects require big initial investment and cost of maintenance. Decision makers would not launch GIS projects unless they are convinced of the benefits of the projects. Therefore the purpose of this paper is to develop an appropriate model for GIS project evaluation. We proposed a GIS project evaluation model and summarize the steps involved in Cost-Benefit Analysis(CBA). The costs of a GIS implementation include hardware and software cost, costs of database development, training expenses, annual maintenance expenses, and other annual expenses. The benefit by using GIS has been assessed into Type I(direct benefits), Type II(indirect benefits), Type III(benefits that result from the sale of information services), Type IV(intangible benefits).
The success of a software development project can be determined by the use of QCD. And as a software's size and complexity increase, the importance of early quality assurance rises. Therefore, more effort should be given to prevention, as opposed to correction. In order to provide a framework for the prevention of defects, defect detection activities such as peer review and testing, along with analysis of previous defects, is required. This entails a systematization and use of quality data from previous development efforts. FMEA, which is utilized for system safety assurance, can be applied as a means of software defect prevention. SW-FMEA (Software Failure Mode Effect Analysis) attempts to prevent defects by predicting likely defects. Presently, it has been applied to requirement analysis and design. SW-FMEA utilizes measured data from development activities, and can be used for defect prevention on both the development and management sides, for example, in planning, analysis, design, peer reviews, testing, risk management, and so forth. This research discusses about related methodology and proposes defect prevention model based on SW-FMEA. Proposed model is extended SW-FMEA that focuses on system analysis and design. The model not only supports verification and validation effectively, but is useful for reducing defect detection.
Journal of Korean Society of Industrial and Systems Engineering
/
v.39
no.4
/
pp.137-146
/
2016
In recent years, business environment is faced with multi uncertainty that have not been suffered in the past. As supply chain is getting expanded and longer, the flow of information, material and production is also being complicated. It is well known that development service industry using application software has various uncertainty in random events such as supply and demand fluctuation of developer's capcity, project effective date after winning a contract, manpower cost (or revenue), subcontract cost (or purchase), and overrun due to developer's skill-level. This study intends to social contribution through attempts to optimize enterprise's goal by supply chain management platform to balance demand and supply and stochastic programming which is basically applied in order to solve uncertainty considering economical and operational risk at solution supplier. In Particular, this study emphasizes to determine allocation of internal and external manpower of developers using S&OP (Sales & Operations Planning) as monthly resource input has constraint on resource's capability that shared in industry or task. This study is to verify how Stochastic Programming such as Markowitz's MV (Mean Variance) model or 2-Stage Recourse Model is flexible and efficient than Deterministic Programming in software enterprise field by experiment with process and data from service industry which is manufacturing software and performing projects. In addition, this study is also to analysis how profit and labor input plan according to scope of uncertainty is changed based on Pareto Optimal, then lastly it is to enumerate limitation of the study extracted drawback which can be happened in real business environment and to contribute direction in future research considering another applicable methodology.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.