• Title/Summary/Keyword: Six Sigma Performance

Search Result 111, Processing Time 0.022 seconds

The Effects of Correct Implementation of Six Sigma Practices on Customer Focus Performance, Quality Performance and Business Performance (식스시그마의 올바른 실행이 고객관점 성과, 품질성과 및 사업성과에 미치는 영향)

  • Yoon, Jae-Hong
    • Korean Management Science Review
    • /
    • v.30 no.1
    • /
    • pp.59-72
    • /
    • 2013
  • This research has seven factors such as top management leadership, belt system operation, implementation of systematic methods, adequate project performance measurement, customer focus performance, quality performance and business performance. Those are critical to correct implementation of Six Sigma. I set seven hypotheses which represented the relationships among the seven factors, gathered questionnaires and analyzed the data. Top management leadership affected positively the adequate project performance measurement and the belt system operation, The belt system operation affected the implementation of systematic methods positively and it also affected the adequate project performance measurement. It affected positively the customer focus performance, the quality performance and the business performance, respectively.

An Empirical Study on Performance of Six Sigma Tools in Korean Service Industry (한국 서비스산업의 6시그마 기법 시행과 그 성과에 관한 실증적 연구)

  • 장대성;양종곤;황인천
    • Journal of Korean Society for Quality Management
    • /
    • v.32 no.1
    • /
    • pp.1-20
    • /
    • 2004
  • Six sigma has been the most influential management innovation program since 1996 in Korea. As a result of successful implementation of 6 sigma, there have been a number of dramatic quality improvement cases. However, no empirical study of 6 sigma implementation study has done especially in the service industry of Korea. This article reviews status of finance companies which implemented 6 sigma programs in Korea and then demonstrates the relationship between 6 sigma problem solving tools such as analysis of variance and graph techniques, etc and project success and operational performance. Customer survey tools, process analysis, and documentation tool are identified as influential tools on project success. Tools of measure steps, customer survey tools, and documentation tool are found as influential tools on operational performance.

A Study on TOC Application in the 6 Sigma Quality Management (6시그마 품질경영 활동에서 TOC 적용방안)

  • 고현우
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.27 no.1
    • /
    • pp.103-108
    • /
    • 2004
  • Companies adopted a program called Six Sigma, in order to make fundamental changes in the way the company operated to fulfill customers' expectations. Six Sigma reduces the occurrence of defects. This approach derives the overall process of selection the right projects based on their potential to improve performance metrics and selection and training the right people to get the business results. However, in the course of Six Sigma process steps, companies are in the face of problems. This study is to solve the problems using TOC(Theory of Constrains). TOC is methodology for solving key problem in system which is called Constraints. Nowadays, its application is going to be wide and its concept is being implemented. In this paper, it is showed possibility of application TOC to Six Sigma.

Case study: Improvement of Purchase Conversion Rate in Mobile Game Site using Six Sigma Process (6시그마 프로세스를 활용한 모바일 게임 사이트의 구매 전환율 향상에 관한 사례연구)

  • Kim, Yong-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.37 no.3
    • /
    • pp.74-82
    • /
    • 2009
  • This article presents a six sigma project for improving purchase conversion rate in mobile game site. The project was carried out based on DMAIC process. First, a defect rate is defined as low purchase conversion rate. In addition, 60-days purchase data was analyzed and it is shown that the defects level was 2.48 sigma level. In this study, in order to raise the sigma level, six personalization services were used in the mobile game site. Six factors were determined based on FDPM(Functional Deployment Process Map), fishbone chart, linear regression analysis, effort-performance matrix, and so on. The sigma level of defects has improved from 2.48 to 2.93.

A study regarding an TP(Thinking process) Application Plan for selecting the CTQ(Critical To Quality) of 6 Sigma (6시그마의 CTQ(Critical To Quality)선정을 위한 TP(Thinking Process) 활용 방안에 관한 연구)

  • Lee Jeong Seop;Seo Jang Hun;Park Myeong Gyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2004.11a
    • /
    • pp.81-85
    • /
    • 2004
  • Companies adopted a program called Six Sigma, in order to make fundamental changes in the way the company operated to fulfill customers' expectations. Six Sigma reduces the occurrence of defects. This approach derives the overall process of selection the right projects based on their potential to improve performance metrics and selection and training the right people to get the business results. However, in the course of Six Sigma process steps, companies are in the face of problems. This study is to solve the problems using TP(Thinking Process) of TOC(Theory of Constraints). TOC is methodology for solving key problem in system which is called Constraints. Nowadays, its application is going to be wide and its concept is being implemented. In this paper, it is showed possibility of application TOC to Six Sigma.

  • PDF

The Model Development of 6 Sigma and Understanding of Process Quality in the Service Industry : Using the Structural Equation Modeling (서비스 조직에서의 프로세스품질에 대한 이해와 6시그마 모형개발 : 구조방정식 모형분석 이용)

  • Kim, Gye-Soo
    • Journal of Korean Society for Quality Management
    • /
    • v.35 no.2
    • /
    • pp.84-98
    • /
    • 2007
  • Six Sigma advocates rigorous application of quality management tool. Using Six Sigma program provides a mechanism for service organization to achieve organization's goal and customer satisfaction. A model on Six sigma in service organization was developed and applied for the service organization. Questionnaire was developed, and data was collected and analyzed for this study. Conclusively, 6 sigma leadership is the important drivers to process management and customer relationship management. Process management and customer relationship management are significantly related to the job performance and customer satisfaction.

A Case Study on the Performance Analysis for Applying 6 sigma to a Construction Company (건설업체의 6시그마 적용 성과 분석에 관한 사Bll 연구 -S 건설업체를 중심으로-)

  • Kim Se-Won;Hwang Uk-Sun;Kim Sun-Kuk;Kim Yong-Su
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.4 s.26
    • /
    • pp.133-141
    • /
    • 2005
  • The object of this study is to present performance by applying six sigma quality management to a construction company. The research method involves to investigate and analyze data regarding six sigma projects in S construction company and a questionnaire survey from the personnel of the S construction company. The results of this study are as follows 1) S construction company utilized the six sigma quality management for 258 projects during the years of 2003 and 2004 and this bring the effect of cost reduction for quality. Moreover, before using the six sigma quality management, the average level of sigma in this company was around 2.8, after using this, the level increased to 3.6. Particularly, the construction management part, the level increased from 1.3 to 2.6.2) respondents recognize that quality management costs by applying six sigma is reduced. but there is only a little operational efficiency because it is In the early stage of applying six sigma quality management.

Implementation of Z-Factor Statistics for Performance Evaluation of Quality Innovation in the High Throughput Process (High Throughput 프로세스에서 품질혁신의 성능평가를 위한 Z-Factor의 적용방안)

  • Choi, Sung-Woon
    • Journal of the Korea Safety Management & Science
    • /
    • v.15 no.1
    • /
    • pp.293-301
    • /
    • 2013
  • The purpose of this study is to introduce the limit of previously used six sigma quality process evaluation metrics, $Z_{st}$ and $P_{pk}$, and a solution to overcome this drawback by using a metric based on performance evaluation of Z-factor quality innovation. Case analysis on projects from national six sigma contest from 2011 to 2012 is performed and literature review on new drug development HTS (High Throughput Screening) is used to propose innovative performance evaluation metrics. This research shows that experimental study on six sigma evaluation metric, $Z_{st}$ and $P_{pk}$, have no significance difference between industrial type (Manufacturing, Semi-Public Institute, Public Institute) and CTQ type (Product Technology Type CTQ, Process Technology Type CTQ). Following discovery characterize this quality improvement as fixed target type project. As newly developed moving target type of quality innovation performance metric Z-Factor is used for evaluating experimental study, hypothetical analysis suggests that $Z_{st}$ and $P_{pk}$ share different relationship or even show reciprocal relationship. Constraints of the study are relatively small sample size of only 37 projects from past 2 years and conflict on having interview and communication with six sigma quality practitioner for qualitative experimental study. Both moving target type six sigma innovation project and fixed target type improvement project or quality circle enables efficient ways for a better understanding and quality practitioner use by applying quality innovation performance metric. Downside of fixed target type quality performance evaluation metric, $Z_{st}$ and $P_{pk}$, is presented through experimental study. In contrast, advantage of this study is that high throughput requiring product technology, process technology and quantum leap typed innovation effect is evaluated based on precision and accuracy and Z-Factor that enables relative comparison between enterprises is proposed and implemented.

A Study on an appling plan of Six Sigma for IS(Information Systems) Performance Management (정보시스템 성과 관리를 위한 6시그마 활용 방안에 관한 연구)

  • Lee Jeong-Seop;Kim Jong-Gi;Park Myeong-Gyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2005.05a
    • /
    • pp.59-64
    • /
    • 2005
  • Information systems introduction and application are increasing suddenly from the enterprises while approaching the information age. It requires to manage the IS performance and understand quality of information systems for obtaining the competitive power of the enterprise through IS. Six Sigma is widely recognized today as a process improvement methodology that can cut costs and eliminate defects in information industry as well as manufacturing processes. This study provides a framework for managing performance of information systems which are used to obtain competitive advantage.

  • PDF

A Program Level Application of Design for Six Sigma in the Aircraft Industry

  • Yoon, Hee-Kweon;Byun, Jai-Hyun
    • Industrial Engineering and Management Systems
    • /
    • v.10 no.3
    • /
    • pp.232-237
    • /
    • 2011
  • Design for Six Sigma (DFSS) has been implemented in many companies to enhance their business performance and customer satisfaction. However, DFSS has not been widely applied to the aircraft industry which operates large, complex development programs. In this paper, the characteristics of an aeronautical product development program are analyzed to figure out the limitations of current DFSS methodology and the prerequisite to deployment of DFSS at the program level is suggested.