• Title/Summary/Keyword: Soft Schedule

Search Result 20, Processing Time 0.024 seconds

A BLOG BASED RISK MANAGEMENT SYSTEM USING SOFT SCHEDULE

  • Soo-Myeong Jin;You-Sang Yoon;Myung-Houn Jang;Sang-Wook Suh
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.1334-1339
    • /
    • 2009
  • To achieve the best performance of a project, uncertainties involved in the building construction process need to be identified in the planning phase of the project. Uncertainties seldom create a positive impact on construction project, but they almost cause delay and increase costs. Therefore, risk management plays a significant role in construction to minimize risk occurred due to uncertainties of a project. Although the importance of the risk management has been known to the construction industry, it is not enough to be developed to meet the demands of the industry. It has not been enough for Systems to control schedule risks for managers in the field. Therefore, a tool is necessary to efficiently control risks. The propose of this study is to invent Schedule Risk Control System Module to prepare for risks in preconstruction phase.

  • PDF

The Short-Term Effects of Soft Pellets on Lipogenesis and Insulin Sensitivity in Rats

  • Bae, Cho-Rong;Hasegawa, Kazuya;Akieda-Asai, Sayaka;Kawasaki, Yurie;Cha, Youn-Soo;Date, Yukari
    • Preventive Nutrition and Food Science
    • /
    • v.19 no.3
    • /
    • pp.164-169
    • /
    • 2014
  • The purpose of the present study was to investigate the short-term effects of a 12-day, soft pellet (SP) diet with a 3-h restricted feeding schedule on caloric intake, body weight, lipid metabolism, and insulin sensitivity. Glucose and insulin levels were measured pre-, mid-, and post-feeding. The SP rats exhibited postprandial hyperglycemia compared to rats fed control pellets (CP). The insulin response of SP rats during a meal was significantly higher than that of CP rats. There were no significant differences in the hepatic triacylglycerol contents and lipogenesis gene mRNA levels of SP and CP rats. However, the hepatocytes of SP rats were slightly hypertrophic. In addition, histological analysis revealed that the pancreases of SP rats had more islet areas than those of CP rats. This study demonstrated that feeding an SP-only diet for 12 days induces glucose intolerance, suggesting that the consumption of absorbable food, like a soft diet, may trigger glucose metabolism insufficiency and lead to life-threatening diseases.

Countable-grid Scheduling Method (CSM) and CSM-based Soft-logic Algorithm Development for Automated Construction Scheduling and Visualization (건설 공정계획 자동화와 시각화를 위한 가산 그리드 공정계획 기법(CSM)과 CSM기반 소프트로직 알고리즘 개발 연구)

  • Choi, Heungsoon;Moon, Seonghyeon;Chi, Seokho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.4
    • /
    • pp.65-77
    • /
    • 2022
  • Schedule management is one of pivotal project success factors during construction projects. However, there are many difficulties in rapid scheduling and controlling since the existing planning techniques require considerable amount of manual work and manager's judgment in a construction project. This research aims to propose a new scheduling method and algorithm for automating and visualizing the planning process, which is called Countable-grid scheduling method. In this method, if the scope of work is defined via a visualized tool, the schedule plan is created automatically according to the productivity and workable conditions of each activity. The location of the work for each date can be visualized in grid-based approach. Moreover, the work schedule can be updated automatically according to the progress. The industrial applicability of the proposed method was verified in construction projects via case study with sample data. This research can contribute to the construction industry by automating the construction schedule management process.

Engineering Geology of Soft Marine Sediments along the Western Coastal Area of korea (한국 서해안의 연약한 해성 퇴적층에 관한 지질공학적 고찰)

  • 송병무
    • The Journal of Engineering Geology
    • /
    • v.4 no.1
    • /
    • pp.79-90
    • /
    • 1994
  • Development of industries and increasing population demand civil engineering projects of various types and sizes to be looated along the ooastal aaaas where extremely soft marine sedirnents are encountered. These sediments present settlement and stability problems, among others, and consequently, cost increase and schedule delay are resulted.Insulfident understanding of the basic nature of the soft formations dulling design and construction phases result in catastrophicfailures all too often. In order to provide safe and economic solutions to these problems, utilization of various related disciplines should be made for analyses. However, this paper will primarily rely in portions of paleoclimatology, sedimentology, and soil mechanics to define the problems and to provide basic understanding of the sediment, and the directions and methodology for the analyses.

  • PDF

Efficient VLSI Architecture for Factorization in Soft-Decision Reed-Solomon List Decoding (연판정 Reed-Solomon 리스트 디코딩의 Factorization을 위한 효율적인 VLSI 구조)

  • Lee, Sung-Man;Park, Tae-Guen
    • Journal of the Institute of Electronics Engineers of Korea SD
    • /
    • v.47 no.11
    • /
    • pp.54-64
    • /
    • 2010
  • Reed-Solomon (RS) codes are the most widely used error correcting codes in digital communications and data storage. Recently, Sudan found algorithm of list decoder for RS codes. List decoder has larger decoding radius than conventional hard-decision decoding algorithms and return more than one candidate polynomial. But, the algorithm includes interpolation and factorization step that demand massive computations. In this paper, an efficient architecture and processing schedule are proposed. The architecture consists of R-MAC, memories, and control unit. The R-MAC computes both of RC and PU steps that are main part of the factorization algorithm. The proposed architecture can achieve higher hardware utilization efficiency (HUE) and throughput by using efficient processing schedule and memory architecture. Also, the architecture can be designed flexibly with scalability for various applications. We design and synthesize our architecture using Dongbu-Anam $0.18{\mu}m$ standard cell library and the maximum clock frequency is 330MHz.

The Survey on its Wearing Schedule of Workers Wearing Contact Lens (콘택트렌즈 착용 직장인의 착용시간에 관한 조사)

  • Kim, Ki-Sung;Kim, Sun-Kyung;Kim, Hyojin
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.20 no.1
    • /
    • pp.43-49
    • /
    • 2015
  • Purpose: This study was to compare the habitual soft contact lens wear to recommended wearing schedule for subjects and suggest a clinical guideline for prescribing contact lens. Methods: 611 adults (39 men and 572 women) with contact lens experience took part in this study. The survey collected information about current wearing schedule (hours/day and days/week), types of lenses worn and awareness of recommended wear schedule. Results: The subjects wore the daily contact lens for $7.97{\pm}3.60$ hours/day in average. Of these, 247 subjects (40.4%) exceeded the recommended wear schedule and 36 (5.9%) wore for over 15 hours. It turned out that subjects with 3-month extended contact lenses and the ones with the conventional daily wear wore for $9.79{\pm}2.68$ hours and $8.98{\pm}3.30$ hours/day, respectively. For subjects wearing contact lenses longer than five days/week it tended to wear for over 9 hours. Those who were aware of the wear schedule were 293 (48.0%), and those not were 318 (52.0%). 56.7% of subjects who were aware of the wear schedule respected the recommendation whereas only 22.3% of those unaware of it were found to respect it. The possibility to respect the wear schedule was 4.55 times higher when wearers were aware of it. Conclusions: Korean office workers wearing contact lenses wore for $7.97{\pm}3.60$ hours/day. 247 (40.4%) of subjects wore contact lens longer than recommended wear schedule. This implies that it will need to educate contact lens wearer about recommended wear schedule and advice for the long time wearer.

Investigation on economical method of foundation construction on soft soils in seismic zones: A case study in southern Iran

  • Javad Jalili;Farajdollah Askari;Ebrahim Haghshenas;Azadeh Marghaiezadeh
    • Geomechanics and Engineering
    • /
    • v.32 no.2
    • /
    • pp.209-232
    • /
    • 2023
  • A comprehensive study was conducted to design economical foundations for a number of buildings on soft cohesive soil in the southern coastal regions of Iran. Both static and seismic loads were considered in the design process. Cyclic experiments indicated that the cohesive soil of the area has potential for softening. Consequently, the major challenge in the design stages was relatively high dimensions of settlement, under both static and seismic loadings. Routine soil-improvement methods were too costly for the vast area of the project. After detailed numerical modeling of different scenarios, we concluded that, in following a performance-based design approach and applying a special time schedule of construction, most of the settlement would dissipate during the construction of the buildings. Making the foundation as rigid as possible was another way to prevent any probable differential settlement. Stiff subgrade of stone and lime mortar under the grid foundation and a reinforced concrete slab on the foundation were considered as appropriate to this effect. In favor of an economical design, in case the design earthquake strikes the site, the estimations indicate no collapse of the buildings even if considerable uniform settlements may occur. This is a considerable alternative design to costly soil-improvement methods.

Treatment of soft Tissue Sarcoma by General Orthopedic Surgeon Rather than Orthopedic Oncologist (골연부조직 종양 전공자가 아닌 일반 정형외과 전문의에 의해 치료된 연부조직육종)

  • Lee, Soon-Hyuck;Park, Jong-Hoon;Park, Sang-Won;Choi, In-Chung;Han, Seung-Beom;Lee, Suk-Ha;Kim, Ho-Joong
    • The Journal of the Korean bone and joint tumor society
    • /
    • v.13 no.2
    • /
    • pp.75-80
    • /
    • 2007
  • Purpose: To investigate the quality of training hospital based treatment, we evaluated the soft tissue sarcoma treatments afforded by general orthopedic surgeon rather than orthopedic oncologist. Materials and Methods: We reviewed the details of 25 patients with pathologically confirmed soft tissue sarcoma who registered in our hospital between July 1997 and 2006 September. We evaluated initial diagnoses, the surgical treatment (including adjuvant therapy) and the follow up method used and related these to the principles of soft tissue sarcoma treatment. Results: The study cohort comprised 16 men and 9 women of mean age of 50.2 years. A diagnostic biopsy was performed in 9(36%) cases before definitive surgical treatment. Wide excision was performed in 13(52%) cases. For the 12 cases in which the grade of sarcoma was estimated, adequate surgical treatment with adjuvant therapy was performed only in 4(33.3%) cases. In addition, an adequate follow up schedule was adopted in only 4(16%) of the 25 study subjects. Conclusion: Unexpectedly, many cases of soft tissue sarcoma were treated inadequately even in a training hospital. An intensive education program on the treatment of soft tissue sarcoma is necessary for all orthopedic surgeons.

  • PDF

The status of care for Soft Contact Lens and periodic examination (연성 콘택트렌즈의 관리 및 정기검사 실태)

  • Shin, Jang Cheol
    • Journal of Korean Ophthalmic Optics Society
    • /
    • v.5 no.2
    • /
    • pp.107-113
    • /
    • 2000
  • This study has analyzed soft contact lens care-after-sale and periodic examinations at optical shops and eye clinics. And I wish to make that use of educational data for the soft contact lens lesson of the department of ocular optics. This questionnaire studied the status of care for soft contact lens and periodic examination, of students who wears soft contact lens. The results are as follows: First, 7.5% of students questioned wore soft contact lens. More women than men wore soft contact lens. The soft contact lens wearers purchased lens mainly at optical shops. 78.5% of them wore daily wear lens. Because of cosmetic advantages of soft contact lens. 47.9% of them wore soft contact lens. 72.5% of them wore soft contact lens less than 12 hours per a day. 32.0% of them has worn soft contact lens more than 6 months less than 1 year. 51.1% of them experienced irritation. 39.7% of them have exchanged soft contact lens between 6 and 9 months. Secondly, when purchasing lenses. 60% of soft contact lens wearers were given instructions of general care, such as duration of wearing lens, how to remove protein, how to store, and how to sterilize at both of eye clinics and optical shops. But the proportion of instructions, such as side effects and periodic examination which were given to soft contact lens wearers, is lower both at eye clinics and optical shops. Especially at optical shops, the proportion of instruction for periodic examination, is lower than at eye clinics(p<0.05). Thirdly, The proportion of operations of periodic examinations after use of soft contact lens both at eye clinics and optical shops, is low. The soft contact lens wearers have had more periodic examinations at eye clinics than at optical shops. But the rate of non-periodic examination at optical shop is 87.9%. And for periodic examinations, general care was done at optical shops. On the other hand, eye examinations, general care, and treatments were done more at eye clinics. Fourthly, 60.3% of the soft contact lens wearers understood the necessity of the periodic examinations, but actually, only 6.4% of them were given the schedule for the periodic examinations, and 2.5% of them were given at an optical shop(p<0.01).

  • PDF

Development of Generator Maintenance Scheduling Program (발전기 예방정비계획 전산모형 개발)

  • Park, Jong-Bae;Jeong, Yun-Won;Joo, Haeng-Ro;Yi, Myoung-Hee;Shin, Jum-Gu
    • Proceedings of the KIEE Conference
    • /
    • 2006.07a
    • /
    • pp.216-217
    • /
    • 2006
  • This paper presents development of program for generator maintenance scheduling. The maintenance scheduling of generating units is a dynamic discrete combinatorial optimization problem with constraints to determine the optimal maintenance periods of each generating units for a given planning periods. The developed program is designed so as to provide the maintenance schedule satisfying the operating reserve margin levelization and the procurement of proper reliability. In order to verify the effectiveness of the developed program, the numerical study has been performed with the practical data in 2005.

  • PDF